Case Summary (BLD) | | | 4/22/2010 | | |
|
|
|
|
Case Summary (BLD) | | | 4/22/2010 | | |
|
|
|
|
BLD-Final | 7/11/2007 | 7/11/2007 | 7/12/2007 | P | PASS |
Tony Young
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
DOC - Permit Finaled | 7/12/2007 | 7/12/2007 | 7/12/2007 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/21/2007 | 6/25/2007 | 6/25/2007 | A | FAIL |
Tony Young
|
|
|
dave Phone #: ###-#### need insulation in crawl,, ok to occupy
|
BLD-Conference | 6/14/2007 | 6/15/2007 | 6/15/2007 | A | CANC |
Tony Young
|
|
|
dave ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Final | 6/13/2007 | 6/13/2007 | 6/13/2007 | P | NR |
Jim Storey
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 1/19/2007 | 1/19/2007 | 1/19/2007 | P | PASS |
Jim Sly
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Victoria Beall F & E OK
|
BLD-Framing/Rough-in | 1/10/2007 | 1/10/2007 | 1/10/2007 | P | NR |
Tony Young
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Other | 11/8/2006 | 11/8/2006 | 11/8/2006 | P | PART |
Tony Young
|
|
|
david - note: shear inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ext shear/brace ok
|
BLD-Framing/Rough-in | 9/20/2006 | 9/20/2006 | 9/20/2006 | P | PART |
Tony Young
|
|
|
dave - sheer walls; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley shear not reqd
|
BLD-Foundation | 7/27/2006 | 7/28/2006 | 7/28/2006 | A | PART |
Tony Young
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 7/21/2006 | 7/24/2006 | 7/24/2006 | A | PART |
Tony Young
|
|
|
andy ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie using method #1,, wider ftg,, need to clean loose material out and use #4 rebar instead of #3
|
PubWorks Subgrade Approval | 7/24/2006 | 7/24/2006 | 7/24/2006 | | PART |
|
|
|
The footing subgrade was inspected by American Geotechnics and found that the bearing capacity was only 1,000 psf instead of the 1500 psf that was used for design. They recommended two alternatives. 1. Footing widths may be increased by 50% to account for the lower bearing capacity, 2. Over-excavate the footings to a depth of 24 inches below the footing and a width of 48 inches and replace tyhe material with crushed aggregates base that is placed in maximum 8 inch liftsmoisture conditioned and compacted to 95% of standard proctor.
The second alternative would require verification by the engineer.
|
Inspection Record Card- Bld | | | 7/14/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/14/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/14/2006 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/14/2006 | | |
|
|
|
|
Telephone call | | | 7/11/2006 | | DONE |
|
|
|
Spoke with Aniruddha Sur he says he is the new parcel owner and wants to be the GC. I explained that we would need a copy of deed of trust listing both him as buyer and who the seller was. I also remided him of the fees///7/11/06 @ 12:15pm BAS
|
Telephone call | | | 7/7/2006 | | DONE |
|
|
|
Spoke with Ken Jensen, he no longer is on this project please remove him from any connections with this permit///7/7/06 @ 2:30pm BAS
|
Telephone call | | | 7/7/2006 | | DONE |
|
|
|
Spoke with Aniruddha and confirmed that Ken is no longer involved with this project and that a new gc has been chosen. He is suppose to contact me next week with the new GC's name & # and tell me when they will pick up this permit///7/7/06 @ 3:15pm BAS
|
Inspection Record Card- Bld | | | 7/7/2006 | | DONE |
|
|
|
|
Plan assigned to (PEP) | 3/7/2006 | 3/7/2006 | 3/9/2006 | | PASS |
|
|
|
3/9/2006 12:17:05 PEP - activity updated through activity BLDA022 from case BLD06-00530.
|
Case Summary (BLD) | | | 3/9/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/9/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/9/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/9/2006 | | DONE |
|
|
|
lft vm ken jensen ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 3/9/2006 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/8/2006 | | 3/8/2006 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Application received | | | 3/7/2006 | | |
|
|
|
|
Routing - Erosion and Sediment | 3/7/2006 | | 3/7/2006 | | FAIL |
|
|
|
No ESC plan or waiver request included with application, notified applicant. Plan is in ESC pending box
|
Routing - PLAN CHECK | 3/8/2006 | | | | |
|
|
|
Perry P.
|