Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 10/16/2006 | 10/16/2006 | 12/27/2006 | | DONE |
Jim Storey
|
|
|
|
BLD-Final | 10/11/2006 | 10/16/2006 | 10/16/2006 | A | PASS |
Jim Storey
|
|
|
Final raise the ceiling permit. Meet Greg at cube in bld. 25. cell ###-####.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
|
DOC - Permit Finaled | 10/16/2006 | 10/16/2006 | 10/16/2006 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 9/22/2006 | 9/29/2006 | 9/29/2006 | A | PART |
Jim Storey
|
|
|
Final inspection for open the new Fab to production. RTC C8790. Meet at Greg's cube or behind bld. 24C.; Phone #: ###-#### Internet Inspection Request from: Greg sub fab fire stopping corect in aplacation of collor assemblies wip
|
FIRE-Final Inspection | 9/22/2006 | 9/28/2006 | 9/28/2006 | A | PASS |
Forrest France
|
|
|
Fire life safety passed field inspection.
|
BLD-Conference | 9/20/2006 | 9/26/2006 | 9/28/2006 | A | PART |
Jim Storey
|
|
|
final inspection for fire system and door holder closure, acoustical ceiling areas will be ready for inspection.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes all ok pending firestopping lower level.
|
BLD-Conference | 9/26/2006 | 9/27/2006 | 9/28/2006 | A | PASS |
Jim Storey
|
|
|
COMPLETE THE FIRE ALARM TEST AND DOOR CLOSURE BETWEEN BLD. 24D & C. CALL GREG FOR DETAILS OF FIRE INSPECTORS ARRIVAL FOR THE AM OF THE 27TH.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes smoke test for fire door assemblies in 3 hr wall septration ok/ opening protection per listing.
|
BLD-Conference | 9/21/2006 | 9/22/2006 | 9/22/2006 | P | CANC |
Jim Storey
|
|
|
Door closure and hardware assembly inspection between building 24C & D. ; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes Inspection cancelled from web by: Greg Kirkes
|
BLD-Conference | 9/20/2006 | 9/20/2006 | 9/21/2006 | A | CANC |
Jim Storey
|
|
|
inspect door closure between Fab4A and Fab4B. ; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
|
BLD-Conference | 9/6/2006 | 9/11/2006 | 9/11/2006 | A | PASS |
Jim Storey
|
|
|
24C Subfab 3 hour fire wall approval to begin construction; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes reviewed fire stopping assembly and approved aplacation per listing for size of opening and penatrating idems.
|
BLD-Conference | 8/24/2006 | 8/28/2006 | 8/28/2006 | A | PASS |
Jim Storey
|
|
|
inspect 1 hour exit hallway at Fab level and discuss 3 hour fire wall at subfab level.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
|
BLD-Conference | 8/21/2006 | 8/22/2006 | 8/22/2006 | A | NR |
Jim Storey
|
|
|
Inspect 1 hour wall for ceiling install in the lower Fab level east rooms.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes need fire stopping.
|
BLD-Framing/Rough-in | 8/16/2006 | 8/16/2006 | 8/16/2006 | P | PASS |
Jim Storey
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles3hr door instaltion ok
|
BLD-Conference | 7/31/2006 | 8/1/2006 | 8/1/2006 | A | PASS |
Jim Storey
|
|
|
Inspect fire door frame installation between B24C & D.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes need to check spacing of door anchors per listing.
|
BLD-Conference | 6/19/2006 | 6/21/2006 | 6/21/2006 | A | PART |
Jim Storey
|
|
|
Look at fire rated door requirements and installation planning between B24C & D at the Fab level. Look at various notable items as the project progresses.; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes pending listing
|
Plan Reviewer's activity | | | 6/15/2006 | | PASS |
|
|
|
Reviewed and approved engineered four-hour penetration fire stops at the subfab fire wall. JCM
|
BLD-Conference | 6/9/2006 | 6/12/2006 | 6/12/2006 | A | PART |
Jim Storey
|
|
|
Door details for installation between building 24D and 24C at the Fab level for Mike Reyes; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
|
BLD-Footing | 6/6/2006 | 6/9/2006 | 6/9/2006 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/6/2006 at 12:28:14 PM. Contact: ###-####.
