BLD-Final | 12/21/2009 | 12/21/2009 | 12/21/2009 | P | FAIL |
Tony Young
|
|
|
status check expired
|
DOC - Permit Expired | 12/21/2009 | 12/21/2009 | 12/21/2009 | P | PASS |
Tony Young
|
|
|
status check,, expired due to limitations
|
BLD-Conference | 12/14/2009 | 12/15/2009 | 12/21/2009 | A | NH |
Tony Young
|
|
|
check on status
|
BLD-Aging Inspection | 12/14/2009 | 12/14/2009 | 12/21/2009 | | PEND |
Tony Young
|
|
|
|
BLD-Final | 9/15/2008 | 9/16/2008 | 9/16/2008 | A | FAIL |
Tony Young
|
|
|
Tom Phone #: ###-#### need stairs and outside hand rail per code
|
BLD-Grading Inspection | 8/26/2008 | 8/26/2008 | 8/26/2008 | P | DONE |
Terry Records
|
|
|
FINAL GRADING AND DRAINAGE APPROVED
|
BLD-Final | 8/1/2008 | 8/4/2008 | 8/4/2008 | A | NR |
Tony Young
|
|
|
Tom Phone #: ###-#### conf only,, need hill side
|
BLD-Energy code compliance | 12/12/2007 | 12/12/2007 | 12/12/2007 | P | PASS |
Tony Young
|
|
|
tom Phone #: ###-#### letter on way per struct engineer,, ok to cover
|
BLD-Framing/Rough-in | 12/11/2007 | 12/12/2007 | 12/12/2007 | A | PART |
Tony Young
|
|
|
tom Phone #: ###-#### ok pending letter
|
BLD-Framing/Rough-in | 11/30/2007 | 12/3/2007 | 12/3/2007 | P | PART |
Tony Young
|
|
|
Tom Phone #: ###-#### still need letter from str. eng,, ok to insulate
|
BLD-Framing/Rough-in | 11/30/2007 | 11/30/2007 | 11/30/2007 | P | FAIL |
Tony Young
|
|
|
Tom Phone #: ###-#### need letter,, justify firewall framing on fur downs,, fireblock soffit and ceiling lines
|
BLD-Conference | 11/20/2007 | 11/21/2007 | 11/21/2007 | A | PART |
Tony Young
|
|
|
tom - 11:00 am apt Phone #: ###-#### frame conf. w/ framers, owner,, need letter from struct engineer for ok as built
|
BLD-Framing/Rough-in | 11/19/2007 | 11/19/2007 | 11/19/2007 | P | PART |
Tony Young
|
|
|
tom Phone #: ###-#### conf only,, need to fix leaks prior to insulation,, finish furr downs,, tighten H/Ds,, need plans,, conf only
|
(F) Reprint permit | | | 10/9/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 10/9/2007 | | DONE |
|
|
|
picked up and paid for modification
|
Plan assigned to (SRZ) | 9/11/2007 | 9/11/2007 | 10/8/2007 | | DONE |
|
|
|
Applicant wanted to update permit with revisions. I spoke with the structural Engineer and he is in the process of reviseing the structural drawings. Plan review Pending structural drawing revisions. (SRZ)
|
Routing - PLAN CHECK | 9/11/2007 | | 10/8/2007 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 10/8/2007 | | |
|
|
|
|
Plan Reviewer's activity | | | 10/8/2007 | | DONE |
|
|
|
Updated permit to reflect changes per approved plans, all red-lining, and Revised Engineering. (SRZ)
|
Case Summary (BLD) | | | 10/8/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/8/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/8/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/8/2007 | | |
|
|
|
Called Tom Dalton (Homes Gone Wild) ###-#### and left voice message that permit is ready and fee, and need to verify who GC is on project
|
Permit Ready to Issue | | | 10/8/2007 | | DONE |
|
|
|
|
Telephone call | | | 10/5/2007 | | DONE |
|
|
|
Applicant called in on a time frame for his plans. Returned call told him Sam will be back on Monday and I would have him call with an ETA.
|
Plan resubmittals received | | | 9/27/2007 | | |
|
|
|
Recieved 4 sets of revised structural calculations and one set of pages S0, S1, S2, S3, S4, S5, S6, S7, S7.1; taken to Sam Z.
