(F) Reprint permit | | | 11/28/2007 | | |
|
|
|
|
Second Notice BLD | 10/17/2007 | 10/17/2007 | 10/30/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/3/2007 | 10/17/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/2/2007 | 10/2/2007 | 10/3/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
Permanent Occupancy | | | 10/3/2007 | | DONE |
|
|
|
|
BLD-Final | 10/2/2007 | 10/2/2007 | 10/2/2007 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK for Perm Occ.
|
Code Occupancy Approval | 9/7/2007 | 9/7/2007 | 9/7/2007 | A | PASS |
Carol Montgomery
|
|
|
|
Code Occupancy Approval Temp | 9/5/2007 | 9/5/2007 | 9/5/2007 | A | FAIL |
Carol Montgomery
|
|
|
Made inspection of site on 9-4-2007. Still have a small amount of hydroseeding to do and the remainder of the landscaping (incl. undergrd. sprinkle system) at the sw corner of the project. There is a $9,400.00 Bond in place so I am signing off on temporary(s)
|
Code Occupancy Approval | 9/5/2007 | 9/4/2007 | 9/5/2007 | P | CANC |
Carol Montgomery
|
|
|
|
BLD-Final | 8/31/2007 | 9/4/2007 | 9/4/2007 | P | NR |
Jim Sly
|
|
|
Final for A and B wings. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Conference | 8/31/2007 | 9/4/2007 | 8/31/2007 | A | CANC |
Jim Sly
|
|
|
Final in A and B wings! Phone #: ###-#### Internet Inspection Request from: Dale Shuart Inspection cancelled from web by: Dale Shuart
|
BLD-Energy code compliance | 8/24/2007 | 8/27/2007 | 8/27/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect final attic insulation in A and B wings. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Other | 8/16/2007 | 8/17/2007 | 8/17/2007 | A | PART |
Jim Sly
|
|
|
Please inspect kitchen T-bar ceiling (B-wing). Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart Above ceiling OK.......Need to re-inspect penitrations thru 2hr CMU wall in Kitchen area.
|
BLD-Other | 8/9/2007 | 8/10/2007 | 8/10/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 2nd floor B-wing T-bar ceiling. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Other | 8/3/2007 | 8/7/2007 | 8/7/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect B-wing 1st floor T-bar ceiling. Thanks you. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 7/6/2007 | 7/6/2007 | 7/6/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 1st floor B-wing, sheetrock nailing in completed units. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 7/5/2007 | 7/5/2007 | 7/5/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 1st layer sheetrock nailing on 1st floor of B-wing. Thanks Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 7/2/2007 | 7/3/2007 | 7/3/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect 2nd floor B-wing completed units sheetrock. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Other | 6/28/2007 | 6/29/2007 | 6/29/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 1st and 2nd floor A-wing T-bar ceiling. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Energy code compliance | 6/28/2007 | 6/29/2007 | 6/29/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect 2nd floor B-wing insulation. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 6/28/2007 | 6/28/2007 | 6/28/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 1st layer lids nailing on 2nd floor B-wing. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Framing/Rough-in | 6/25/2007 | 6/26/2007 | 6/26/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect framing on all floors of B-wing - see Dale first. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Framing/Rough-in | 6/25/2007 | 6/25/2007 | 6/25/2007 | P | CANC |
Jim Sly
|
|
|
Please inspect framing on all floors of B-wing - see Dale first. Thanks! Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 6/20/2007 | 6/20/2007 | 6/20/2007 | P | PASS |
Jim Sly
|
|
|
2nd layer sheetrock nailing on 3rd floor B-wing. :) Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 6/19/2007 | 6/19/2007 | 6/19/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 3rd floor B-wing 1st layer sheetrock nailing in completed units - early PM if possible. Thanks Jim. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Energy code compliance | 6/12/2007 | 6/12/2007 | 6/12/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 3rd floor B-wing insulation. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Other | 6/5/2007 | 6/6/2007 | 6/6/2007 | A | NR |
Jim Sly
|
|
|
Please inspect T-bar ceiling grid on all 3 floors of A-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart Need to complete firestopping.
