Permit Information
Permit NumberBLD06-00515
StatusFinaled
Name PETRA
Site Address 734 W BROAD ST
Project NameHIGH DESERT HARLEY BODO 7
Customer Number 
ePlanReviewNo
Description
(NO CONTRACTOR REGISTRATION PROVIDED) (HIGH DESERT HARLEY DAVIDSON ARO - BODO BLDG #7) This building is fire sprinklered for fire area and to allow the multi-theater complex. To construct a retail sales tenant space within an existing 548 square foot space located on the ground floor of BODO Building #7. Work is to include 2-hr stairway enclosure walls, 2-hr stairway enclosure ceiling, interior nonbearing walls, millwork, and interior finishes. The restrooms that will serve this tenant space were created within a common area of this building under permit BLD06-00473. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall be maintained in compliance with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD7/7/20067/7/20067/27/2006 DONE
First Notice has not been responded to.
First Notice 6/2/20067/7/2006 DONE
FIRE-Final Inspection6/2/20066/5/20066/5/2006APASS
DetailsForrest France
Corrections have been made, fire life safety finaled.
BLD-Final6/1/20066/2/20066/2/2006PCANC
DetailsJim Storey
greg; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley\\Dave will you check to see if this job requires a plumbing permit they paid sewer fees and owe for additional sewer but did not pull a plumbing permit. They also owe for the additional sewer fees.Rita
BLD-Final6/1/20066/2/20066/2/2006APASS
DetailsJim Storey
greg; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley Dave will you check to see if this job requires a plumbing permit they paid sewer fees and owe for additional sewer but did not pull a plumbing permit. They also owe for the additional sewer fees.Rita
Code Occupancy Approval  6/2/2006 PASS
OK FINAL SIGNED
Override - Condition Holds  6/2/2006  
Permanent occupancy UNPAID FEE  6/2/2006 DONE
Perm. Occ. Cert. # 11060 issued 6-2-06 to High Desert Harley Davidson Aro.
FIRE-Final Inspection6/1/20066/2/20066/1/2006ACANC
DetailsDave Hannah
greg ###-#### call prior to insp Inspection cancelled from web by: Barbara Buckley
Override - Condition Holds1/1/19001/1/19006/1/2006  
per rita, could not reach sewer department to verify double billing/6/01/06/blb
Override - Condition Holds1/1/19001/1/19006/1/2006  
per rita, could not reach sewer dept/6/01/06/blb
Print Occupancy Form  5/17/2006 DONE
BLD-Framing/Rough-in5/10/20065/10/20065/10/2006PPART
DetailsDave Hannah
craig; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to start covering walls
Permanent Occupancy 5/2/20065/2/2006 DONE
Details
BLD-Conference4/25/20064/25/20064/25/2006PPASS
DetailsDave Hannah
petra; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Print Occupancy Form  4/14/2006 DONE
Telephone call  4/14/2006 DONE
lft ms with secretary for dave thomas ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  4/14/2006 DONE
Issue PAID IN FULL permit  4/14/2006 DONE
Routing - PLAN CHECK3/31/2006 4/13/2006 PASS
(4-7-06) Sent the owner (Pete Conlon) an E-mail. Suggested how the service sink issue could be resolved. Waiting for his response. (4-13-06) Received a response from the Architect.
Plan assigned to (CJW)3/9/2006 4/13/2006 PASS
4/13/2006 15:33:21 CJW - activity updated through activity BLDA022 from case BLD06-00515.
Routing - PUBLIC WORKS4/13/2006 4/13/2006 DONE
Sent back to Public Works for sewer fee assessment for the service sink.
PLANS/APPL TAKEN TO FRONT DESK  4/13/2006 DONE
Plan resubmittals received  4/5/2006 DONE
Received 1 response,1 cover letter, & 3 copys of sheets A-1,A-2,E2.1P taken to Carl W.
1st review completed  3/31/2006 FAIL
Failed plan check.
Routing - FIRE3/30/2006 3/31/2006 PASS
Attached review comments to plans. Faxed review comments to architect.
Routing - PLANNING3/28/2006 3/30/2006 PASS
Approved.
Routing - PLAN CHECK3/10/2006 3/28/2006 FAIL
The IBC plan review was started on March 17, 2006 and was finished on March 28, 2006. The IBC plan review was delayed while an interpretation by management was being considered. Revised drawings were required. See the plan review report.
Plan Reviewer's activity  3/17/2006 DONE
Requested an interpretation from the Building Division Manager about the location and access to restrooms. Direction is needed before a decision can be made. CJW
Routing - PUBLIC WORKS3/9/2006 3/10/2006 PASS
Plans ACCEPTED BY PLAN TECH  3/6/2006  
Application received  3/3/2006  
Recd Pcfee & Taken To Pln CK  3/3/2006  
Fee Review-notes3/3/20063/3/2006