Case Summary (BLD) | | | 11/6/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/2/2015 | | DONE |
|
|
|
|
Telephone call | | | 7/20/2007 | | DONE |
|
|
|
lft vm with Carrie at CSDI to get me the final values fax ASAP
|
Telephone call | | | 5/2/2007 | | DONE |
|
|
|
spoke w/ Terri at CSDI and she will get w/ the project manager and get the fv faxed to us.
|
Second Notice BLD | 2/2/2007 | 2/2/2007 | 2/12/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/9/2007 | 2/2/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/9/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11388 issued 1-9-07 to Banner Bank.
|
BLD-Final | 1/5/2007 | 1/8/2007 | 1/8/2007 | A | PASS |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok fo perm occ
|
BLD-Final | 9/14/2006 | 9/15/2006 | 9/15/2006 | P | PART |
Dave Hannah
|
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for temp occ needs to flag locks on entry doors
|
FIRE-Final Inspection | 9/15/2006 | 9/15/2006 | 9/15/2006 | P | PASS |
Forrest France
|
|
|
Items on previous c/n have been verified for completion, visual indicators at the main entry/exit doors to be installed prior to structural final.
|
FIRE-Final Inspection | 9/14/2006 | 9/15/2006 | 9/15/2006 | A | FAIL |
Forrest France
|
|
|
Missing one exit sign as red lined on approved plans, fire extinguishers are not mounted, need to provide signage and flag lock indicator for the keyed locking main entry/exit doors.
|
Temporary occupancy | | | 9/15/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5446 issued 9-15-06 to Banner Bank.
|
BLD-Other | 9/11/2006 | 9/11/2006 | 9/11/2006 | P | PART |
Dave Hannah
|
|
|
michael Note: grid inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover ceiling grid
|
BLD-Wall cover | 7/31/2006 | 8/1/2006 | 8/1/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/31/2006 at 8:19:31 AM. Contact: ###-####.
|
BLD-Wall cover | 7/14/2006 | 7/18/2006 | 7/18/2006 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/14/2006 at 11:53:08 AM. Contact: ###-####.ok to cover wall and hard ceilings
|
Issue PAID IN FULL permit | | | 5/17/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/9/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/9/2006 | | DONE |
|
|
|
tlk to elizabeth cooper ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 5/9/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/19/2006 | | 5/5/2006 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Plan assigned to (CJW) | 3/20/2006 | | 5/5/2006 | | PASS |
|
|
|
5/5/2006 10:05:22 CJW - activity updated through activity BLDA022 from case BLD06-00638.
|
Plan resubmittals received | | | 4/28/2006 | | DONE |
|
|
|
received 1 project letter,1 letter,& 2 copys of sheets A1.0,E1.1 taken to Carl W.
|
1st review completed | | | 4/19/2006 | | FAIL |
|
|
|
Failed Plan Check.
|
Routing - FIRE | 4/17/2006 | | 4/19/2006 | | PASS |
|
|
|
Attached review comments to plans. Faxed review comments to architect.
|
Routing - PLAN CHECK | 4/11/2006 | | 4/17/2006 | | FAIL |
|
|
|
The IBC plan review was started on April 14, 2006 and was finished on April 17, 2006. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 4/10/2006 | | 4/11/2006 | | PASS |
|
|
|
Approved.
|
Routing - PLANNING | 3/28/2006 | | 4/10/2006 | | PASS |
|
|
|
Scott Spjute for conditional use review (CUP04-00019 mod. #2).
3/28/06 Phoned and e-mailed architect Elizabeth Cooper saying that I need to see a plan showing that the conditions of approval have been complied with.
4/10 - passed and on to DR.
|
Routing - PUBLIC WORKS | 3/20/2006 | | 3/22/2006 | | PASS |
|
|
|
|
Pending Assignment by MYS | 3/15/2006 | | 3/16/2006 | | DONE |
|
|
|
3/16/2006 08:19:14 DLD - activity updated through activity BLDA165 from case BLD06-00638.
|
Plans ACCEPTED BY PLAN TECH | | | 3/16/2006 | | |
|
|
|
|
Application received | | | 3/15/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/15/2006 | | |
|
|
|
|
Permanent Occupancy | | 1/8/2006 | 1/8/2006 | | DONE |
|
|
|
|
Permanent Occupancy | | 1/8/2006 | 1/8/2006 | | DONE |
|
|
|
|
Third Notice BLD | 2/12/2007 | 2/12/2007 | | | |
|
|
|
Second Notice has not been responded to.
|
Fee Review-notes | 3/15/2006 | 3/15/2006 | | | |
|
|
|
|