|
BLD-Wall cover | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 3rd floor A-wing sheetrock nailing. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 5/15/2007 | 5/16/2007 | 5/16/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect 3rd floor A-wing 1st layer of sheetrock. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 5/15/2007 | 5/15/2007 | 5/15/2007 | P | CANC |
Jim Sly
|
|
|
Please inspect 3rd floor A-wing 1st layer sheetrock nailing. Thanks! Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Framing/Rough-in | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect framing in B-wing kitchen. Thanks Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Energy code compliance | 4/26/2007 | 4/26/2007 | 4/26/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect A-wing 3rd floor insulation. Thanks! Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Framing/Rough-in | 4/16/2007 | 4/17/2007 | 4/17/2007 | A | PASS |
Jim Sly
|
|
|
Please inspect 3rd floor framing in A-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Wall cover | 4/12/2007 | 4/12/2007 | 4/12/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect nailing on 2nd floor of A-wing in completed units. Anytime today is fine. Thanks. Phone #: ###-####
|
BLD-Wall cover | 4/4/2007 | 4/4/2007 | 4/4/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect 1st layer sheetrock nailing in ceiling on 2nd floor of A-wing. Thanks. Phone #: ###-####
|
BLD-Wall cover | 4/2/2007 | 4/2/2007 | 4/2/2007 | P | PASS |
Jim Sly
|
|
|
Please inspect sheetrock nailing in completed units on 1st floor of A-wing. Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 3/23/2007 | 3/26/2007 | 3/26/2007 | A | PART |
Jim Sly
|
|
|
Please inspect B-wing elevator framing. Thanks. Phone #: ###-#### OK
|
BLD-Wall cover | 3/23/2007 | 3/26/2007 | 3/26/2007 | A | PART |
Jim Sly
|
|
|
Please inspect 1st layer sheetrock nailing on 1st floor of A-wing. Thanks. Phone #: ###-#### OK
|
BLD-Framing/Rough-in | 3/20/2007 | 3/21/2007 | 3/21/2007 | P | CANC |
Jim Sly
|
|
|
Please inspect 2nd floor A-wing. Thanks. Phone #: ###-#### 2nd floor OK to insulate.
|
BLD-Framing/Rough-in | 3/19/2007 | 3/20/2007 | 3/20/2007 | P | PART |
Jim Sly
|
|
|
Please inspect 1st and 2nd floor at A-wing. Thanks. Phone #: ###-#### 1st floor OK to cover
|
BLD-Framing/Rough-in | 3/16/2007 | 3/19/2007 | 3/19/2007 | A | PART |
Jim Sly
|
|
|
Please inspect A-wing framing. Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 3/16/2007 | 3/16/2007 | 3/16/2007 | P | PART |
Jim Sly
|
|
|
Please inspect 2nd and 3rd flooring framing at A-wing. Phone #: ###-#### Partial......recall for insp.
