Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00530
StatusFinaled
Name ANIRUDDHA SUR
Site Address 1400 W RANCH RD
Project Name 
Customer Number 
ePlanReviewNo
Description
"NO CONTRACTOR REGISTRATION PROVIDED. APPLICANT CERTIFIES EXEMPTION PER IDAHO STATUTE 54-5205" This project is for the addition of 440s.f. master suite addition and a 400s.f. attached garage to an existing 1863s.f. 1-story single family dwelling. Separate electrical, plumbing, mechancal and ESC permits are required. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." and A letter from the applicant's geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. ESC plan waiver request approved by Aimee Hughes. R-1B setbacks ok per Tom Curen. All per the approved plans as marked REScheck and plan review notes. pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/22/2010  
Case Summary (BLD)  4/22/2010  
BLD-Final7/11/20077/11/20077/12/2007PPASS
DetailsTony Young
dave; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
DOC - Permit Finaled7/12/20077/12/20077/12/2007PPASS
DetailsTony Young
BLD-Final6/21/20076/25/20076/25/2007AFAIL
DetailsTony Young
dave Phone #: ###-####
need insulation in crawl,, ok to occupy
BLD-Conference6/14/20076/15/20076/15/2007ACANC
DetailsTony Young
dave ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Final6/13/20076/13/20076/13/2007PNR
DetailsJim Storey
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in1/19/20071/19/20071/19/2007PPASS
DetailsJim Sly
david; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
F & E OK
BLD-Framing/Rough-in1/10/20071/10/20071/10/2007PNR
DetailsTony Young
dave; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Other11/8/200611/8/200611/8/2006PPART
DetailsTony Young
david - note: shear inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
ext shear/brace ok
BLD-Framing/Rough-in9/20/20069/20/20069/20/2006PPART
DetailsTony Young
dave - sheer walls; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
shear not reqd
BLD-Foundation7/27/20067/28/20067/28/2006APART
DetailsTony Young
david; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing7/21/20067/24/20067/24/2006APART
DetailsTony Young
andy ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
using method #1,, wider ftg,, need to clean loose material out and use #4 rebar instead of #3
PubWorks Subgrade Approval7/24/20067/24/20067/24/2006 PART
The footing subgrade was inspected by American Geotechnics and found that the bearing capacity was only 1,000 psf instead of the 1500 psf that was used for design. They recommended two alternatives. 1. Footing widths may be increased by 50% to account for the lower bearing capacity, 2. Over-excavate the footings to a depth of 24 inches below the footing and a width of 48 inches and replace tyhe material with crushed aggregates base that is placed in maximum 8 inch liftsmoisture conditioned and compacted to 95% of standard proctor.
The second alternative would require verification by the engineer.
Inspection Record Card- Bld  7/14/2006 DONE
Issue PAID IN FULL permit  7/14/2006 DONE
Inspection Record Card- Bld  7/14/2006 DONE
(F) Reprint permit  7/14/2006  
Telephone call  7/11/2006 DONE
Spoke with Aniruddha Sur he says he is the new parcel owner and wants to be the GC. I explained that we would need a copy of deed of trust listing both him as buyer and who the seller was. I also remided him of the fees///7/11/06 @ 12:15pm BAS
Telephone call  7/7/2006 DONE
Spoke with Ken Jensen, he no longer is on this project please remove him from any connections with this permit///7/7/06 @ 2:30pm BAS
Telephone call  7/7/2006 DONE
Spoke with Aniruddha and confirmed that Ken is no longer involved with this project and that a new gc has been chosen. He is suppose to contact me next week with the new GC's name & # and tell me when they will pick up this permit///7/7/06 @ 3:15pm BAS
Inspection Record Card- Bld  7/7/2006 DONE
Plan assigned to (PEP)3/7/20063/7/20063/9/2006 PASS
3/9/2006 12:17:05 PEP - activity updated through activity BLDA022 from case BLD06-00530.
Case Summary (BLD)  3/9/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/9/2006 DONE
Inspection Record Card- Bld  3/9/2006 DONE
Telephone call  3/9/2006 DONE
lft vm ken jensen ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  3/9/2006 DONE
Routing - Erosion and Sediment3/8/2006 3/8/2006 PASS
ESC waiver request approved with attached conditions.
Application received  3/7/2006  
Routing - Erosion and Sediment3/7/2006 3/7/2006 FAIL
No ESC plan or waiver request included with application, notified applicant. Plan is in ESC pending box
Routing - PLAN CHECK3/8/2006    
Perry P.