Permit Information
Permit NumberBLD06-00640
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project Name 
Customer NumberC9352
ePlanReviewNo
Description
Micron Building #01X - (C9352) - SOD Reaction Upgrade - To construct interior partitions and install a 6 foot wide door to create a new approximate 60 sq. ft. SOD Mixing Room within the Chem Dock Room #107A. This work also includes excaving a 2 foot wide by 6 foot long trench and installing 6 inch concrete walls and slab floor to create a spill control area within the new SOD Mixing Room. The new room to house optional chemical cabinet for two drums including pumps and circulation system, containment with leak detection, and emergency power off devices on cabinet and exterior of room. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD9/25/20069/25/20061/8/2007 DONE
First Notice has not been responded to.
First Notice9/13/20069/13/20069/25/2006 DONE
DetailsJim Storey
BLD-Final9/12/20069/13/20069/13/2006APASS
DetailsJim Storey
Jim, please call when you are heading this way, I've got 2 small projects to Final. Thanks, Jim Gilmore; Phone #: ###-#### Internet Inspection Request from: Jim Gilmore
DOC - Permit Finaled9/13/20069/13/20069/13/2006PPASS
DetailsJim Storey
BLD-Aging Inspection7/25/20067/25/20068/1/2006 PASS
DetailsJim Storey
PLANS/APPL TAKEN TO FRONT DESK  4/25/2006 DONE
Issue & PRINT to be Invoiced  4/25/2006 DONE
Plan assigned to (JCM)3/17/2006 4/25/2006 PASS
4/25/2006 13:00:30 JCM - activity updated through activity BLDA022 from case BLD06-00640.
Routing - FIRE4/21/2006 4/21/2006 PASS
Plans approved based on explanatory information added to revised sheet A0 indicating room to contain two drums, each under 55-gal cap of IB liquid; does not exceed MAQ's; does not require spill control, containment, ventilation, etc.
Plan Reviewer's activity  3/23/2006 PASS
Reviewed and approved plans for this project. JCM
Routing - FIRE3/23/2006 3/23/2006 FAIL
No further information provided with plans for Fire review. Discussed with Paul Marcolina who will discuss with the Chem div. and have it ready next week.
1st review completed  3/17/2006  
Routing - FIRE3/17/2006 3/16/2006 FAIL
Reviewed 3/16/06 with Facility Chem engineer, Maka Havili. Requested he provide a description of the design basis for the room, since they are calling this an H5 room, but are designing it with H3 features such as mechanical ventilation, sealed floor and sump across door, but the design for the sump and ventilation are not in compliance with IFC requirements for H3 rooms. Will review next week.
Application received  3/15/2006 DONE
This permit was created on the web by Paul Marcolina
Third Notice BLD1/8/20071/8/2007   
Second Notice has not been responded to.
Plan assigned from Web3/15/20063/25/2006