|
BLD-Other | 3/14/2007 | 3/15/2007 | 3/15/2007 | P | PART |
Jim Sly
|
|
|
Please inspect all floors framing in A-wing. Phone #: ###-#### Part
|
BLD-Framing/Rough-in | 3/14/2007 | 3/15/2007 | 3/15/2007 | P | PART |
Jim Sly
|
|
|
Please inspect B-wing sheer. Phone #: ###-#### Part
|
BLD-Other | 3/13/2007 | 3/15/2007 | 3/14/2007 | P | CANC |
Jim Sly
|
|
|
Please inspect all floors framing in A-wing. Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 3/12/2007 | 3/15/2007 | 3/14/2007 | P | CANC |
Jim Sly
|
|
|
Please inspect B-wing sheer. Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 2/26/2007 | 2/27/2007 | 2/27/2007 | A | PART |
Jim Sly
|
|
|
Please inspect roof nailing at B-wing. Thanks. Phone #: ###-#### Roof OK
|
Plan resubmittals received | | | 1/26/2007 | | |
|
|
|
ok to log in as resubmittals per Dan Stuart; The following received for building A: 1 copy of pg 1 of 1 Roof Truss Layout, 2 copies of truss drawing packages from Idaho Truss; The following received for building B: 3 transmittal sheets, 3 copies of pg 1 of 1 roof truss layout, 3 copies of truss drawing packages from Idaho Truss; taken to Dan Stuart
|
BLD-Framing/Rough-in | 1/23/2007 | 1/23/2007 | 1/23/2007 | P | PART |
Jim Sly
|
|
|
Please inspect framing of A-wing elevator (will also need C-wing elevator inspected - I''ll request seperately through C-wing permit). Thanks. Phone #: ###-####
|
BLD-Framing/Rough-in | 12/27/2006 | 12/28/2006 | 12/28/2006 | A | PART |
Jim Sly
|
|
|
Please inspect A-wing roof nailing (partial). Anytime AM or PM.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart Roof nailing OK
|
BLD-Framing/Rough-in | 12/14/2006 | 12/15/2006 | 12/15/2006 | A | PASS |
Jim Sly
|
|
|
Please inspect partial A-wing shear nailing Friday AM sometime. Thanks :); Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK pending special insp (MTI) .
|
BLD-Framing/Rough-in | 12/4/2006 | 12/4/2006 | 12/4/2006 | P | PART |
Jim Sly
|
|
|
Please inspect shear nailing on 1st floor of A-wing this afternoon. Thanks!; Phone #: ###-#### Internet Inspection Request from: Dale Shuart Shear at A wing 1st floor OK....MTI special insp and approval.
|
Additional plans submitted | | | 12/1/2006 | | DONE |
|
|
|
Received two copies of Sheets 1, 2, 3, 4, 5, 6, 7, 8 of 8 showing layout of structural floor framing & beams for second & third floor. These plans were prepared and stamped by an Idaho licensed engineer, Aaron M. Reed and have been reviewed and approved by Matthew Gralund, Project Structural Engineer. Copy of deferred submittal framing joists and beams included in original plans and copy to job site.
|
Additional plans submitted | | | 10/20/2006 | | PASS |
|
|
|
Resubmitted envelope energy code comcheck changing the wall insulation from R21 of original plans to R19. R19 is okay as compliance with IECC is maintained. Copy to inspector, Jim Sly.
|
BLD-Foundation | 10/17/2006 | 10/18/2006 | 10/18/2006 | A | PART |
Jim Sly
|
|
|
Please inspect B-wing rebar Wed. morning. Thanks!; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Footing | 10/3/2006 | 10/4/2006 | 10/4/2006 | A | PART |
Jim Sly
|
|
|
Please inspect elevator shaft in B-wing.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK pend MTI insp, tests and appr.
|
BLD-Footing | 10/2/2006 | 10/2/2006 | 10/2/2006 | P | PART |
Jim Sly
|
|
|
Please inspect column footings at A-wing this afternoon.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Footing | 9/25/2006 | 9/27/2006 | 9/27/2006 | A | PART |
Jim Sly
|
|
|
Please inspect A-wing rebar in AM; Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK pending MTI special insp, tests and approvals.
|
BLD-Footing | 9/21/2006 | 9/22/2006 | 9/22/2006 | A | PART |
Jim Sly
|
|
|
Please inspect 2-hour party wall footings tomorrow AM. Thanks.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart OK pending MTI special insp, tests and approvals.
