Permit Information
Permit NumberBLD06-00401
StatusFinaled
Name NEW YORK LIFE
Site Address 1109 W MYRTLE ST Unit: 300
Project NamePIONEER PLAZA-3RD FLR
Customer Number 
ePlanReviewNo
Description
RCE #35. (NEW YORK LIFE)(PIONEER PLAZA - STE 300) Remodel for a new 9,558 sq. ft. office tenant that will occupy the entire third floor of an existing building per approved plans. Work to include some miscellaneous interior demolition work, slightly altering existing elevator/stair/restroom lobby, new interior walls, interior doors and windows, interior finish, some small areas of suspended ceiling work, new counters/casework, fire sprinkler work including providing quick-response heads on the entire floor, mechanical work, plumbing work, and electrical work. A Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is fully fire sprinklered for one-hour substitution. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD8/18/20068/18/20065/10/2007 DONE
Second Notice has not been responded to.
Telephone call  5/2/2007 DONE
call to raeline w/ vertical, she will fax fv cert in.
Second Notice BLD7/7/20067/7/20068/18/2006 DONE
First Notice has not been responded to.
First Notice 6/9/20067/7/2006 DONE
Permanent occupancy  6/9/2006 DONE
Perm. Occ. Cert. # 11062 issued 6-6-06 to New York Life.
BLD-Final6/6/20066/6/20066/6/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/6/2006 at 7:11:20 AM. Contact: ###-####. ok for perm occ
Permanent Occupancy 6/6/20066/6/2006 DONE
Details
BLD-Final5/25/20065/26/20065/26/2006PPART
DetailsDave Hannah
mike - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for temp occ need to finish checking doors and glassing after its installed
FIRE-Final Inspection5/25/20065/26/20065/26/2006APASS
DetailsForrest France
Items on correction notice have been completed, fire life safety inspection passed. Note: door hardware at some locations is not installed-verified hardware on site and per door schedule is okay, final approval at structural inspection.
BLD-Final5/24/20065/24/20065/24/2006PCANC
DetailsDave Hannah
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
FIRE-Final Inspection5/24/20065/24/20065/24/2006AFAIL
DetailsForrest France
Three locations are missing emergency lights for the path of egress, need to provide and install fire extinguishers as discussed, provide suite address, doors are not installed at this time for verification of hardware requirements.
BLD-Other5/17/20065/17/20065/17/2006PPART
DetailsDave Hannah
MIKE NOTE: GRID; Phone #: ###-#### nOTE; 3RD FLOOR Internet Inspection Request from: Cathy Chiles ceiling grid ok to cover
BLD-Framing/Rough-in4/4/20064/4/20064/4/2006PPASS
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to cover int walls
BLD-Framing/Rough-in3/30/20063/31/20063/31/2006APART
DetailsDave Hannah
Mike; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to rock one side of walls
Print Occupancy Form  3/23/2006  
Permit Ready to Issue  3/23/2006 DONE
Telephone call  3/23/2006 DONE
called ###-#### and told Matt that permit is ready, fees, and need GC & RCE
Issue PAID IN FULL permit  3/23/2006 DONE
Plan assigned to (JCB)2/27/2006 3/22/2006 PASS
3/22/2006 16:16:25 JCB - activity updated through activity BLDA022 from case BLD06-00401.
PLANS/APPL TAKEN TO FRONT DESK  3/22/2006 PASS
Routing - PLAN CHECK3/18/2006 3/22/2006 PASS
Permit and plans approved and taken to front desk.
Plan resubmittals received  3/20/2006  
Received 1 copy of cover transmittal, 2 copies of A2.0, A4.0, A3.0, A5.0 and taken to Jason B.
Routing - PLAN CHECK3/16/2006 3/18/2006 FAIL
Sent an e-mail to architect for two items needing to be addressed.
Plan resubmittals received  3/17/2006  
Received 1 copy of cover transmittal letter, 1 copy of Plan Review Response, Revised Cert of Value, 2 copies of A.0., A2.0, A3.0, A4.0, A5.0, A6.0. Scanned and entered Revised Cert of Value then taken to Jason B.
1st review completed  3/16/2006 FAIL
Failed Plan Check.
Routing - FIRE3/15/2006 3/16/2006 PASS
Faxed review comments to architect. Attached review comments to plans.
Routing - PLAN CHECK2/28/2006 3/15/2006 FAIL
Plan review e-mailed and faxed to architect. Plan resubmittals and written response required for further review. Plans will now be routed to the Fire Department for review.
Plan resubmittals requested  3/15/2006 DONE
Plan resubmittals and written response required for further review.
Telephone call  3/8/2006 DONE
Talked with architect concerning some issues. He said he would look into and get back to me.
Routing - PUBLIC WORKS2/27/2006 2/28/2006 PASS
Pending Assignment by MYS2/17/2006 2/27/2006 DONE
2/27/2006 15:37:54 MYS - activity updated through activity BLDA184 from case BLD06-00401.
Plans ACCEPTED BY PLAN TECH  2/21/2006  
Application received  2/17/2006  
Recd Pcfee & Taken To Pln CK  2/17/2006 DONE
Fee Review-notes2/17/20062/17/2006