Routing - PLAN CHECK | | | 12/27/2007 | | PASS |
|
|
|
|
Second Notice BLD | 10/17/2007 | 10/17/2007 | 10/30/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/3/2007 | 10/17/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/2/2007 | 10/2/2007 | 10/3/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Permanent Occupancy | | | 10/3/2007 | | DONE |
|
|
|
|
BLD-Final | 10/2/2007 | 10/2/2007 | 10/2/2007 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK for Perm Occ.
|
Meeting | | | 9/27/2007 | | DONE |
|
|
|
Meeting on site with Ben Sattecase, 9/26/07; following email sent 9/27 in confirmation of agreement:
Ben, This confirms our approval for temporary storage of personal belongings being moved into approximately 12 units, beginning 9/28/007, subject to conditions as stated in your email below. As you stated, belongings are to be stacked neatly against perimeter walls so as not to interfere with any devices that may need to be reached or observed for inspection or installation work. Other than this limited storage, all units must remain unoccupied until a Certificate of Occupancy is granted by the City.
Thank you for your cooperation.
Sam Rogers, PDS/Fire
###-####
|
PubWorks Occupancy Approval | 9/12/2007 | 9/12/2007 | 9/12/2007 | | DONE |
|
|
|
|
Code Occupancy Approval | 9/7/2007 | 9/7/2007 | 9/7/2007 | A | PASS |
Carol Montgomery
|
|
|
|
Code Occupancy Approval Temp | 9/5/2007 | 9/5/2007 | 9/5/2007 | A | FAIL |
Carol Montgomery
|
|
|
Made inspection of site on 9-4-2007. Still have a small amount of hydroseeding to do and the remainder of the landscaping (incl. undergrd. sprinkle system) at the sw corner of the project. There is a $9,400.00 Bond in place so I am signing off on temporary(s)
|
BLD-Final | 8/31/2007 | 9/4/2007 | 9/4/2007 | P | NR |
Jim Sly
|
|
|
Final for D wing. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Conference | 8/31/2007 | 9/4/2007 | 8/31/2007 | P | CANC |
Jim Sly
|
|
|
Final in D wing! Phone #: ###-#### Internet Inspection Request from: Dale Shuart Inspection cancelled from web by: Dale Shuart
|
BLD-Final | 8/31/2007 | 9/4/2007 | 8/31/2007 | P | CANC |
Jim Sly
|
|
|
Final in A and B wings. Phone #: ###-#### Internet Inspection Request from: Dale Shuart Inspection cancelled from web by: Dale Shuart
|
BLD-Conference | 8/24/2007 | 8/27/2007 | 8/27/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect final attic insulation in D-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Other | 7/25/2007 | 7/31/2007 | 7/31/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect D-wing T-bar ceiling 1st floor - see Dale first. Thanks Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 7/2/2007 | 7/3/2007 | 7/3/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect sheetrock nailing in D-wing 3rd floor completed units. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 6/28/2007 | 6/28/2007 | 6/28/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 3rd floor D-wing sheetrock. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Energy code compliance | 6/25/2007 | 6/26/2007 | 6/26/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect D-wing 3rd floor insulation. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Energy code compliance | 6/25/2007 | 6/25/2007 | 6/25/2007 | P | CANC |
Jim Sly
|
|
|
Please inspect insulation on 3rd floor of D-wing. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 6/13/2007 | 6/13/2007 | 6/13/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 1st layer sheetrock nailing on 3rd floor of D-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Conference | 6/12/2007 | 6/12/2007 | 6/12/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect nailing in completed units on 2nd floor of D-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Energy code compliance | 6/8/2007 | 6/8/2007 | 6/8/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect insulation on 2nd floor of D-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 6/6/2007 | 6/7/2007 | 6/7/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect first layer lids and structural shear walls on 2nd floor of D-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 6/6/2007 | 6/7/2007 | 6/7/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect completed units on 1st floor of D-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart Shear walls, flr/ceil. assemb, and all drywall OK in units..... 1st flr "D" wing.