|
BLD-Concrete | 9/12/2006 | 9/13/2006 | 9/13/2006 | A | PART |
Tony Young
|
|
|
Please inspect structural steel in A-wing elevator tomorrow morning. If at all possible, this afternoon would be best! Thank you.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart special inspector did this one,, ok pending report
|
BLD-Concrete | 9/8/2006 | 9/11/2006 | 9/11/2006 | A | PASS |
Jim Sly
|
|
|
Please inspection elevator structural steel around noon Monday if possible. Thanks; Phone #: ###-#### Internet Inspection Request from: Dale Shuart
|
BLD-Footing | 9/5/2006 | 9/6/2006 | 9/6/2006 | P | PART |
Jim Sly
|
|
|
Please inspect around 2:30 or 3:00 if possible. Thanks.; Phone #: ###-#### Internet Inspection Request from: Dale Shuart Foot OK Pend special insp, tests and appr...
|
(F) Reprint permit | | | 9/1/2006 | | |
|
|
|
|
Plan assigned to (DRS) | 3/10/2006 | | 8/31/2006 | | PASS |
|
|
|
8/31/2006 10:59:16 MYS - activity updated through activity BLDA022 from case BLD06-00582.
|
Routing - PLAN CHECK | 8/18/2006 | | 8/31/2006 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/31/2006 | | 8/31/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/31/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/31/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/31/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 8/31/2006 | | DONE |
|
|
|
|
Routing - FIRE | 8/15/2006 | | 8/18/2006 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Telephone call | | | 8/15/2006 | | DONE |
|
|
|
Had phone conference call with Jason Tarkowsky, Ben Settecase and Larry with Bonaventure Plaza Assisted Living Complex to review each item of plan review conditions still needing to be addressed by design professionals. Jenifer Gilliland and Marlene Southard were with me.
|
Routing - PLANNING | 8/15/2006 | | 8/15/2006 | | PASS |
|
|
|
Approved per DRH05-00320 Modification #2.
|
Routing - PLANNING | 8/14/2006 | | 8/15/2006 | | PASS |
|
|
|
Susan Riggs ok, passed to Sara Schfer for review of DR
|
Routing - PLUMBING | 8/9/2006 | | 8/14/2006 | | FAIL |
|
|
|
see bld06 00579 for review comments.
|
Routing Off Site - STRUCTURAL | 8/2/2006 | | 8/14/2006 | | PASS |
|
|
|
8/2/06 Called Action Courier 8/2/06 @ 10:00am. BAS
8/14/06 - Received structural review approval for this permit.
|
Routing - PUBLIC WORKS | 8/9/2006 | | 8/9/2006 | | PASS |
|
|
|
|
Plan resubmittals requested | | | 8/8/2006 | | DONE |
|
|
|
E-mailed and faxed copy of plan review to Greg elmore.
|
Routing - PLAN CHECK | 5/22/2006 | | 8/8/2006 | | FAIL |
|
|
|
Resubmittals incomplete or incorrect for some of the original plan review comments. Copy of plan review items needing to be addressed were e-mailed and faxed to Greg Elmor. Routing to plumbing.
|
Plan Reviewer's activity | | | 8/1/2006 | | DONE |
|
|
|
Received copy of Matt Gralund engineering response to out outside structural engineers review dated 3/29/06. Routing copy of response, new plans and eng. calcs to Keith Jones. All to permit desk for routing.
|
Plan resubmittals received | | | 7/31/2006 | | |
|
|
|
Received 3 copies of the following sheets--A1.1B, A1.1C, A1.2, A1.3, A2.1, A2.1A, A2.1B, A2.1DF, A2.2, A2.2A, A2.2B, A2.2D, A2.3, A2.3A, A2.3B, A2.3D, A2.4, A3.1, A3.2, A3.3, A4.1, A4.2, A4.3, A5.1, A6.1, A6.2, A6.3, A7.1, A8.1, A8.2, A8.3, A9.1, A9.2, S0.1, S1.1A, S1.1B, S1.1C, S1.1D, S2.1A, S2.1B, S2.1C, S2.1D, S2.2A, S2.2B, S2.2C, S2.2D, S2.3A, S2.3B, S2.3C, S2.3D, S2.4, S3.1, S3.2, S5.1, S5.2, S6.1, S7.1, S7.2, S8.1, S8.2, S8.3, S8.4, S8.5, S9.1, M2.1, M2.1A, M2.1B, M2.1C, M2.2, M2.2A, M2.2B, M2.2C, M2.3, M2.3A, M2.3B, M2.3C, M2.4, M2.4A, M2.4B, M2.4C, M3.1, M3.2, M4.1, M4.2, M5.1, M5.2, P1.0, P1.1, P1.3, P1.4, P2.1, P2.2, P2.3, P2.4, P3.1, P3.2, P3.3, P3.4, P4.1, P4.2, P4.3, P4.4, P5.1, P6.1, P6.2, HOOD PERMIT DRAWING,1 set of revised structure calcs, 2 copies of Plan review response letter and taken to Dan stuart
|
Plan resubmittals received | | | 6/23/2006 | | DONE |
|
|
|
Received 1 transmittal , & 2 copys of sheets C1,C2,L2.1,L2.3 taken to Dan S.
