Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00587
StatusFinaled
Name TED MASON COMMERCIAL INC
Site Address 1867 N WILDWOOD AVE
Project NameSTEELWOOD FLEX CONDOS
Customer Number 
ePlanReviewNo
Description
(RCE-117) (LEROY CUSTER - STEELWOOD FLEX CONDOS - BUILDING #2) This building is fire sprinklered for fire flow and for future story increase. To create a 1,412 square foot automobile repair garage within a 5,550 square foot, 1 story building. Work is to include a restroom accessible to the disabled, interior nonbearing walls, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD4/5/20074/5/20074/17/2007 DONE
First Notice has not been responded to.
Telephone call  4/17/2007  
call to paige left msg for someone to call and confirm the fv.
First Notice 3/22/20074/5/2007 DONE
Permanent occupancy  3/22/2007 DONE
Perm. Occ. Cert. # 11494 issued 3-22-07 to LeRoy Custser.
BLD-Final1/25/20071/26/20071/26/2007APASS
DetailsJim Sly
alan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
OK for Perm Occ. :)
FIRE-Final Inspection1/25/20071/26/20071/26/2007APASS
DetailsTroy Cobbley
life safety finaled
Permanent Occupancy 1/26/20071/26/2007 DONE
Details
FIRE-Final Inspection1/24/20071/25/20071/25/2007PFAIL
DetailsTroy Cobbley
No approved plans on site.
FIRE-Alarm Testing1/24/20071/25/20071/25/2007AFAIL
DetailsTroy Cobbley
No approved plans on site.
FIRE-Final Inspection1/23/20071/24/20071/24/2007PCANC
DetailsTroy Cobbley
allen; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Conference1/17/20071/18/20071/18/2007ADONE
DetailsJim Sly
allen; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance10/3/200610/4/200610/4/2006APASS
DetailsJim Sly
Alan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Framing/Rough-in9/29/200610/2/200610/2/2006APASS
DetailsJim Sly
allan; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Conference6/5/20066/6/20066/6/2006APASS
DetailsJim Sly
Phone #: ###-####
Issue PAID IN FULL permit  5/15/2006 DONE
Plan assigned to (CJW)3/20/2006 4/19/2006 PASS
4/19/2006 08:27:55 CJW - activity updated through activity BLDA022 from case BLD06-00587.
PLANS/APPL TAKEN TO FRONT DESK  4/19/2006 DONE
Print Occupancy Form  4/19/2006 DONE
Permit Ready to Issue  4/19/2006 DONE
Telephone call  4/19/2006 DONE
lft vm with elizabeth cooper ###-#### that permit and fees are ready to be picked up
Routing - PLAN CHECK4/17/2006 4/18/2006 DONE
Attached Document  4/18/2006 DONE
Recieved letter from architect stating that no hazardous materials will be stored on site.
Routing - FIRE4/14/2006 4/17/2006 PASS
Attached review comments to plans. Faxed review comments to architect. Awaiting letter verifying that no hazardous materials will be stored onsite.
Routing - PLAN CHECK4/12/2006 4/14/2006 PASS
Drawings approved after resubmittal review
Routing - PUBLIC WORKS4/14/2006 4/14/2006 DONE
Sent back to Public Works for sewer fee re-calculation.
1st review completed  4/12/2006 FAIL
Failed Fire.
Routing - FIRE4/6/2006 4/12/2006 FAIL
Faxed resubmittal item to architect.
Routing - PLANNING4/3/2006 4/6/2006 PASS
The zone is a C-2D zone. In speaking with the applicant's rep, Elizabeth Cooper, I found that this is just a hobbiest location. It can be classified as minor auto repair which is allowed in the zone.
Plan resubmittals received  4/5/2006 DONE
Received 1 project letter, & 2 copys of sheet A2.0 taken to Carl W.
Routing - PLAN CHECK3/22/2006 4/3/2006 FAIL
The IBC plan review was started on March 31, 2006 and was finished on April 3, 2006. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS3/20/2006 3/22/2006 PASS
Pending Assignment by MYS3/10/2006 3/13/2006 DONE
3/13/2006 08:20:08 B_S - activity updated through activity BLDA165 from case BLD06-00587.
Plans ACCEPTED BY PLAN TECH  3/13/2006  
Application received  3/10/2006  
Recd Pcfee & Taken To Pln CK  3/10/2006  
Fee Review-notes3/10/20063/10/2006