|
BLD-Wall cover | 5/30/2007 | 5/31/2007 | 5/31/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect 1st floor D-wing sheetrock: 1st layer lids and structural shear walls - see John Coe. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 5/29/2007 | 5/30/2007 | 5/31/2007 | A | CANC |
Jim Sly
|
|
|
Please inspect 1st floor D-wing sheetrock: 1st layer lids and structural shear walls - see John Coe. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Energy code compliance | 5/23/2007 | 5/24/2007 | 5/24/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 1st floor D-wing insulation. Thanks Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Framing/Rough-in | 5/17/2007 | 5/18/2007 | 5/18/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 1st floor D-wing fire-caulking. Thanks! Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Conference | 4/12/2007 | 4/12/2007 | 4/12/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect shear nailing in D-wing (metal). Anytime today is fine. Tahnks. Phone #: ###-####
|
BLD-Framing/Rough-in | 4/11/2007 | 4/12/2007 | 4/12/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect D-wing (metal) 3rd floor framing and trusses around 9 or 10 am if possible. See Brad w/ Lombac. Thanks! Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2007 | 2/22/2007 | 2/22/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect 2nd floor framing in D-wing. Thanks. Phone #: ###-####
|
BLD-Conference | 2/20/2007 | 2/21/2007 | 2/21/2007 | A | PART |
Jim Sly
|
|
|
Please inspect 2nd floor D-wing framing. Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 2/8/2007 | 2/9/2007 | 2/9/2007 | P | PART |
Jim Sly
|
|
|
Please inspect D-wing steel stairs - Dale will walk inspection with you. Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 2/6/2007 | 2/7/2007 | 2/7/2007 | P | PART |
Jim Sly
|
|
|
Please inspect walls and trusses at MDP Room in PM near D-wing. Thanks. Phone #: ###-#### OK
|
BLD-Framing/Rough-in | 2/5/2007 | 2/6/2007 | 2/6/2007 | P | PART |
Jim Sly
|
|
|
Please inspect pandeck screwing at metal D-wing. Thank you. Phone #: ###-#### OK
|
Plan resubmittals received | | | 1/26/2007 | | |
|
|
|
ok to log in as resubmittls per Dan Stuart; Received 2 copies of pg 1 of 1 Roof Truss Layout and 2 copies of truss drawing package from Gem State Truss; taken to Dan Stuart
|
BLD-Footing | 1/12/2007 | 1/16/2007 | 1/16/2007 | A | PART |
Jim Sly
|
|
|
Please inspect footings for MDP room (near D-wing) as early as possible on Tuesday. Thanks! Phone #: ###-#### OK pend special insp MTI
|
BLD-Framing/Rough-in | 1/10/2007 | 1/10/2007 | 1/10/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect rest of 1st floor D-wing (metal framed wing) in PM. Phone #: ###-####
|
BLD-Framing/Rough-in | 1/8/2007 | 1/10/2007 | 1/9/2007 | P | NH |
Jim Sly
|
|
|
Please inspect the rest of D-wing 1st floor framing (metal framed wing). Thank you. Phone #: ###-#### Could not find John at jobsite.
|
BLD-Concrete | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect wire mesh on 2nd floor D-wing pandeck. Thank you. Phone #: ###-####
|
BLD-Framing/Rough-in | 12/29/2006 | 1/2/2007 | 1/2/2007 | P | PASS |
Tony Young
|
|
|
Please inspect screwing at pandeck in the D-wing. Thanks and Happy New Year.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Framing/Rough-in | 12/15/2006 | 12/15/2006 | 12/15/2006 | P | PART |
Jim Sly
|
|
|
Please inspect pandeck screwing at D-wing today. This morning would work too...sorry about late notice. Thanks Jim!; Phone #: ###-#### Internet Inspection Request from: Dale Shuart East 1/3 D wing pan deck fastening OK.
|
BLD-Framing/Rough-in | 12/5/2006 | 12/7/2006 | 12/7/2006 | P | PART |
Jim Sly
|
|
|
Please inspect screwing of 2nd floor pandeck at D-wing (metal framed wing). Thanks. ; Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK
|
BLD-Framing/Rough-in | 11/10/2006 | 11/13/2006 | 11/13/2006 | A | PART |
Jim Sly
|
|
|
Please inspect framing on 1st floor of D-wing (metal framed) to L-line. ; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Other | 10/31/2006 | 11/1/2006 | 11/1/2006 | A | DONE |
Jim Sly
|
|
|
Please meet John Woods for consultation on D-wing (metal frame) in morning if possible). Thanks; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Foundation | 10/9/2006 | 10/11/2006 | 10/11/2006 | A | PART |
Jim Sly
|
|
|
Please inspect rebar at D-wing in AM. Thanks.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK pending MTI special insp, tests and approals.
