Code Occupancy Approval | | | 10/27/2009 | | DONE |
|
|
|
|
BLD-Final | 1/24/2008 | 1/24/2008 | 10/1/2008 | A | DONE |
Cathy Brown
|
|
|
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/4/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
(F) Reprint permit | | | 8/14/2008 | | |
|
|
|
|
First Notice | | 4/14/2008 | 8/11/2008 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 4/14/2008 | | DONE |
|
|
|
All landscaping, buffering, curb and lot requirements met under BLD06-00456.
|
Permanent Occupancy | | | 4/14/2008 | | DONE |
|
|
|
|
FIRE-Final Inspection | 2/14/2008 | 2/15/2008 | 2/15/2008 | A | PASS |
Forrest France
|
|
|
Items on correction notice verified for completion, fire life safety finaled.
|
Temporary Occupancy UNPAID FEE | | | 2/13/2008 | | DONE |
|
|
|
|
BLD-Final | 2/12/2008 | 2/12/2008 | 2/12/2008 | P | PASS |
Tom Arcoraci
|
|
|
ok pending fire ok
|
FIRE-Final Inspection | 2/11/2008 | 2/12/2008 | 2/12/2008 | A | PART |
Forrest France
|
|
|
Fire life safety final pending fire department access lane curb marking per fire code review notes and provision of missing max. occupant load signs at three areas (pool room, patio area, exercise room) -see review notes for details. Remainder of fire life safety is satisfactory.
|
BLD-Conference | 2/4/2008 | 2/4/2008 | 2/4/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 1/30/2008 | 1/31/2008 | 1/31/2008 | A | CANC |
Tom Arcoraci
|
|
|
|
Code Occupancy Approval | 1/28/2008 | 1/28/2008 | 1/29/2008 | P | PASS |
Joe R Venneman
|
|
|
|
Code Occupancy Approval Temp | 1/28/2008 | 1/28/2008 | 1/28/2008 | P | PASS |
Joe R Venneman
|
|
|
Contractor posted bond for unfinished landscaping - bid was for $26,031 + 10%.
|
BLD-Conference | 1/25/2008 | 1/28/2008 | 1/28/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
Code Occupancy Approval Temp | | | 1/28/2008 | | DONE |
|
|
|
|
BLD-Wall cover | 1/25/2008 | 1/25/2008 | 1/25/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 1/24/2008 | 1/25/2008 | 1/25/2008 | A | NR |
Forrest France
|
|
|
Need project related fire alarm and sprinkler permit final inspections and approvals prior to building life safety final.
|
PubWorks Occupancy Approval | 1/25/2008 | 1/25/2008 | 1/25/2008 | | DONE |
|
|
|
Recieved engineer required letter 01/24/08, final inspection by Brian Murphy.
|
Override - People Holds | | | 1/24/2008 | | |
|
|
|
|
BLD-Conference | 1/15/2008 | 1/15/2008 | 1/16/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 1/14/2008 | 1/15/2008 | 1/15/2008 | A | CANC |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 1/11/2008 | 1/11/2008 | 1/11/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 1/4/2008 | 1/4/2008 | 1/4/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 12/31/2007 | 12/31/2007 | 12/31/2007 | P | PASS |
Tom Arcoraci
|
|
|
jack
|
BLD-Other | 12/28/2007 | 12/28/2007 | 12/28/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 12/27/2007 | 12/28/2007 | 12/28/2007 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 12/24/2007 | 12/24/2007 | 12/24/2007 | P | CANC |
Tom Arcoraci
|
|
|
|
PubWorks Occupancy Approval | 12/27/2007 | 12/27/2007 | 12/17/2007 | | FAIL |
Joe R Venneman
|
|
|
Megan Kushner. Public Works, reported:
The new Marriott hotel (suites) at 1455 S Capitol (location of the old Red Lobster) has built their enclosure all wrong. It is not wide enough for us to put a container inside the enclosure (front-load 6 yd) or service from the enclosure as currently constructed. The enclosure corner posts must be moved to sit at exactly the edge of the curb and the bollards out front must be cut off and not replaced to ensure that the gates (when hung) open a minimum of 120 degrees. (Double check to make sure gates swing past curbing.)
Allied Waste (Bob) talked with Zach, the onsite contractor; he seemed reluctant to make any modifications but was told exactly how to fix the situation.
Please do not issue occupancy or final occupancy until the enclosure meets PW criteria. Let me know how I can assist.
