Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00500
StatusFinaled
Name SCOTT SPARKS
Site Address 1402 W GROVE ST
Project NameLINEN BUILDING-SHELL
Customer Number 
ePlanReviewNo
Description
(LINEN BUILDING RENOVATION) This building will be fire sprinklered for story increase. To renovate an existing 2 story with basement building (2,632 square foot basement, 4,133 square foot 1st story, 670 square foot 1st story mezzanine, 4,133 square foot 2nd story) in anticipation of future restaurant, restaurant kitchen, office, and storage uses. Work is to include interior stairways; two 1-hr stairway shafts to serve the basement; 2 restrooms accessible to the disabled; an elevator to serve the 2nd story; a 1-hr elevator shaft; a 1-hr elevator machine room; interior nonbearing walls; exterior concrete steps, landings, and ramps; new roof insulation on top of the roof sheathing; new single ply roof membrane; new fixed awnings; and a seismic upgrade. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. DRH06-00039 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD10/30/200710/30/200712/19/2007 DONE
Second Notice has not been responded to.
Fee Review-notes3/3/20063/3/200612/19/2007 DONE
Second Notice BLD10/17/200710/17/200710/30/2007 DONE
First Notice has not been responded to.
First Notice9/21/20079/21/200710/17/2007 DONE
DetailsDave Hannah
BLD-Final9/19/20079/20/20079/21/2007PPASS
DetailsDave Hannah
scott Phone #: ###-####
DOC - Permit Finaled9/21/20079/21/20079/21/2007PPASS
DetailsDave Hannah
FIRE-Final Inspection9/19/20079/20/20079/20/2007PPASS
DetailsForrest France
All noted items for correction have been completed, fire life safety inspection passed.
FIRE-Final Inspection9/18/20079/19/20079/20/2007AFAIL
DetailsForrest France
See eight item correction notice for list of defficiencies, also need to final fire sprinkler permit prior to life safety final approval.
BLD-Final9/19/20079/19/20079/20/2007PFAIL
DetailsDave Hannah
Scott; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Final9/18/20079/19/20079/19/2007ACANC
DetailsDave Hannah
Scott; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
PubWorks Occupancy Approval9/10/20079/10/20079/10/2007 DONE
Case Summary (BLD)  9/7/2007  
Meeting  9/6/2007 DONE
Onsite meeting with Building and Fire department personnel to evaluate the current building protection status with respect to an occupancy event scheduled for noon today, discovered by the fire inspector at his initial check of the sprinkler hydro test this morning. No sprinkler contractor was on site, no sprinkler plans were available, but the system is currently shut off (isolated from the city supply, as a hydrostatic test is underway); sprinkler heads were noted missing in both basement stairways; it appears the wrong temperature heads may have been installed (high temperature heads were noted in the basement and first floor areas). The fire alarm system was out of service and the off-site monitoring phone connections were being installed at the time of this visit, several other deficiencies were noted including lack of the manual pull station, no monitoring point for the main sprinkler control valve. Exit signs and emergency lites were in service, exit hardware was satisfactory on the two 1st floor exit doors; signs were posted to indicate no public entry allowed to the basement and 2nd floor areas, although construction workers were intermittently in those areas; handrails on the front entrance were deficient. The building official required the front entry to be constantly manned with persons to assist as needed, as a temporary option for handrails. The fire marshal required a fire watch and an engine company to remain onsite during the event.
Code Occupancy Approval  8/29/2007 DONE
Inspection Record Card- Bld  8/27/2007  
BLD-Conference8/21/20078/22/20078/22/2007APASS
DetailsDave Hannah
scott Phone #: ###-####Note: please call 1/2 hr prior to conference
BLD-Framing/Rough-in7/10/20077/10/20077/10/2007PPART
DetailsDave Hannah
scott; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang shaft ok
Telephone call  5/17/2007 DONE
left mess for scott sparks that plans are here & no fees due --to check & see if he wanted plans???
