Permit Information
Permit NumberBLD06-00579
StatusFinaled
Name MTN WEST SENIOR HOUSING LLC
Site Address 5850 N FIVE MILE RD
Project NameBONAVENTURE PLACE
Customer Number 
ePlanReviewNo
Description
(Bonaventure Place Assisted Living Community) This building is fully sprinklered for allowable area increase and to increase stories from two to three for this occupancy use group. To construct a 57,480 sq. ft., three story, 75 Unit (less than 800 sq. ft. per unit) assisted living community to include support facilities, for use by persons unable take action to provide self preservation in an emergency situation. This building is classified as Type IIA construction in accord with State of Idaho Facility Standards. Building elements listed in Table 601, 2003 IBC are to be non-combustible. A non-combustible framed 2-hour fire wall is to be constructed between the 'I2' occupancy and 'A2' occupancy. DRH05-00320 CUP05-00028 drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Routing - PLAN CHECK  12/27/2007 PASS
Second Notice BLD10/17/200710/17/200710/30/2007 DONE
First Notice has not been responded to.
First Notice 10/3/200710/17/2007 DONE
FIRE-Final Inspection10/2/200710/2/200710/3/2007PPASS
DetailsTroy Cobbley
Life safety passed
Permanent Occupancy  10/3/2007 DONE
BLD-Final10/2/200710/2/200710/2/2007PPASS
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Dale Shuart
OK for Perm Occ.
Meeting  9/27/2007 DONE
Meeting on site with Ben Sattecase, 9/26/07; following email sent 9/27 in confirmation of agreement:
Ben, This confirms our approval for temporary storage of personal belongings being moved into approximately 12 units, beginning 9/28/007, subject to conditions as stated in your email below. As you stated, belongings are to be stacked neatly against perimeter walls so as not to interfere with any devices that may need to be reached or observed for inspection or installation work. Other than this limited storage, all units must remain unoccupied until a Certificate of Occupancy is granted by the City.
Thank you for your cooperation.
Sam Rogers, PDS/Fire
###-####
PubWorks Occupancy Approval9/12/20079/12/20079/12/2007 DONE
Code Occupancy Approval9/7/20079/7/20079/7/2007APASS
DetailsCarol Montgomery
Code Occupancy Approval Temp9/5/20079/5/20079/5/2007AFAIL
DetailsCarol Montgomery
Made inspection of site on 9-4-2007. Still have a small amount of hydroseeding to do and the remainder of the landscaping (incl. undergrd. sprinkle system) at the sw corner of the project. There is a $9,400.00 Bond in place so I am signing off on temporary(s)
BLD-Final8/31/20079/4/20079/4/2007PNR
DetailsJim Sly
Final for D wing. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Conference8/31/20079/4/20078/31/2007PCANC
DetailsJim Sly
Final in D wing! Phone #: ###-#### Internet Inspection Request from: Dale Shuart Inspection cancelled from web by: Dale Shuart
BLD-Final8/31/20079/4/20078/31/2007PCANC
DetailsJim Sly
Final in A and B wings. Phone #: ###-#### Internet Inspection Request from: Dale Shuart Inspection cancelled from web by: Dale Shuart
BLD-Conference8/24/20078/27/20078/27/2007APASS
DetailsJim Sly
Please inspect final attic insulation in D-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Other7/25/20077/31/20077/31/2007APASS
DetailsJim Sly
Please inspect D-wing T-bar ceiling 1st floor - see Dale first. Thanks Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Wall cover7/2/20077/3/20077/3/2007APASS
DetailsJim Sly
Please inspect sheetrock nailing in D-wing 3rd floor completed units. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Wall cover6/28/20076/28/20076/28/2007PPASS
DetailsJim Sly
Please inspect 3rd floor D-wing sheetrock. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Energy code compliance6/25/20076/26/20076/26/2007APASS
DetailsJim Sly
Please inspect D-wing 3rd floor insulation. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Energy code compliance6/25/20076/25/20076/25/2007PCANC
DetailsJim Sly
Please inspect insulation on 3rd floor of D-wing. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Wall cover6/13/20076/13/20076/13/2007PPASS
DetailsJim Sly
Please inspect 1st layer sheetrock nailing on 3rd floor of D-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Conference6/12/20076/12/20076/12/2007PPASS
DetailsJim Sly
Please inspect nailing in completed units on 2nd floor of D-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Energy code compliance6/8/20076/8/20076/8/2007PPASS
DetailsJim Sly
Please inspect insulation on 2nd floor of D-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Wall cover6/6/20076/7/20076/7/2007PPASS
DetailsJim Sly
Please inspect first layer lids and structural shear walls on 2nd floor of D-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Wall cover6/6/20076/7/20076/7/2007APASS
DetailsJim Sly
Please inspect completed units on 1st floor of D-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
Shear walls, flr/ceil. assemb, and all drywall OK in units..... 1st flr "D" wing.