Thanks for your assistance with this situation,
Megan
|
BLD-Conference | 12/12/2007 | 12/12/2007 | 12/12/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 12/11/2007 | 12/11/2007 | 12/11/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 12/10/2007 | 12/11/2007 | 12/11/2007 | A | CANC |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 11/27/2007 | 11/27/2007 | 11/27/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 11/9/2007 | 11/9/2007 | 11/9/2007 | P | PASS |
Tom Arcoraci
|
|
|
jack
|
BLD-Wall cover | 11/7/2007 | 11/7/2007 | 11/8/2007 | P | PASS |
Tom Arcoraci
|
|
|
jack
|
BLD-Wall cover | 11/2/2007 | 11/2/2007 | 11/2/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 10/26/2007 | 10/26/2007 | 10/26/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 10/23/2007 | 10/23/2007 | 10/23/2007 | P | PASS |
Tom Arcoraci
|
|
|
see jack
|
BLD-Wall cover | 10/19/2007 | 10/19/2007 | 10/19/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 10/16/2007 | 10/16/2007 | 10/16/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 10/4/2007 | 10/4/2007 | 10/4/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 10/2/2007 | 10/3/2007 | 10/3/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 10/2/2007 | 10/2/2007 | 10/2/2007 | P | PASS |
Tom Arcoraci
|
|
|
ip ok
|
BLD-Wall cover | 9/25/2007 | 9/25/2007 | 9/25/2007 | P | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 9/20/2007 | 9/21/2007 | 9/21/2007 | P | PASS |
Tom Arcoraci
|
|
|
1 st floor
|
BLD-Wall cover | 9/19/2007 | 9/19/2007 | 9/19/2007 | P | PASS |
Tom Arcoraci
|
|
|
1st floor
|
BLD-Wall cover | 9/17/2007 | 9/17/2007 | 9/17/2007 | P | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 9/14/2007 | 9/14/2007 | 9/14/2007 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 9/4/2007 | 9/4/2007 | 9/4/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 8/30/2007 | 8/30/2007 | 8/31/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 8/28/2007 | 8/28/2007 | 8/28/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 8/24/2007 | 8/24/2007 | 8/24/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 8/23/2007 | 8/23/2007 | 8/23/2007 | P | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 8/16/2007 | 8/16/2007 | 8/16/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 8/3/2007 | 8/6/2007 | 8/6/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 8/3/2007 | 8/3/2007 | 8/3/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/24/2007 | 7/24/2007 | 7/24/2007 | P | PASS |
Tom Arcoraci
|
|
|
wip ok shafts
|
BLD-Wall cover | 7/17/2007 | 7/17/2007 | 7/17/2007 | P | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Other | 7/13/2007 | 7/13/2007 | 7/13/2007 | P | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 7/12/2007 | 7/12/2007 | 7/12/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 7/6/2007 | 7/6/2007 | 7/6/2007 | P | PASS |
Tom Arcoraci
|
|
|
3 floor ok for cover
|
BLD-Wall cover | 7/3/2007 | 7/3/2007 | 7/3/2007 | P | PASS |
Tom Arcoraci
|
|
|
4 fl ok
|
BLD-Other | 6/27/2007 | 6/27/2007 | 6/27/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 6/20/2007 | 6/20/2007 | 6/20/2007 | P | PASS |
Tom Arcoraci
|
|
|
ok to cover 4 floor
|
BLD-Conference | 6/7/2007 | 6/7/2007 | 6/7/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 6/7/2007 | 6/7/2007 | 6/7/2007 | A | CANC |
Tom Arcoraci
|
|
|
|
BLD-Other | 6/1/2007 | 6/1/2007 | 6/1/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 5/24/2007 | 5/25/2007 | 5/25/2007 | P | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Other | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | PASS |
Tom Arcoraci
|
|
|
wip
|
BLD-Wall cover | 5/15/2007 | 5/15/2007 | 5/16/2007 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Conference | 5/11/2007 | 5/11/2007 | 5/11/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 5/4/2007 | 5/4/2007 | 5/4/2007 | P | PASS |
Tom Arcoraci
|
|
|
jack wip ok
|