|
Telephone call | | | 9/11/2007 | | DONE |
|
|
|
left message with the Applicant. Plan review Pending structural drawing revisions. (SRZ)
|
Plan Reviewer's activity | | | 9/11/2007 | | DONE |
|
|
|
Applicant wanted to update permit with revisions. I spoke with the structural Engineer and he is in the process of reviseing the structural drawings. Plan review Pending structural drawing revisions. (SRZ)
|
Routing - PLAN CHECK | 9/11/2007 | | 9/11/2007 | | PEND |
|
|
|
Applicant wanted to update permit with revisions. I spoke with the structural Engineer and he is in the process of reviseing the structural drawings. Plan review Pending structural drawing revisions. (SRZ)
|
Meeting | | | 8/29/2007 | | DONE |
|
|
|
Per Rita DeYoung ok to change from the general contractor of VP Development to the new parcel owner of Gabe Cardova. Building is in the framing stages at this time///8/29/07 BAS
|
(F) Reprint permit | | | 8/29/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/29/2007 | | DONE |
|
|
|
|
BLD-Conference | 6/21/2007 | 6/22/2007 | 6/22/2007 | A | DONE |
Dave Hannah
|
|
|
GABE nOTE: PLEASE CALL 1/2 HR PRIOR FOR CONFERENCE Phone #: ###-####
|
BLD-Conference | 11/7/2006 | 11/8/2006 | 11/8/2006 | A | PART |
Tony Young
|
|
|
jay ; Phone #: ###-#### - please call 1/2 hr prior to inspection -Internet Inspection Request from: Patricia Smith need to have structural engineer review job as built,, steel, hold downs, etc.
|
BLD-Foundation | 7/6/2006 | 7/6/2006 | 7/6/2006 | P | PART |
Tony Young
|
|
|
jared; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley walls,, wip
|
BLD-Footing | 6/29/2006 | 6/30/2006 | 6/30/2006 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jay Story verbal ok on soils from J. Wylie,, ok to pour
|
PubWorks Subgrade Approval | 6/30/2006 | 6/30/2006 | 6/30/2006 | | DONE |
|
|
|
Received letter from MTI approving footing subgrade.
|
Inspection Record Card- Bld | | | 5/19/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/19/2006 | | |
|
|
|
called ###-#### and told Jay Story that permit is ready and fees
|
Permit Ready to Issue | | | 5/19/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 5/19/2006 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 4/21/2006 | | 5/18/2006 | | PASS |
|
|
|
Approved as Category 3
|
Case Summary (BLD) | | | 5/18/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/18/2006 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 3/14/2006 | | 5/18/2006 | | PASS |
|
|
|
5/18/2006 13:35:11 SAM - activity updated through activity BLDA022 from case BLD06-00607.
|
Routing - PLAN CHECK | 4/20/2006 | | 4/21/2006 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 4/21/2006 | | |
|
|
|
|
Routing - FIRE | 4/14/2006 | | 4/19/2006 | | PASS |
|
|
|
4/17/06-Still awaiting decision from Dave Hanneman on sprinklers.
4/19/06 - No fire sprinklers are required for this house. This house is on a 343' long dead end road without a turnaround, but access around this house will be within 150' of the maximum 150' access point of the FD truck from the intersection of Bodenheimer.
|
Routing - PLAN CHECK | 3/31/2006 | | 4/14/2006 | | FAIL |
|
|
|
Waiting for information from the engineer and architect. Routing to Fire.
|
Plan Reviewer's activity | | | 4/14/2006 | | DONE |
|
|
|
08:12 I called and left Jesse, with Pinnacle, a message to call me. I need to know where some beams locations are and shear walls for the first floor.
08: I called and James Gipson. I need deck construction details.
|
Routing - Erosion and Sediment | 3/23/2006 | | 3/27/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 3/14/2006 | | 3/23/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 3/17/2006 | | 3/17/2006 | | PASS |
|
|
|
parcel created by a Record of Survey
|
Application received | | | 3/14/2006 | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 3/14/2006 | | 3/14/2006 | | FAIL |
|
|
|
Grading plan needs revision
|
Routing - PUBLIC WORKS | 3/14/2006 | | 3/14/2006 | | PASS |
|
|
|
|