BLD-Wall cover5/30/20075/31/20075/31/2007APASS
DetailsJim Sly
Please inspect 1st floor D-wing sheetrock: 1st layer lids and structural shear walls - see John Coe. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Wall cover5/29/20075/30/20075/31/2007ACANC
DetailsJim Sly
Please inspect 1st floor D-wing sheetrock: 1st layer lids and structural shear walls - see John Coe. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Energy code compliance5/23/20075/24/20075/24/2007PPASS
DetailsJim Sly
Please inspect 1st floor D-wing insulation. Thanks Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Framing/Rough-in5/17/20075/18/20075/18/2007PPASS
DetailsJim Sly
Please inspect 1st floor D-wing fire-caulking. Thanks! Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Conference4/12/20074/12/20074/12/2007PPASS
DetailsJim Sly
Please inspect shear nailing in D-wing (metal). Anytime today is fine. Tahnks. Phone #: ###-####
BLD-Framing/Rough-in4/11/20074/12/20074/12/2007APASS
DetailsJim Sly
Please inspect D-wing (metal) 3rd floor framing and trusses around 9 or 10 am if possible. See Brad w/ Lombac. Thanks! Phone #: ###-####
BLD-Framing/Rough-in2/21/20072/22/20072/22/2007APASS
DetailsJim Sly
Please inspect 2nd floor framing in D-wing. Thanks. Phone #: ###-####
BLD-Conference2/20/20072/21/20072/21/2007APART
DetailsJim Sly
Please inspect 2nd floor D-wing framing. Thanks. Phone #: ###-####
BLD-Framing/Rough-in2/8/20072/9/20072/9/2007PPART
DetailsJim Sly
Please inspect D-wing steel stairs - Dale will walk inspection with you. Thanks. Phone #: ###-####
BLD-Framing/Rough-in2/6/20072/7/20072/7/2007PPART
DetailsJim Sly
Please inspect walls and trusses at MDP Room in PM near D-wing. Thanks. Phone #: ###-####
OK
BLD-Framing/Rough-in2/5/20072/6/20072/6/2007PPART
DetailsJim Sly
Please inspect pandeck screwing at metal D-wing. Thank you. Phone #: ###-####
OK
Plan resubmittals received  1/26/2007  
ok to log in as resubmittls per Dan Stuart; Received 2 copies of pg 1 of 1 Roof Truss Layout and 2 copies of truss drawing package from Gem State Truss; taken to Dan Stuart
BLD-Footing1/12/20071/16/20071/16/2007APART
DetailsJim Sly
Please inspect footings for MDP room (near D-wing) as early as possible on Tuesday. Thanks! Phone #: ###-####
OK pend special insp MTI
BLD-Framing/Rough-in1/10/20071/10/20071/10/2007PPASS
DetailsJim Sly
Please inspect rest of 1st floor D-wing (metal framed wing) in PM. Phone #: ###-####
BLD-Framing/Rough-in1/8/20071/10/20071/9/2007PNH
DetailsJim Sly
Please inspect the rest of D-wing 1st floor framing (metal framed wing). Thank you. Phone #: ###-####
Could not find John at jobsite.
BLD-Concrete1/8/20071/8/20071/8/2007PPASS
DetailsJim Sly
Please inspect wire mesh on 2nd floor D-wing pandeck. Thank you. Phone #: ###-####
BLD-Framing/Rough-in12/29/20061/2/20071/2/2007PPASS
DetailsTony Young
Please inspect screwing at pandeck in the D-wing. Thanks and Happy New Year.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Framing/Rough-in12/15/200612/15/200612/15/2006PPART
DetailsJim Sly
Please inspect pandeck screwing at D-wing today. This morning would work too...sorry about late notice. Thanks Jim!; Phone #: ###-#### Internet Inspection Request
from: Dale Shuart
East 1/3 D wing pan deck fastening OK.
