BLD-Final | 11/9/2006 | 11/13/2006 | 11/13/2006 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 11/13/2006 | 11/13/2006 | 11/13/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 11/8/2006 | 11/9/2006 | 11/9/2006 | P | FAIL |
Dave Hannah
|
|
|
larry ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith fire door into basement saftey glassing top of stairs fix gaurd rail secont floor balc .
|
BLD-Grading Inspection | 11/7/2006 | 11/7/2006 | 11/7/2006 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 8/30/2006 | 8/31/2006 | 8/31/2006 | A | PASS |
Tony Young
|
|
|
Larry; Phone #: ###-####
|
BLD-Energy code compliance | 8/29/2006 | 8/30/2006 | 8/30/2006 | A | PART |
Tony Young
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley they are putting in fire sprinklers,,need rough,, need truss info
|
BLD-Framing/Rough-in | 8/18/2006 | 8/18/2006 | 8/18/2006 | P | PART |
Tony Young
|
|
|
larry ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley truss fixes for missed bearing,, ok to insulate,, other c/n is ok need
|
BLD-Framing/Rough-in | 8/16/2006 | 8/17/2006 | 8/17/2006 | A | PART |
Dave Hannah
|
|
|
larry; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to insulate c/n on site
|
BLD-Wall cover | 5/12/2006 | 5/15/2006 | 5/15/2006 | P | PART |
Tony Young
|
|
|
larry Note: foundation wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wanted a foundation insp,, wip
|
BLD-Foundation | 5/15/2006 | 5/15/2006 | 5/15/2006 | P | PART |
Tony Young
|
|
|
larry Note: foundation wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles wip
|
BLD-Footing | 5/4/2006 | 5/5/2006 | 5/5/2006 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### ok now
|
BLD-Footing | 5/3/2006 | 5/4/2006 | 5/4/2006 | A | PART |
Tony Young
|
|
|
Larry; Phone #: ###-#### Internet Inspection Request from: Ione Coleman ok pending soils report
|
PubWorks Subgrade Approval | 5/4/2006 | 5/4/2006 | 5/4/2006 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 5/2/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 4/20/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/20/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/20/2006 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (SAM) | 2/16/2006 | 4/5/2006 | 4/19/2006 | | PASS |
|
|
|
4/19/2006 09:41:04 SAM - activity updated through activity BLDA022 from case BLD06-00392.
|
Routing - PLAN CHECK | 3/31/2006 | | 4/19/2006 | | PASS |
|
|
|
Routed to Cody for sign off. Plan review is done.
|
Routing - PLANNING | 4/10/2006 | | 4/19/2006 | | PASS |
|
|
|
Prior to occupancy of the house a recorded copy of the easement reviewed by legal must be submitted to Planning & Dev Services for records. This agreement must include language that the City needs to approve any modification. cr. A driveway may not exceed 33' wide in the fron setback. ctc
Recorded copy of agreement approved by legal on file with Records dept.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/19/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/19/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/10/2006 | | |
|
|
|
|
Plan Reviewer's activity | | | 4/6/2006 | | DONE |
|
|
|
4/6/06 09:25 I called and left a message for John Mortin to call me. I need foundation wall sections plus calculations for footings CF2 and CF3.
4/6/06 14:53 John Mortin called and left a message letting me know to reinforce the 8' retaining wall at stairs to basement per the 6' retaining wall requirements. I marked plans.
|
Routing - PLANNING | 2/28/2006 | | 3/31/2006 | | FAIL |
|
|
|
Plans may to continue to be reviewed. Planning is awaiting final documentation on access to the parcel. Please return to Cody Riddle prior to issuance.
|
Routing - FIRE | 3/1/2006 | | 3/2/2006 | | PASS |
|
|
|
Per 2/23/06 email from DM, "the project requires either a paved etc fire lane and fire hydrant; or a fire sprinkler system". Since plans do not indicate a compliant fire lane or fire hydrants, an approved 13D automatic sprinkler system shall be provided. SLR
|
Routing - Erosion and Sediment | 2/28/2006 | | 3/1/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING Land Div | 2/23/2006 | | 2/28/2006 | | PASS |
|
|
|
property is a platted lot.
|
Routing - PUBLIC WORKS GRADING | 2/16/2006 | | 2/21/2006 | | PASS |
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS | 2/21/2006 | | 2/21/2006 | | PASS |
|
|
|
|
Application received | | | 2/16/2006 | | |
|
|
|
|