Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD06-00400
StatusFinaled
Name J-P GRATIOT LLC
Site Address 1809 N WILDWOOD AVE
Project NameSTEELWOOD FLEX CONDOS
Customer Number 
ePlanReviewNo
Description
(RCE-1602 JIM GRATIOT)(BETTER HOMES ELECTRIC)(STEELWOOD FLEX CONDOS) To construct a new 1,400 sq. ft. office/warehouse tenant space within an existing 28,289 sq. ft. building per approved plans. Work to include new interior walls and doors, interior finish, new hard lid ceiling above office area, a new accessible restroom, fire sprinkler work, new mechanical, new plumbing, and new electrical work. A portion of the ceiling above the restroom and copy room is o.k. for light storage, 125 psf L.L. There is a combination of Nonseparated Uses and Separated Uses within this building. An R-2 Occupancy within the building is separated from other Occupancies in the building with 2-hour rated fire barriers. There is an existing 2-hour rated fire barrier wall for at least the north third of the east wall of this tenant space that is adjacent to an R-2 Occupancy on the second floor to the east of this space. This space is conditioned for heating only. No cooling. Natural ventilation with exterior openings utilized. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for area increase and story increase. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
First Notice 7/18/20067/26/2006 DONE
FIRE-Final Inspection7/12/20067/13/20067/13/2006APASS
DetailsTroy Cobbley
Life safety finaled
BLD-Final7/12/20067/13/20067/13/2006APASS
DetailsTom Arcoraci
JIM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles done by 316
Permanent Occupancy 7/13/20067/13/2006 DONE
Details
Permanent occupancy  7/13/2006 DONE
Perm. Occ. Cert. # 11131 issued 7-13-06 to Better Homes Electric.
FIRE-Final Inspection7/6/20067/7/20067/7/2006PFAIL
DetailsTroy Cobbley
The shell/core has not been called in for a final yet.
BLD-Final7/6/20067/7/20067/7/2006PPASS
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
OK for Perm Occ. :)
FIRE-Final Inspection7/5/20067/6/20067/6/2006APASS
DetailsTroy Cobbley
Permit finaled
BLD-Framing/Rough-in6/1/20066/2/20066/2/2006APASS
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Concrete5/16/20065/16/20065/16/2006PPART
DetailsMike Jordan
VERN ; Phone #: ###-#### Internet Inspection Request from: Darla Downs. interior slab on grade. wip, still needed to install dobies for proper clearaNCE on wire mesh.
Permit Ready to Issue  4/14/2006 DONE
Telephone call  4/14/2006 DONE
lft ms for paula gratiet ###-#### - will call again cmc
Issue PAID IN FULL permit  4/14/2006 DONE
Print Occupancy Form  4/13/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/12/2006 PASS
Routing - PLAN CHECK3/20/2006 4/12/2006 PASS
Permit and plans approved and taken to front desk.
Plan assigned to (JCB)2/27/2006 4/12/2006 PASS
4/12/2006 13:33:40 JCB - activity updated through activity BLDA022 from case BLD06-00400.
Telephone call  4/10/2006 DONE
Called Paula Gratiot to have her fax over a new updated Certificate of Value form and additional info. on the wall heaters in the office. She stated she would address and fax over info. later today.
Plan resubmittals received  4/5/2006  
Received 2 copies of A-1.0, A-2.0, A-3.0, A-4.0; Response letter, Revised cert of value, 2 of HVAC load calcs, 1 copy of Ultimate Proposal, 1 copy of fan forced wall heaters, 1 copy of heat trap fittings and taken to Jason B.
1st review completed  3/20/2006 PASS
Routing - FIRE3/17/2006 3/20/2006 PASS
Attached review comments to plans. Faxed review comments to architect.
Plan resubmittals requested  3/18/2006 DONE
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK3/6/2006 3/17/2006 FAIL
Plan review e-mailed and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to the Fire Dept. for review.
Routing - PLANNING2/28/2006 3/6/2006 PASS
Approved per DRH04-00230.
Routing - PUBLIC WORKS2/27/2006 2/28/2006 PASS
Application received  2/17/2006  
Recd Pcfee & Taken To Pln CK  2/17/2006  
Plans ACCEPTED BY PLAN TECH  2/17/2006  
Fee Review-notes2/17/20062/17/2006