BLD-Framing/Rough-in12/5/200612/7/200612/7/2006PPART
DetailsJim Sly
Please inspect screwing of 2nd floor pandeck at D-wing (metal framed wing). Thanks. ; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
OK
BLD-Framing/Rough-in11/10/200611/13/200611/13/2006APART
DetailsJim Sly
Please inspect framing on 1st floor of D-wing (metal framed) to L-line. ; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Other10/31/200611/1/200611/1/2006ADONE
DetailsJim Sly
Please meet John Woods for consultation on D-wing (metal frame) in morning if possible). Thanks; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
BLD-Foundation10/9/200610/11/200610/11/2006APART
DetailsJim Sly
Please inspect rebar at D-wing in AM. Thanks.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
OK pending MTI special insp, tests and approals.
BLD-Footing9/20/20069/21/20069/21/2006APART
DetailsJim Sly
Please inspect D-wing elevator floor in morning. ; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
OK Pending MTI special insp, tests and approvals.
BLD-Footing9/14/20069/15/20069/15/2006PPART
DetailsJim Sly
Please inspect footings for D-wing during PM.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
OK Pending MTI special insp tests and approvals
(F) Reprint permit  9/1/2006  
Routing - PLAN CHECK8/18/2006 8/31/2006 PASS
Routing - PLUMBING8/31/2006 8/31/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  8/31/2006 DONE
Print Occupancy Form  8/31/2006 DONE
Permit Ready to Issue  8/31/2006 DONE
Issue PAID IN FULL permit  8/31/2006 DONE
Plan assigned to (DRS)3/10/2006 8/31/2006 PASS
8/31/2006 10:57:08 MYS - activity updated through activity BLDA022 from case BLD06-00579.
Routing - FIRE8/15/2006 8/18/2006 PASS
Attached updated review comments to plans.
Routing - PLANNING8/14/2006 8/15/2006 PASS
Susan Riggs ok of CUP passed to Sara Schfer for DR
Telephone call  8/15/2006 DONE
Had phone conference call with Larry, architect representative, and Jason Tarkowsky, owner, and Ben Settecase, owner. Jenifer Gilliland and Marlene Southard were present with me as we reviewed the plan review comments still needing to be addressed for this project.
Routing - PLANNING8/15/2006 8/15/2006 PASS
Approved per DRH05-00320 Modification #2.
Routing Off Site - STRUCTURAL8/2/2006 8/14/2006 PASS
Called Action Courier 8/2/06 @ 10:00am BAS
8/14/06 received Fax from structural engineer approving structural plans.
Routing - PLUMBING8/9/2006 8/14/2006 FAIL
use boise city approved grease interceptor detail, attached. Plumbing and civil drawings do not match for grease interceptor piping or the building drain/ building sewer sizing for area "A". all food prep and warewashing sinks and equipment must be indirectly drained. upper terminal cleanouts from 1st. review have not been addressed.
Routing - PUBLIC WORKS8/9/2006 8/9/2006 PASS
Plan resubmittals requested  8/8/2006 DONE
Copy of plan review items e-mailed and faxed to greg elmore.
Routing - PLAN CHECK5/22/2006 8/8/2006 FAIL
Plan resubmittals provided were incorrect or incomplete. Items of first plan review conditions not answered were redone to clarify wherein they failed and some new items brought about by changes made to the plans were also identified. Copy of review e-mailed and faxed to architect. Routing to plumbing for re-review then fire code analyst.
Plan Reviewer's activity  8/1/2006 DONE
Received copy of engineering response from Mat Gralund, BMGP in response to outsource third party structural review report of 3/29/06. Routing new plans and calcs to permit desk to route to Keith Jones for re-review.