BLD-Other | 5/1/2007 | 5/2/2007 | 5/2/2007 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 4/25/2007 | 4/26/2007 | 4/26/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 4/19/2007 | 4/24/2007 | 4/24/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 4/16/2007 | 4/17/2007 | 4/18/2007 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Other | 4/4/2007 | 4/10/2007 | 4/10/2007 | P | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 4/3/2007 | 4/4/2007 | 4/4/2007 | P | PASS |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Wall cover | 4/3/2007 | 4/3/2007 | 4/3/2007 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 3/30/2007 | 3/30/2007 | 3/30/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 3/20/2007 | 3/20/2007 | 3/20/2007 | P | PASS |
Tom Arcoraci
|
|
|
see jack wip ok
|
BLD-Wall cover | 3/13/2007 | 3/14/2007 | 3/14/2007 | A | PASS |
Tom Arcoraci
|
|
|
stair and shaft discused
|
BLD-Framing/Rough-in | 3/12/2007 | 3/13/2007 | 3/13/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/12/2007 at 2:53:21 PM. Contact: ###-####. wip shear ok footing for piers ok
|
BLD-Wall cover | 3/12/2007 | 3/12/2007 | 3/13/2007 | P | PASS |
Tom Arcoraci
|
|
|
wip shear ok
|
BLD-Conference | 3/2/2007 | 3/2/2007 | 3/5/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 3/1/2007 | 3/1/2007 | 3/2/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 2/1/2007 | 2/1/2007 | 2/1/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 1/9/2007 | 1/10/2007 | 1/10/2007 | A | PASS |
Tom Arcoraci
|
|
|
jack; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Other | 1/9/2007 | 1/9/2007 | 1/9/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 1/3/2007 | 1/3/2007 | 1/3/2007 | P | PASS |
Tom Arcoraci
|
|
|
jack; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 12/21/2006 | 12/21/2006 | 12/21/2006 | P | CANC |
Tom Arcoraci
|
|
|
jack
|
BLD-Conference | 12/7/2006 | 12/8/2006 | 12/8/2006 | P | PASS |
Tom Arcoraci
|
|
|
see jack
|
BLD-Other | 11/27/2006 | 11/27/2006 | 11/27/2006 | P | PASS |
Tom Arcoraci
|
|
|
see jack
|
BLD-Other | 11/17/2006 | 11/17/2006 | 11/17/2006 | P | PASS |
Tom Arcoraci
|
|
|
see jack
|
BLD-Conference | 11/9/2006 | 11/9/2006 | 11/9/2006 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Concrete | 11/7/2006 | 11/7/2006 | 11/7/2006 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 10/13/2006 | 10/16/2006 | 10/16/2006 | P | PASS |
Tom Arcoraci
|
|
|
jack; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles strata on site for spec insp
|
BLD-Other | 10/6/2006 | 10/6/2006 | 10/6/2006 | P | PASS |
Tom Arcoraci
|
|
|
conf on hotel plans
|
Plan resubmittals received | | | 9/26/2006 | | |
|
|
|
Received 2 copies of S-1.1, S-1.2, S-1.3, S-2.0, S-2.1, S-3.0. (This permit is already in the ISS status) and taken to Tom Arcoraci's in box
|
(F) Reprint permit | | | 9/11/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 9/7/2006 | | |
|
|
|
tlk to bill ray strite ###-#### that permit and fees are ready to be picked up and talked to him about the ACHD fees
|
Permit Ready to Issue | | | 9/7/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/18/2006 | | 9/6/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/6/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 2/27/2006 | | 9/6/2006 | | PASS |
|
|
|
9/6/2006 13:47:05 M_P - activity updated through activity BLDA022 from case BLD06-00456.
|
Plan resubmittals received | | | 8/23/2006 | | DONE |
|
|
|
received one cover transmittal, one copy of plan review comments, one copy response letter from brs, one copy eci response letter, two copy revised structural calcs, one fax from browning & assoc., two sets of the following sheets: t-1.0, ls-1.1, a-1.1, a-1.2, a-1.3, a-1.4, a-1.5, a-1.6, a-1.8, a-1.9,a-1.11,a-1.12, a-1.13, a-3.1,a-4.2, a-5.3, a-6.5, a-6.7, s-1.0, s-1.1, s-1.2, s-1.3, s-1.4, s-1.5, s-3.1, m-1.1, m-1.2, m-1.3, m-1.4, m-1.5, m-2.0 and taken to mike phillips
|
Routing - PLAN CHECK | 6/12/2006 | | 7/18/2006 | | FAIL |
|
|
|
Second review failed, sent correction report to architect requesting additional information to be submitted for further review prior to issuing permit.
|
Routing Off Site - STRUCTURAL | 6/12/2006 | | 6/19/2006 | | PEND |
|
|
|
Comments listed are for reference only. Add copy to plan review's final comments. No further review required by outside engineering firm.
|
Routing - PLAN CHECK | 4/17/2006 | | 6/12/2006 | | FAIL |
|
|
|
Architect inserted plans, but he did not have the requested structural calculations and details. Waiting for these items to be submitted prior to my review.