|
1st review completed | | | 5/22/2006 | | FAIL |
|
|
|
Failed Plan Check and Fire
|
Routing - FIRE | 5/11/2006 | | 5/22/2006 | | FAIL |
|
|
|
Faxed resubmittal items to architec. Attached review comment to plans.
|
Routing - PLAN CHECK | 4/12/2006 | | 5/8/2006 | | FAIL |
|
|
|
Dan Stuart Copy of plan review report e-mailed and faxed to architect, Greg Elmore. Will route to fire code analyst when BLD06-01069 plan review is completed. there are three permits with this et of plans. Also BLD06-00579 & BLD06-00582.
|
Plan resubmittals requested | | | 5/8/2006 | | DONE |
|
|
|
Copy of plan review items sent to architect.
|
Routing - PLANNING Land Div | 4/14/2006 | | 4/14/2006 | | PASS |
|
|
|
Plat has been recorded.
|
Routing - PLANNING | 4/11/2006 | | 4/12/2006 | | FAIL |
|
|
|
Marty S. DRH05-00320 - The landscape plans need to be reworked and additional information submitted regarding the fencing. The parking lot islands need to contain shrubs, the evergreen trees, esp. the Austrian Pines, need to be spaced approx. 15'-20' at a minimum.
Susan R. CUP05-00028
|
Routing - PLUMBING | 3/27/2006 | | 4/11/2006 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/10/2006 | | 3/29/2006 | | FAIL |
|
|
|
Called Action Corrier for pick up @ 2:20
#/29/06 - Received copy of structural plan review for this project from third party under contract with city. Correction and resubmittals required. Faxed copy of review report with cover letter to architect of record, Greg Elmore, for his response.
|
Routing - Erosion and Sediment | 3/22/2006 | | 3/27/2006 | | PASS |
|
|
|
3/27/06 Refer to ESC06-00325 as master plan for project, RP must be determined before permit is issued. adh.
|
Routing - PUBLIC WORKS | 3/15/2006 | | 3/22/2006 | | FAIL |
|
|
|
Eliminate disposer(s) in kitchen. 3100 gallon grease interceptor/a typical volume/potentially to large; Need to show UPC sizing calculation; If volume prescription is correct, install two 1500 gallon interceptors; an interceptor this size will require odor control assessment. Contact Mike Hunter ###-####
|
Routing - PLANNING Land Div | 3/10/2006 | | 3/15/2006 | | PEND |
|
|
|
Do not issue the Building Permit until the Final Plat has been recorded at the County. The City Engineer signed the Final Plat in Dec. 2005.
|
Plans ACCEPTED BY PLAN TECH | | | 3/10/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/10/2006 | | |
|
|
|
|
Application received | | | 3/10/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/10/2006 | | |
|
|
|
|
Routing - PLANNING | 6/20/2006 | | 2/20/2006 | | FAIL |
|
|
|
failed for lack of landscape plan, overall site plan of entire development and x-access agreement.
|
Third Notice BLD | 10/30/2007 | 10/30/2007 | | | |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 3/10/2006 | 3/10/2006 | | | |
|
|
|
|