|
BLD-Footing | 9/20/2006 | 9/21/2006 | 9/21/2006 | A | PART |
Jim Sly
|
|
|
Please inspect D-wing elevator floor in morning. ; Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK Pending MTI special insp, tests and approvals.
|
BLD-Footing | 9/14/2006 | 9/15/2006 | 9/15/2006 | P | PART |
Jim Sly
|
|
|
Please inspect footings for D-wing during PM.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK Pending MTI special insp tests and approvals
|
(F) Reprint permit | | | 9/1/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 8/18/2006 | | 8/31/2006 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/31/2006 | | 8/31/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/31/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/31/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/31/2006 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 3/10/2006 | | 8/31/2006 | | PASS |
|
|
|
8/31/2006 10:57:08 MYS - activity updated through activity BLDA022 from case BLD06-00579.
|
Routing - FIRE | 8/15/2006 | | 8/18/2006 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLANNING | 8/14/2006 | | 8/15/2006 | | PASS |
|
|
|
Susan Riggs ok of CUP passed to Sara Schfer for DR
|
Telephone call | | | 8/15/2006 | | DONE |
|
|
|
Had phone conference call with Larry, architect representative, and Jason Tarkowsky, owner, and Ben Settecase, owner. Jenifer Gilliland and Marlene Southard were present with me as we reviewed the plan review comments still needing to be addressed for this project.
|
Routing - PLANNING | 8/15/2006 | | 8/15/2006 | | PASS |
|
|
|
Approved per DRH05-00320 Modification #2.
|
Routing Off Site - STRUCTURAL | 8/2/2006 | | 8/14/2006 | | PASS |
|
|
|
Called Action Courier 8/2/06 @ 10:00am BAS
8/14/06 received Fax from structural engineer approving structural plans.
|
Routing - PLUMBING | 8/9/2006 | | 8/14/2006 | | FAIL |
|
|
|
use boise city approved grease interceptor detail, attached. Plumbing and civil drawings do not match for grease interceptor piping or the building drain/ building sewer sizing for area "A". all food prep and warewashing sinks and equipment must be indirectly drained. upper terminal cleanouts from 1st. review have not been addressed.
|
Routing - PUBLIC WORKS | 8/9/2006 | | 8/9/2006 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 8/8/2006 | | DONE |
|
|
|
Copy of plan review items e-mailed and faxed to greg elmore.
|
Routing - PLAN CHECK | 5/22/2006 | | 8/8/2006 | | FAIL |
|
|
|
Plan resubmittals provided were incorrect or incomplete. Items of first plan review conditions not answered were redone to clarify wherein they failed and some new items brought about by changes made to the plans were also identified. Copy of review e-mailed and faxed to architect. Routing to plumbing for re-review then fire code analyst.
|
Plan Reviewer's activity | | | 8/1/2006 | | DONE |
|
|
|
Received copy of engineering response from Mat Gralund, BMGP in response to outsource third party structural review report of 3/29/06. Routing new plans and calcs to permit desk to route to Keith Jones for re-review.
