Print Occupancy Form | | | 3/19/2012 | | |
|
|
|
|
Third Notice BLD | 3/5/2008 | 3/5/2008 | 9/29/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Third Notice BLD | 3/5/2008 | 3/5/2008 | 9/29/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 1/9/2008 | 1/9/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
Second Notice BLD | 1/9/2008 | 1/9/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/4/2007 | 1/9/2008 | | DONE |
|
|
|
|
First Notice | | 12/4/2007 | 1/9/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/4/2007 | | DONE |
|
|
|
|
BLD-Final | 12/3/2007 | 12/3/2007 | 12/3/2007 | P | PART |
Dave Hannah
|
|
|
dirk Phone #: ###-#### ok for perm occ
|
BLD-Final | 11/26/2007 | 11/27/2007 | 11/28/2007 | P | FAIL |
Dave Hannah
|
|
|
dirk Phone #: ###-#### ada sink to high and waterclosit to far from wall
|
FIRE-Final Inspection | 11/26/2007 | 11/27/2007 | 11/27/2007 | A | PASS |
Forrest France
|
|
|
Dead bolt removed from door.Fire life safety passed.Per KR
|
BLD-Final | 11/21/2007 | 11/23/2007 | 11/26/2007 | A | CANC |
Troy Cobbley
|
|
|
Per a phone conversation with Dirk the indicator has not been installed on the front door. No inspection performed.
|
FIRE-Final Inspection | 11/21/2007 | 11/23/2007 | 11/23/2007 | A | CANC |
Troy Cobbley
|
|
|
Canceled per dirk Phone #: ###-####
|
BLD-Final | 11/14/2007 | 11/15/2007 | 11/14/2007 | A | CANC |
Dave Hannah
|
|
|
dirk - please call for access Phone #: ###-#### Inspection cancelled from web by: Patricia Smith
|
FIRE-Final Inspection | 11/14/2007 | 11/14/2007 | 11/14/2007 | P | FAIL |
Forrest France
|
|
|
Need to tag the provided PFE, manual surface bolts are not permitted, provide signage at the door to the FACP/Riser room.
|
BLD-Energy code compliance | 9/5/2007 | 9/5/2007 | 9/5/2007 | P | PASS |
Dave Hannah
|
|
|
Dirk; Phone #: ###-#### Internet Inspection Request from: Hattie James; call half hour prior
|
BLD-Framing/Rough-in | 7/19/2007 | 7/20/2007 | 7/20/2007 | A | PASS |
Dave Hannah
|
|
|
dirk Phone #: ###-#### ok to insulate but still needs fire sprinkler sign off
|
BLD-Aging Inspection | 6/11/2007 | 6/11/2007 | 6/11/2007 | | PASS |
Dave Hannah
|
|
|
exp 8/29/07
|
Issue & PRINT to be Invoiced | | | 3/2/2007 | | DONE |
|
|
|
|
Telephone call | | | 2/23/2007 | | DONE |
|
|
|
t/c w dirk dunham at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 2/23/2007 | | |
|
|
|
|
Routing - PLAN CHECK | 2/21/2007 | | 2/22/2007 | | PASS |
|
|
|
Plans approved by fire with sprinkler system added as part of this permit. Routing to permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/22/2007 | | PASS |
|
|
|
|
Print Occupancy Form | | | 2/22/2007 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 3/1/2006 | | 2/22/2007 | | PASS |
|
|
|
2/22/2007 06:49:10 DRS - activity updated through activity BLDA022 from case BLD06-00470.
|
Routing - FIRE | 2/14/2007 | | 2/21/2007 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLAN CHECK | 4/19/2006 | | 2/14/2007 | | PEND |
|
|
|
Building to be fully sprinklered. Plans resubmitted. routing to fire code analys for review.
|
Plan Reviewer's activity | | | 2/7/2007 | | DONE |
|
|
|
Received e-mail from architect, Lynn Brown, stating a sprinkler contractor has been hired to design sprinkler system for building and he will be resubmitting plans shortly.
