Case Summary (BLD) | | | 10/3/2012 | | DONE |
|
|
|
|
BLD-Final | 3/20/2007 | 3/20/2007 | 3/20/2007 | P | PASS |
Dave Hannah
|
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
DOC - Permit Finaled | 3/20/2007 | 3/20/2007 | 3/20/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 10/17/2006 | 10/18/2006 | 10/20/2006 | A | PART |
Dave Hannah
|
|
|
Marshall; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to move in but need to fix side slope next to house
|
Telephone call | | | 10/19/2006 | | DONE |
|
|
|
I recieved a phone call from Dave Hannah and he stated he is requireing a retaining wall for this site due to slope of lot. Site plan did not show Topography. (SRZ)
|
BLD-Final | 10/13/2006 | 10/16/2006 | 10/16/2006 | A | CANC |
Dave Hannah
|
|
|
Marshall; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Energy code compliance | 6/26/2006 | 6/27/2006 | 6/27/2006 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/26/2006 at 4:22:26 PM. ok to cover
|
BLD-Framing/Rough-in | 6/22/2006 | 6/23/2006 | 6/23/2006 | A | PASS |
Dave Hannah
|
|
|
marshall; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to insulate
|
BLD-Foundation | 5/9/2006 | 5/9/2006 | 5/9/2006 | P | PASS |
Dave Hannah
|
|
|
dave plans in plastic bag on power pole; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
BLD-Footing | 5/1/2006 | 5/2/2006 | 5/2/2006 | A | PASS |
Dave Hannah
|
|
|
Dave pour time 11am; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung need a retaining wall on north side of house
|
BLD-Footing | 4/28/2006 | 5/1/2006 | 5/1/2006 | A | DONE |
Dave Hannah
|
|
|
dave Note: pouring at 11:00; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 5/1/06 - per Dave cancel inspection until tomorrow - ikc
|
Issue PAID IN FULL permit | | | 4/25/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/11/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/11/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/11/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/11/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/11/2006 | | |
|
|
|
tlk to receptionist ###-#### that permit and fees are ready to be picked up - cmc 11:20 am 4/12/2006
|
Routing - PLAN CHECK | 3/9/2006 | | 4/11/2006 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 4/10/2006 | | PASS |
|
|
|
Recieved Resubmital with Wall Bracing Locations called out on plans. (SRZ)
|
Plan assigned to (SAM) | 3/6/2006 | 3/6/2006 | 3/29/2006 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/29/2006 | | FAIL |
|
|
|
Wall Bracing locations required to be shown on Plans (as per Boise city New construction Plan submittal Policy.)
|
Plan resubmittals requested | | | 3/29/2006 | | |
|
|
|
New Floor plan with Wall Bracing locations called out. (SRZ)
|
Telephone call | | | 3/29/2006 | | |
|
|
|
Called Contact person Marshall Williams and requested his designer re-submitt floor plans with Wall bracing locations called out as per Boise city New construction Plan submittal requirements. (SRZ)
|
Routing - PUBLIC WORKS | 3/9/2006 | | 3/9/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 3/6/2006 | | 3/8/2006 | | PASS |
Tom Curren
|
|
|
|
Application received | | | 3/6/2006 | | |
|
|
|
|