|
Plan resubmittals received | | | 6/7/2006 | | |
|
|
|
Recieved transmittal letter, 16pg. response from BRS Architects, 7pg. response from ECI Engineers, 3 sets of structural calculations from DCI Engineers, 3 copies of the following:S-3.1, S-4.0, S-0.1, S-1.0, S-1.1, S-1.2, S-1.3, S-1.4, S-2.0, S-2.1; recieved 2 copies of the following: LS-1.1, A-1.1, A-1.5, A-1.6, A-1.8, A-1.9, A-1.10, A-1.11, A-1.12, A-1.13, A-2.1, A-2.2, A-3.1, A-3.2, A-3.3, A-4.1, A-4.2, A-4.4, A-5.1, A-5.2, A-5.3, M-1.1, M-1.2, M-1.3, M-1.4, M-1.5, M-2.0, M-3.0, P-1.1, P-2.1, P-2.2, P-3.1, E1.0, E1.1, E1.2, E1.3, E1.4, E1.5, E2.0, E2.1, E3.0, E3.1, E4.0, E4.1, E4.2, E5.1, E5.2, E5.3, E5.4, EC3.0, SE1.0, SE2.0; taken to Mike Phillips.
|
Routing - PUBLIC WORKS | 4/11/2006 | | 4/17/2006 | | FAIL |
|
|
|
CONTACT BRIAN MURPHY ###-####
|
Routing - PUBLIC WORKS | 4/17/2006 | | 4/17/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/10/2006 | | 4/11/2006 | | |
|
|
|
Routing to P.W.
|
Routing - Erosion and Sediment | 4/7/2006 | | 4/10/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 4/6/2006 | | 4/7/2006 | | |
|
|
|
Routing to ESC.
|
1st review completed | | | 4/6/2006 | | FAIL |
|
|
|
Failed Plan Check, Structural.
|
Routing - FIRE | 4/3/2006 | | 4/6/2006 | | PASS |
|
|
|
Attached review comment to plans. Faxed review comments to architect.
|
Routing - PLAN CHECK | 3/20/2006 | | 4/3/2006 | | FAIL |
|
|
|
Plan review completed, sent correction report to architect and applicant requesting additional informaiton be submitted for further review prior to issuing permit.
|
Plan resubmittals received | | | 3/22/2006 | | DONE |
|
|
|
Received 1 transmittal, 2 erosion / sediment control review check list,2 esc applications,2 esc narritives, & 2 copys of sheet C-6.0 taken to Mike P.
|
Routing - PLANNING | 3/9/2006 | | 3/20/2006 | | PASS |
|
|
|
Approved per DRH05-00277-Marty S. (3/10/06)
Pending review per CUP05-00065 & CVA05-00020-Carl M.
|
Routing - PLANNING | 3/14/2006 | | 3/14/2006 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 2/27/2006 | | 3/14/2006 | | FAIL |
|
|
|
Outside review failed, faxed comments to architect. Additional review required by outside engineering firm.
Called Action Courier @9:00 on 2/27/06 BAS
|
Routing - PLUMBING | 3/7/2006 | | 3/9/2006 | | PASS |
|
|
|
suds relief required on stacks with tubs, sinks or washing mechines. max 120 deg hot water to public lavs, and 120 deg, max on shower or tub/shower combo discharge. base of stack and end of line cleanouts required, 6" waste to the north required.
|
Plan resubmittals received | | | 3/8/2006 | | |
|
|
|
Received 1 copy of cover/transmittal letter, 2 copies of ESC plan review checklist & ESC application, 2 copies of ESC control plan & SWPPP plan, and 2 copies of C-6.0 then taken to MIke P.
|
Routing - Erosion and Sediment | 3/6/2006 | | 3/7/2006 | | FAIL |
|
|
|
No esc plan narrative included with the plan submittal. Informed applicant.
|
Routing - PUBLIC WORKS | 2/28/2006 | | 3/6/2006 | | FAIL |
|
|
|
Requires drainage plan revisions: Contact Brian Murphy ###-####
|
Routing - PLANNING Land Div | 2/27/2006 | | 2/28/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/27/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 2/27/2006 | | |
|
|
|
|
(F) Reprint permit | | | 2/27/2006 | | DONE |
|
|
|
|
Application received | | | 2/24/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 2/24/2006 | | |
|
|
|
|
Fee Review-notes | 2/24/2006 | 2/24/2006 | | | |
|
|
|
|