|
Plan Reviewer's activity | | | 12/7/2006 | | DONE |
|
|
|
E-mail to Lynn Brown concerning the status of this project. Is it still being considered or is it to be voided.
|
Telephone call | | | 5/10/2006 | | DONE |
|
|
|
RE: BLD06-00470 Spoke with Lynn Brown. Spent about 45 minutes going over every conceivable possibility of access from all sides and nothing works. So he finally sees the need to look into the sprinkler option. He says the front building is sprinklered with a main coming to the back corner, and the control valve is on the side of the house, so it may be possible to tap into that main (upstream of the sprinkler control valve for the house) and put a second riser on it, to supply sprinklers in the rear building. That would put two buildings on one UG main but that isn't against Code; they each have separate control valves and these are very small anyway. I told him to check into that option with United Water and a sprinkler contractor. So hopefully that will be the answer.
|
Meeting | | | 4/24/2006 | | DONE |
|
|
|
Met with Dave Hanneman regarding non compliant fire department access to the proposed building. Dave Hannemans position is that the proposed building must be fully fire sprinklered .
|
Telephone call | | | 4/20/2006 | | DONE |
|
|
|
Spoke with architect regarding alternative Fire Department access. Informed architect that approval will have to come from the Fire Marshall. Left message with Dave Hanneman regarding meeting to discuss the issue. Waiting for response from Dave Hanneman.
|
Plan Reviewer's activity | | | 4/20/2006 | | DONE |
|
|
|
Scott Arellano picked up plans for Ludwig Law Office conversion from garage, to take to Dave Hanneman, Fire Marshall, to review the fire department access requirements.
|
Routing - FIRE | 4/17/2006 | | 4/19/2006 | | FAIL |
|
|
|
Faxed resubmittal requirements to architect. Attached review comments to plans.
|
Routing - PLAN CHECK | 3/30/2006 | | 4/17/2006 | | PEND |
|
|
|
Inserted resubmittals of 4/14/06 into original plan submittals. No additional submittals required. Re-routing to fire code analyst for re-review.
|
Plan resubmittals received | | | 4/14/2006 | | DONE |
|
|
|
received 2 response letters one to dan stuart & one to scott a.& 4 copies of all a-1, sp-1, a-2, a-3, a-4, & e-2 taken to dan stuart
|
Routing - FIRE | 3/28/2006 | | 3/30/2006 | | FAIL |
|
|
|
Attached review comments to office copy set of prints. Faxed resubmittal items to architect.
|
1st review completed | | | 3/30/2006 | | FAIL |
|
|
|
Failed Fire.
|
Plan Reviewer's activity | | | 3/29/2006 | | DONE |
|
|
|
Had forgot to include requirement per chapter 29, IBC, for service sink and drinking fountain or water cooler for this new occupancy, E-mailed and faxed follow up notice of requirements to Lynn Brown to include with plan resubmittals.
|
Plan resubmittals requested | | | 3/28/2006 | | DONE |
|
|
|
Faxed & e-mailed copy of plan review items needing to be addressed by architect.
|
Routing - PLAN CHECK | 3/6/2006 | | 3/28/2006 | | FAIL |
|
|
|
Copy of review comments e-mailed and faxed to Lynn Brown. Routing to fire code analyst for review.
|
Routing - PLANNING | 3/2/2006 | | 3/6/2006 | | PASS |
|
|
|
Sarah Schafer DRH05-00184 - Approved per DR.
|
Routing - PUBLIC WORKS | 3/1/2006 | | 3/2/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 2/28/2006 | | |
|
|
|
|
Application received | | | 2/28/2006 | | |
|
|
|
|
Pending Assignment by MYS | 2/28/2006 | | 2/28/2006 | | DONE |
|
|
|
2/28/2006 13:16:34 B_S - activity updated through activity BLDA165 from case BLD06-00470.
|
Recd Pcfee & Taken To Pln CK | | | 2/28/2006 | | |
|
|
|
|
Fee Review-notes | 2/28/2006 | 2/28/2006 | | | |
|
|
|
|