Permit NumberBLD06-00486
StatusFinaled
Name GORRINGE BROTHERS
Site Address 609 W BRUMBACK ST
Project NameUNITED WATER PUMP STATION
Customer Number 
ePlanReviewNo
Description
RCE 4681 Gorringe Bros Construction (UNITED WATER PUMP STATION) 5/10/07: PLANS MODIFIED FOR SITE RELOCATION & STRUCTURAL CHANGES. To construct a new 372 sq.ft. pump station in ACHD right-of-way. Prior to issuance of this permit property pins must be set on site to mark the boundaries of the lot established by the City Council Resolution and Record of Survey 7634 recorded on 11/3/06. (Note: Resolution 388-06 (R19284) approved by City Council on 10/3/06 giving Boise City direction to issue a building permit in right of way. ACHD Temporary License Agreement No. 0332-1651-0106 on file as modified on 5/14/07. Copy of resolution attached to documents of this permit.) mlo
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/22/200812/22/20081/15/2009 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD11/7/200811/7/200812/22/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice9/20/20089/20/200811/7/2008 DONE
DetailsDave Hannah
BLD-Final9/18/20089/19/20089/20/2008APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/18/2008 at 3:43:58 PM. Contact: ###-####.
DOC - Permit Finaled9/20/20089/20/20089/20/2008PPASS
DetailsDave Hannah
BLD-Framing/Rough-in9/19/20079/19/20079/19/2007PPART
DetailsTony Young
mike Phone #: ###-####
need special inspection report for masonary,, all else ok
BLD-Other8/10/20078/10/20078/10/2007PPART
DetailsTony Young
rick - concrete floor Phone #: ###-####
slab rebar
BLD-Foundation8/1/20078/2/20078/2/2007APART
DetailsTony Young
rick - wall Phone #: ###-####
wip.. ok
BLD-Wall cover7/30/20077/31/20077/31/2007PNR
DetailsTony Young
rick Phone #: ###-####
BLD-Footing7/30/20077/31/20077/31/2007APASS
DetailsTony Young
rick Phone #: ###-####
adding corner verts,, ok after
Print Occupancy Form  6/11/2007 DONE
Telephone call  6/11/2007  
called ###-#### and told Doug Shaefer that plan mod is ready and fee
Permit Ready to Issue  6/11/2007 DONE
CHANGE STATUS TO (ISS)  6/11/2007  
ALREADY ISSUED A PLAN MOD
(F) Reprint permit  6/11/2007 DONE
Plan assigned to (MYS)5/15/2007 6/8/2007 PASS
6/8/2007 10:50:19 MYS - activity updated through activity BLDA022 from case BLD06-00486.
Routing - PLAN CHECK6/4/2007 6/8/2007 PASS
PLAN MODIFICATION
PLANS/APPL TAKEN TO FRONT DESK  6/8/2007 DONE
Routing - FIRE5/31/2007 6/4/2007 PASS
PLAN MODIFICATION. Attached updated review comments to plans.
Routing - PLANNING5/29/2007 5/31/2007 PASS
PLAN MODIFICATION. Cody CAA05-00310
Routing - Erosion and Sediment5/17/2007 5/29/2007 PASS
PLAN MODIFICATION.
Routing - PLUMBING  5/29/2007 PASS
PLAN MODIFICATION. per plans and 2003 upc
Plan resubmittals received  5/18/2007  
received letter from Doug Schaefer, amendmened licence agreement from ACHD, and one copy of 11" x 17" drawings of site plan, site grading plan and details (3 pgs.); taken to Marlene
Routing - PUBLIC WORKS5/15/2007 5/17/2007 PASS
PLAN MODIFICATION.
Plan resubmittals received  5/10/2007  
Received a letter from Morton McMillen (2pgs), 3 copies of the following sheets-C-1, C-2, C-3, A-1, A-2, S-0, S-1, S-2, M-1, M-2, M-3, m-4, M-5, M-6, E-1, E-2, E-3, EC-1, EC-2 and taken to Marlene Southard
Plan Modification Accepted  5/10/2007 DONE
PLAN MODIFICATION. Received a letter from Morton McMillen (2pgs), 3 copies of the following sheets-C-1, C-2, C-3, A-1, A-2, S-0, S-1, S-2, M-1, M-2, M-3, m-4, M-5, M-6, E-1, E-2, E-3, EC-1, EC-2 and taken to Marlene Southard. NO FEES COLLECTED AT THIS TIME.