Telephone call  2/8/2007 DONE
left mess for scott sparks at ###-#### that revised plans are ready for pickup
BLD-Other1/29/20071/30/20071/30/2007PPASS
DetailsDave Hannah
chris - hand rails; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Telephone call  12/19/2006 DONE
left mess for scott sparks at ###-#### that permit is ready & need to pay achd
Plan Reviewer's activity  11/14/2006 PASS
The revised structural drawings, including the cable guard for stairways, was approved. CJW
Plan resubmittals received  10/11/2006  
Received transmittal sheet, 2 copies of 4pg. Cable Rail Calculations from AHJ Engineers, 2 copies of page S4.2; per Carl Westfall take in as resubmittals, taken to him
BLD-Aging Inspection9/8/20069/8/20069/11/2006 PASS
DetailsDave Hannah
Plan resubmittals received  7/18/2006 DONE
Per Marlene S. received 1 cover transmittal, copies 2 copies of revised staris at the linen building structural calcs, 2 copies of the following sheets-- S1.1, S2.1, S3.1, S3.2, S4.1, S4.2 and taken to Carl Westfall
Issue PAID IN FULL permit  6/9/2006 DONE
Inspection Record Card- Bld  5/25/2006 DONE
Telephone call  5/25/2006 DONE
tlk to secretary ###-#### that permit and fees are ready to be picked up needs ACHD
Permit Ready to Issue  5/25/2006 DONE
Routing Off Site - STRUCTURAL4/26/2006 5/24/2006 PASS
Called Action Couriers for pick up. The second structural review was completed on May 5, 2006. The review failed. The structural review was completed on May 23, 2006. No further review required.
PLANS/APPL TAKEN TO FRONT DESK  5/24/2006 DONE
Routing - PLAN CHECK4/4/2006 5/24/2006 PASS
(4-26-06) The resubmitted drawings were reviewed and approved with "red lines" except for structural. The structural drawings were sent to the consultant Engineer. Waiting for his review. (5-24-06) The structural review was completed on May 23, 2006. No further review required.
Plan assigned to (CJW)3/6/2006 5/24/2006 PASS
5/24/2006 13:52:47 CJW - activity updated through activity BLDA022 from case BLD06-00500.
Plan resubmittals received  4/26/2006  
Received 1 copy of cover transmittal letter, 1 copy of structural responses to plan review comments, 1 copy of supplemtental structural calcs, 1 copy of ACHD comments from Lochsa Engineering, 1 copy of C1.01, A1.1, A1.2, A2.1, A4.1, A4.2, A4.3, S1.1, S2.1, S2.2, S3.1, S3.2, S4.1, S4.2 and taken to Carl W.
Plan resubmittals received  4/21/2006  
Received 1 copy of transmittal letter; 2 copies of each of the following-ACHD License agreement; engineering response letter; AHJ engineers response & sealed calculations; C1.01; A0.0; A1.1; A1.2; A2.1; A4.1; A4.2, A4.3; S1.1; S2.1; S2.2; S3.1; S3.2; S4.1; S4.2 and taken to Carl W.
Meeting  4/17/2006 DONE
Onsite visit to verify non-accessible and non-cumbustible space in basement. Verified that the space is infact non accessible and the floor above is slab concrete surrounded by concrete walls floor to ceiling. The space will not require fire protection.
Routing - FIRE3/31/2006 4/4/2006 PASS
Review complete. Sam Rogers responding to letter from architect requesting not to sprinkler inaccessible crawl space.
1st review completed  4/4/2006 FAIL
failed plan check.
Routing - PLAN CHECK3/17/2006 3/31/2006 FAIL
(3-23-06) Finished the IBC plan review except for the structural review by the consultant. Waiting for comments from the Consultant Structural Engineer. Sent back to Addressing for another address. (3-31-03) Incorporated the Consultant Structural Engineer's comments into the plan review report.
Routing Off Site - STRUCTURAL3/6/2006 3/30/2006 FAIL
Called Action Couriers for pick up
Routing - PUBLIC WORKS3/23/2006 3/24/2006 PASS
Sent back to addressing for another address.
Routing - PLANNING3/15/2006 3/17/2006 PASS
Sarah Schafer DRH06-00039

Approved per DRH06-00039.
Routing - PLUMBING3/15/2006 3/15/2006 PASS
per plans and 2003 upc
Routing - Erosion and Sediment3/14/2006 3/15/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS3/7/2006 3/14/2006 PASS
Plan resubmittals received  3/14/2006 DONE
Received 1 Erosion & Sediment application,1 trasnmittal,2 Erosion & Sediment Control Plans & 3 copys of sheet 2 of 2 taken and inserted into main plans./// DLD
Plan resubmittals received  3/9/2006  
Recieved 1 cover transmittal letter and 3 copies of C1.01 and taken to Brian Murphy
Routing - PLANNING Land Div3/6/2006 3/7/2006 PASS
Single parcel with one Tax Parcel # merged from Lots 5 and 6, Block 111 of Boise City Original Townsite.
Plans ACCEPTED BY PLAN TECH  3/3/2006  
Application received  3/3/2006  
Recd Pcfee & Taken To Pln CK  3/3/2006