|
Plan resubmittals received | | | 7/28/2006 | | |
|
|
|
Received 3 copies of the following sheets--A1.1B, A1.1C, A1.2, A1.3, A2.1, A2.1A, A2.1B, A2.1DF, A2.2, A2.2A, A2.2B, A2.2D, A2.3, A2.3A, A2.3B, A2.3D, A2.4, A3.1, A3.2, A3.3, A4.1, A4.2, A4.3, A5.1, A6.1, A6.2, A6.3, A7.1, A8.1, A8.2, A8.3, A9.1, A9.2, S0.1, S1.1A, S1.1B, S1.1C, S1.1D, S2.1A, S2.1B, S2.1C, S2.1D, S2.2A, S2.2B, S2.2C, S2.2D, S2.3A, S2.3B, S2.3C, S2.3D, S2.4, S3.1, S3.2, S5.1, S5.2, S6.1, S7.1, S7.2, S8.1, S8.2, S8.3, S8.4, S8.5, S9.1, M2.1, M2.1A, M2.1B, M2.1C, M2.2, M2.2A, M2.2B, M2.2C, M2.3, M2.3A, M2.3B, M2.3C, M2.4, M2.4A, M2.4B, M2.4C, M3.1, M3.2, M4.1, M4.2, M5.1, M5.2, P1.0, P1.1, P1.3, P1.4, P2.1, P2.2, P2.3, P2.4, P3.1, P3.2, P3.3, P3.4, P4.1, P4.2, P4.3, P4.4, P5.1, P6.1, P6.2, HOOD PERMIT DRAWING,1 set of revised structure calcs, 2 copies of Plan review response letter and taken to Dan stuart
|
Plan resubmittals received | | | 6/23/2006 | | DONE |
|
|
|
Received 1 transmittal , & 2 copys of sheets C1,C2,L2.1,L2.3 taken to Dan S.
|
Routing - PLANNING | 6/20/2006 | | 6/20/2006 | | FAIL |
|
|
|
Failed for lack of landscape plan, site plan of entire develiopment and x-access agreement.
|
1st review completed | | | 5/22/2006 | | FAIL |
|
|
|
Failed Plan Check and Fire.
|
Routing - FIRE | 5/11/2006 | | 5/22/2006 | | FAIL |
|
|
|
Attached review comments to plans.Faxed resubmittal items to architect.
|
Routing - PLAN CHECK | 4/12/2006 | | 5/2/2006 | | FAIL |
|
|
|
Dan Stuart Copy of plan review report faxed and e-mailed to architect of record, Greg Elmore. Will route to fire code analyst when residential units have been reviewed all part of same plan submittals.
|
Plan resubmittals requested | | | 5/2/2006 | | DONE |
|
|
|
By e-mail & fax to architect.
|
Routing - PLANNING Land Div | 4/14/2006 | | 4/14/2006 | | PASS |
|
|
|
Plat has been recorded.
|
Routing - PLANNING | 4/11/2006 | | 4/12/2006 | | FAIL |
|
|
|
Marty S. DRH05-00320 Landscape plan needs to be reworked a little. There need to be shrubs added to the parking lot planters and the evergreen trees especially the Austrian Pines along Willowcliff need to have a wider spacing approximately 15'-20'.
Susan R. CUP05-00028
|
Routing - PLUMBING | 3/27/2006 | | 4/11/2006 | | FAIL |
Lee Rice
|
|
|
Several corrections requiring resubmittal....faxed copy of review to architect.
|
Routing Off Site - STRUCTURAL | 3/10/2006 | | 3/29/2006 | | FAIL |
|
|
|
Called action Courrier for Pick up @2:20 BAS
3/29/06 Received report of structural review by third party contract structural firm. Corrections & resubmittals are required. Faxed a copy of plan review with cover letter to Greg Elmore, architect of record, for required response.
|
Routing - Erosion and Sediment | 3/22/2006 | | 3/27/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions. 3/27/06 Refer to ESC06-00325 as master plan for project, RP must be determined before permit is issued. adh.
|
Routing - PUBLIC WORKS | 3/15/2006 | | 3/22/2006 | | FAIL |
|
|
|
Eliminate disposer(s) in kitchen. 3100 gallon grease interceptor/a typical volume/potentially to large; Need to show UPC sizing calculation; If volume prescription is correct, install two 1500 gallon interceptors; an interceptor this size will require odor control assessment. Contact Mike Hunter ###-####
|
Routing - PLANNING Land Div | 3/10/2006 | | 3/15/2006 | | PEND |
|
|
|
Do not issue Building Permit until the Final Plat has been recorded at the County. The City Engineer signed the Final Plat in Dec. 2005.
|
Plans ACCEPTED BY PLAN TECH | | | 3/10/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/10/2006 | | |
|
|
|
|
Application received | | | 3/10/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/10/2006 | | |
|
|
|
|
Third Notice BLD | 10/30/2007 | 10/30/2007 | | | |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 3/10/2006 | 3/10/2006 | | | |
|
|
|
|