|
BLD-Footing | 6/6/2006 | 6/8/2006 | 6/8/2006 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/6/2006 at 12:27:46 PM. Contact: ###-####.wip
|
BLD-Footing | 6/6/2006 | 6/7/2006 | 6/7/2006 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/6/2006 at 12:27:18 PM. Contact: ###-####.
|
BLD-Footing | 5/31/2006 | 6/5/2006 | 6/5/2006 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/31/2006 at 3:33:09 PM. Contact: ###-####.wip si
|
BLD-Footing | 5/31/2006 | 6/2/2006 | 6/5/2006 | P | DEFR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 5/31/2006 at 3:32:23 PM. Contact: ###-####. out of time.
|
BLD-Other | 5/26/2006 | 5/30/2006 | 5/30/2006 | A | PASS |
Jim Storey
|
|
|
Inspect steel, welding, and ceiling support structure. Look at other general conditions related to structure and concrete. ; Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
|
Plan Reviewer's activity | | | 5/24/2006 | | PASS |
|
|
|
Plans approved. Need to review penetration assemblies at the four-hour fire wall on the next trip to Micron. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2006 | | DONE |
|
|
|
|
Issue & PRINT to be Invoiced | | | 5/24/2006 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 3/10/2006 | | 5/24/2006 | | PASS |
|
|
|
5/24/2006 07:43:24 JCM - activity updated through activity BLDA022 from case BLD06-00475.
|
Plan resubmittals received | | | 5/23/2006 | | DONE |
|
|
|
Received an e-mail identifying additional information requested on exit signs and penetration fire assemblies. JCM
|
Routing - FIRE | 4/3/2006 | | 4/7/2006 | | PASS |
|
|
|
Approved submet to following comments attached to plans:
1. Sheet A2.01 note 12 refers to a "future" gas cabinet. No information is provided about this cabinet or the gases. Gas cabinets shall meet all applicable requirements of IFC section 18 and other applicable code sections, including 1803.3.3.5, 2703.8.6 and 1803.13.2. A separate permit application will be required with plans showing compliance with applicable code requirements.
2. Portable Fire Extinguishers - none are shown on the Main level sheet A2.1.1. One 4-A:10-B:C extinguisher is required within 75' travel distance of all points of this floor. Locations shown on sheet A2.0.1, A2.2.1 and A2.2.2 appear to be acceptable. Final approval is subject to satisfactory field inspection.
3. Sheet PP0.1 lists chemicals in the Piping Abbreviations. No other Hazardous material information was submitted. It is understood there will be no new haz mat's to be used in the process and any increases in existing amounts will be monitored by Micron's Chemical Engineering staff to ensure maximum allowable quantities are not exceeded. Piping systems and equipment are to be in accordance with IFC 1803.2, 2703.2 and other applicable code sections.
Sprinkler and Fire Alarm plans not ready for review at this time.
|
Plan resubmittals requested | | | 4/3/2006 | | DONE |
|
|
|
E-mailed the architect with a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 3/29/2006 | | 4/3/2006 | | |
|
|
|
|
Routing - FIRE | 3/10/2006 | | 3/16/2006 | | PEND |
|
|
|
Complex review; approval pending further review at next visit. AS and FA plans not ready for review. 3/23/06 - Buidling review not finished and no time for fire review at this visit; will review at next visit. AS and FA plans still not ready for review.
|
1st review completed | | | 3/13/2006 | | PEND |
|
|
|
project scope too large to complete on the first visit. JCM
|
Plan Reviewer's activity | | | 3/10/2006 | | PEND |
|
|
|
Because of the nature and size of the scope of work for this project, I was unable to complete the review on this visit. I will need additional time to review this project on my next Micron visit. JCM
|
Application received | | | 2/28/2006 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|
Third Notice BLD | 1/8/2007 | 1/8/2007 | | | |
|
|
|
Second Notice has not been responded to.
|
Plan assigned from Web | 2/28/2006 | 3/10/2006 | | | |
|
|
|
|