Plan resubmittals received  3/29/2007  
Received transmittal letter and two copes of pages M1, M2, M3, M4, M5, M6, E1, E2, E3, EC1, EC2, C1, C2, C3, A1, A2, S0, S1, S2; taken to Mike Otto along with original set of approved plans out of Records//log in as resubs and pull original plans per Marlene S.//3/29/07
BLD-Aging Inspection3/14/20073/14/20073/15/2007 PEND
DetailsTony Young
(F) Reprint permit  12/14/2006  
Issue PAID IN FULL permit  12/13/2006 DONE
Telephone call  12/7/2006  
left mess for mort mcmillan at ###-#### that permit is ready & need achd
Telephone call  12/7/2006 DONE
mort mcmillian left mess that they are going through achd for approval right now, then will pickup plans
Telephone call  11/17/2006 DONE
lft vm with m mcmillen ###-#### that permit and fees are ready to be picked up but needs GC/RCE #
Permit Ready to Issue  11/17/2006 DONE
Print Occupancy Form  11/16/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/15/2006 DONE
Plan assigned to (MLO)3/3/2006 11/15/2006 PASS
11/15/2006 10:26:29 MLO - activity updated through activity BLDA022 from case BLD06-00486.
Plan Reviewer's activity  11/9/2006 DONE
approval waiting for city attorney to review achd agreements per MYS.
Plan resubmittals received  11/7/2006  
Received 1 copy of cover transmittal, 1 copy of legal description from Porter's Land surveying with an attacted copy of record of survey (8x11) and a copy of record of survey (18x22) and taken to Mike Otto
Routing - PLANNING Land Div11/7/2006 11/7/2006 PASS
Record of Survey recorded on November 3, 2006. ROS 7634.
1st review completed  10/23/2006 PASS
Routing - FIRE10/19/2006 10/23/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK10/11/2006 10/19/2006 PASS
Routing - PUBLIC WORKS10/9/2006 10/10/2006 PASS
Routing back to PW. Requested by Louise. (mys)
Routing - PUBLIC WORKS GRADING10/10/2006 10/10/2006 PASS
Reduced hillside setback approved.
Routing - PLANNING Land Div10/10/2006 10/10/2006 PEND
Prior to issuance of building permit, a recorded Record of Survey is required showing the property lines of the Right-Of-Way.
Plan Reviewer's activity  10/9/2006 DONE
CITY COUNCIL RESOLUTION 388-06 passed on 10/3/06. Proceed with plan review. Do not issue building permit until property pin placement on job site has been verified per City Council resolution. (msouthard)
Routing - PLAN CHECK4/3/2006 4/13/2006 HOLD
This project is being held until further direction from management for property and building code requirements which will apply. The building is currently located in the public-right-of-way.MLO
Routing - PLANNING3/27/2006 4/3/2006 PASS
CAA05-00310
Routing - PLUMBING4/3/2006 4/3/2006 PASS
???? floor drainage to seepage bed ok'd by public works.
Routing - Erosion and Sediment3/27/2006 3/27/2006 PASS
No ESC plan or permit required. adh.

Governed by ACHD
Routing - PUBLIC WORKS3/23/2006 3/27/2006 FAIL
NEED REDUCED SLOPE SETBACK RECOMMENDATION FROM GEOTECH ENGR. CONTACT TERRY RECORDS ###-####
Routing - PLANNING Land Div3/3/2006 3/17/2006 FAIL
The site is public Right-of-Way owned by ACHD. The applicant has a "Temporary License Agreement" to construct a permanent 1,800 square foot pump station. The Agreement may be terminated with 30 days by either party. Gary Inselman said that ACHD will not issued a permanent easement agreement. If Boise City will not issue permit, United Water must vacate Right-of-Way or locate pump house outside of Right-of-Way. Called Morton McMillan, ###-#### on 3/17/06 and left message. PLANS ON HOLD IN DAVE'S OFFICE PENDING CALL BACK FROM SUBMITTING ENGINEER.
Plans ACCEPTED BY PLAN TECH  3/3/2006  
Plan routing begun/NEW & ADDTN  3/3/2006  
Application received  3/2/2006  
Recd Pcfee & Taken To Pln CK  3/2/2006  
Fee Review-notes3/2/20063/2/2006