Plan resubmittals received  7/28/2006  
Received 3 copies of the following sheets--A1.1B, A1.1C, A1.2, A1.3, A2.1, A2.1A, A2.1B, A2.1DF, A2.2, A2.2A, A2.2B, A2.2D, A2.3, A2.3A, A2.3B, A2.3D, A2.4, A3.1, A3.2, A3.3, A4.1, A4.2, A4.3, A5.1, A6.1, A6.2, A6.3, A7.1, A8.1, A8.2, A8.3, A9.1, A9.2, S0.1, S1.1A, S1.1B, S1.1C, S1.1D, S2.1A, S2.1B, S2.1C, S2.1D, S2.2A, S2.2B, S2.2C, S2.2D, S2.3A, S2.3B, S2.3C, S2.3D, S2.4, S3.1, S3.2, S5.1, S5.2, S6.1, S7.1, S7.2, S8.1, S8.2, S8.3, S8.4, S8.5, S9.1, M2.1, M2.1A, M2.1B, M2.1C, M2.2, M2.2A, M2.2B, M2.2C, M2.3, M2.3A, M2.3B, M2.3C, M2.4, M2.4A, M2.4B, M2.4C, M3.1, M3.2, M4.1, M4.2, M5.1, M5.2, P1.0, P1.1, P1.3, P1.4, P2.1, P2.2, P2.3, P2.4, P3.1, P3.2, P3.3, P3.4, P4.1, P4.2, P4.3, P4.4, P5.1, P6.1, P6.2, HOOD PERMIT DRAWING,1 set of revised structure calcs, 2 copies of Plan review response letter and taken to Dan stuart
Plan resubmittals received  6/23/2006 DONE
Received 1 transmittal , & 2 copys of sheets C1,C2,L2.1,L2.3 taken to Dan S.
Routing - PLANNING6/20/2006 6/20/2006 FAIL
Failed for lack of landscape plan, site plan of entire develiopment and x-access agreement.
1st review completed  5/22/2006 FAIL
Failed Plan Check and Fire.
Routing - FIRE5/11/2006 5/22/2006 FAIL
Attached review comments to plans.Faxed resubmittal items to architect.
Routing - PLAN CHECK4/12/2006 5/2/2006 FAIL
Dan Stuart Copy of plan review report faxed and e-mailed to architect of record, Greg Elmore. Will route to fire code analyst when residential units have been reviewed all part of same plan submittals.
Plan resubmittals requested  5/2/2006 DONE
By e-mail & fax to architect.
Routing - PLANNING Land Div4/14/2006 4/14/2006 PASS
Plat has been recorded.
Routing - PLANNING4/11/2006 4/12/2006 FAIL
Marty S. DRH05-00320 Landscape plan needs to be reworked a little. There need to be shrubs added to the parking lot planters and the evergreen trees especially the Austrian Pines along Willowcliff need to have a wider spacing approximately 15'-20'.

Susan R. CUP05-00028
Routing - PLUMBING3/27/2006 4/11/2006 FAIL
DetailsLee Rice
Several corrections requiring resubmittal....faxed copy of review to architect.
Routing Off Site - STRUCTURAL3/10/2006 3/29/2006 FAIL
Called action Courrier for Pick up @2:20 BAS
3/29/06 Received report of structural review by third party contract structural firm. Corrections & resubmittals are required. Faxed a copy of plan review with cover letter to Greg Elmore, architect of record, for required response.
Routing - Erosion and Sediment3/22/2006 3/27/2006 PASS
ESC plan approved with attached conditions. 3/27/06 Refer to ESC06-00325 as master plan for project, RP must be determined before permit is issued. adh.
Routing - PUBLIC WORKS3/15/2006 3/22/2006 FAIL
Eliminate disposer(s) in kitchen. 3100 gallon grease interceptor/a typical volume/potentially to large; Need to show UPC sizing calculation; If volume prescription is correct, install two 1500 gallon interceptors; an interceptor this size will require odor control assessment. Contact Mike Hunter ###-####
Routing - PLANNING Land Div3/10/2006 3/15/2006 PEND
Do not issue Building Permit until the Final Plat has been recorded at the County. The City Engineer signed the Final Plat in Dec. 2005.
Plans ACCEPTED BY PLAN TECH  3/10/2006  
Plan routing begun/NEW & ADDTN  3/10/2006  
Application received  3/10/2006  
Recd Pcfee & Taken To Pln CK  3/10/2006  
Third Notice BLD10/30/200710/30/2007   
Second Notice has not been responded to.
Fee Review-notes3/10/20063/10/2006