Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD06-00565
StatusFinaled
Name INTERWEST HOMES
Site Address 2148 S DAISY AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
RCE-1127 INTERWEST HOMES, INC. To construct a 1835 sq. ft. one story single family dwelling with a 816 sq. ft. attached three car garage, a 56 sq. ft. covered concrete entry porch and a 123 sq. ft. covered concrete patio at rear of structure per approved plans, all red lining and attached condition list. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." R-1A SOLAR PROTECTED PC# 138 DJO

R-1A SOLAR PROTECTED DJO

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/6/20071/8/20071/8/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/6/2007 at 5:12:31 PM. Contact: ###-####.
DOC - Permit Finaled1/8/20071/8/20071/8/2007PPASS
DetailsMike Jordan
All issues have been resolved. Added smoke detector and redwood step installed.
BLD-Final12/14/200612/15/200612/15/2006AFAIL
DetailsMike Jordan
Ben Note: Call for gargage code; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett. Step required in garage at door to houser.(exceeds the 7.75 inch max allowed) Needs to install additional smoke alarm outside of masterbedroom.
BLD-Framing/Rough-in5/19/20065/19/20065/19/2006PPASS
DetailsMike Jordan
BEN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. All framing issues have been resolved.
BLD-Energy code compliance5/19/20065/19/20065/19/2006PPASS
DetailsMike Jordan
BEN; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in5/17/20065/18/20065/18/2006AFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/17/2006 at 1:07:34 PM. Contact: ###-####. Complete lateral bracing, install correct top plate straps. c/n posted. ok to insul.
BLD-Foundation4/15/20064/17/20064/17/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/15/2006 at 1:41:21 PM. Contact: ###-####.
BLD-Footing4/13/20064/14/20064/14/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/13/2006 at 1:53:19 PM. Contact: ###-####.
Issue PAID IN FULL permit  4/12/2006 DONE
Routing - PLAN CHECK3/24/2006 4/11/2006 PASS
Case Summary (BLD)  4/11/2006  
PLANS/APPL TAKEN TO FRONT DESK  4/11/2006 DONE
Inspection Record Card- Bld  4/11/2006  
Permit Ready to Issue  4/11/2006 DONE
Telephone call  4/11/2006  
called ###-#### and told Jessica that permit is ready and fee
Plan assigned to (SAM)3/9/20063/9/20064/3/2006 DONE
Routing - PUBLIC WORKS3/23/2006 3/24/2006 PASS
Plan resubmittals received  3/23/2006  
New Plans Resubmitted Taken to Tom C.
Routing - PLANNING3/23/2006 3/23/2006 PASS
Site plan redrawn. Plan complies with solar setback requirements and driveway setback. TAC
Routing - PLANNING3/9/2006 3/14/2006 FAIL
DetailsTom Curren
Lot is a solar lot. Solar setback requirement for this house would be 11 ft. on north side. Plan show 7 ft.
Lot is a corner lot. Driveways must be located at least 50 ft for the corner. Driveway does not meet setback requirements.
Contacted Ben Blaser 3/14. He said he would redraw the plans. TAC
Application received  3/9/2006  
Plan assigned to (DJO)4/3/2006   PEND