BLD-Final | 12/28/2006 | 1/2/2007 | 1/2/2007 | A | PASS |
Tom Arcoraci
|
|
|
tony - please call for access ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith co issued
|
DOC - Permit Finaled | 1/2/2007 | 1/2/2007 | 1/2/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Energy code compliance | 9/13/2006 | 9/14/2006 | 9/14/2006 | P | PASS |
Jim Sly
|
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 9/11/2006 | 9/12/2006 | 9/12/2006 | A | PASS |
Jim Sly
|
|
|
tony Note: please call prior inspection to meet with; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Foundation | 6/27/2006 | 6/28/2006 | 6/28/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/27/2006 at 3:17:59 PM. Contact: ###-####.
|
BLD-Footing | 6/26/2006 | 6/27/2006 | 6/27/2006 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/26/2006 at 1:42:07 PM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 6/26/2006 | | |
|
|
|
|
(F) Reprint permit | | | 6/26/2006 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 3/3/2006 | 3/16/2006 | 6/20/2006 | | PASS |
|
|
|
6/20/2006 14:41:57 SAM - activity updated through activity BLDA022 from case BLD06-00510.
|
Case Summary (BLD) | | | 6/20/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/20/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/20/2006 | | 6/20/2006 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 6/20/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/20/2006 | | DONE |
|
|
|
lft vm with csc homes ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 6/20/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/7/2006 | | 4/19/2006 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 4/19/2006 | | DONE |
|
|
|
4/18/06 I recieved the roof framing layout, still waiting for the footing engineering. I called the builders office on 4/19 and left a message letting them know that I am still waiting for the footing engineering.
5/18/06 I called and talked to someone in the office. I let them know that I am still waiting for the footing engineering.
|
Plan resubmittals received | | | 4/17/2006 | | DONE |
|
|
|
Received 1 copy (2 Pages) of roof truss and taken to Steve M.
|
Plan Reviewer's activity | | | 3/17/2006 | | DONE |
|
|
|
3/17/06 08:00 I called Camil and let him know that I need a roof framing layout and the footing in the garage engineered before I can issue the permit. Plans are on hold.
3/27/06 16:35 I called and talked to James G. and let him know what I need.
5/24/06 13:10 I called and talked to James G. He said he will get the calculations for the footing to me.
|
Routing - PLANNING | 3/3/2006 | | 3/7/2006 | | PASS |
Tom Curren
|
|
|
|
Routing - PUBLIC WORKS | 3/7/2006 | | 3/7/2006 | | PASS |
|
|
|
|
Application received | | | 3/3/2006 | | |
|
|
|
|