Permit Information
Permit NumberBLD06-00658
StatusFinaled
Name BENCHMARK CONSTRUCTION
Site Address 7425 W SAXTON DR
Project NameSHADOW HILLS SQ RETAIL 7
Customer Number05279
ePlanReviewNo
Description
(Shadow Hills Square Retail Pod 7 - Shell Building) - To construct a new 2,900 square foot, one story, wood framed shell building and related site improvements. All construction per the approved plans. 10/30/06 This permit was modified to add a new 3068 door on the west side of the building and to add a new concrete sidewalk, retaining wall and guardrail along the building from the new west door to the existing south exterior door. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  1/3/2007 DONE
Letter of Compliance issued 1-3-07.
BLD-Final12/29/200612/29/20061/2/2007PPASS
DetailsTony Young
shell and core final along with Tenant Improvement
guard rail is in place now
BLD-Final12/29/200612/29/200612/29/2006ANR
DetailsTony Young
public works guard rail,, verify
BLD-Final12/27/200612/27/200612/29/2006PNR
DetailsTony Young
need to verify the guard rail
BLD-Conference12/20/200612/27/200612/27/2006ACANC
DetailsTony Young
check on guard rail
BLD-Final12/19/200612/20/200612/20/2006APART
DetailsTony Young
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
just needs guard rail by rear side walk,, less than 30" drop off
BLD-Final12/5/200612/5/200612/5/2006PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/5/2006 at 6:29:01 AM. Contact: ###-####.
Need to do all work in body of permit. PW has signed off, but not finaled in computer.
FIRE-Final Inspection11/28/200611/28/200611/28/2006PPASS
DetailsTroy Cobbley
life safety finaled
Code Occupancy Approval11/28/200611/28/200611/28/2006PPASS
DetailsMichael Garner
site inspection complete - officer completed a review of approved conditions and found that compliance has been met - case closed
Code Occupancy Approval11/28/200611/28/200611/28/2006PPASS
DetailsMichael Garner
FIRE-Final Inspection11/16/200611/17/200611/17/2006PFAIL
DetailsTroy Cobbley
No city approved plans on site. No inspection performed.
Telephone call  11/15/2006 DONE
lft vm with joe stoy ###-#### that permit and fees are ready to be picked up
Override - Parcel Holds  11/15/2006  
Override - Parcel Holds  11/15/2006  
Permit Ready to Issue  11/15/2006 DONE
CHANGE STATUS TO (ISS)  11/15/2006 DONE
(F) Reprint permit  11/15/2006 DONE
Plan assigned to (JCM)10/30/200610/30/200611/14/2006 PASS
11/14/2006 08:45:46 JCM - activity updated through activity BLDA022 from case BLD06-00658.
Routing - PUBLIC WORKS11/1/2006 11/14/2006 PASS
Routing - PLAN CHECK11/14/2006 11/14/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  11/14/2006 DONE
Override - Parcel Holds  11/14/2006  
Override - Parcel Holds  11/14/2006  
Inspection Record Card- Bld  11/14/2006 DONE
Routing - PLANNING10/30/2006 11/1/2006 PASS
Plans approved per DRH05-00463 MOD #1 and CUP04-00073.
Plan Reviewer's activity  10/30/2006 PASS
Reviewed and approved plan modification. JCM
Plan Modification Accepted  10/27/2006  
Plan modification accepted in response to Carl Westfall's plan review comments for the MoneyTree TI (BLd06-02350), we have added a new exterior (exit) door at the west elevation. The existing exterior door at the south elevation will serve a public restroom, which in turn will require continuous public acciss to the front of the building. We have added additional sidewalk and guard (railing) (due to the 30"+/- drop adjacent to the retention pond). Please refer to all the following sheets for revised plans and additional details: SD-1 (Arch. Site Plan), A-1 (Floor Plan), A-3 (Elevations, L-1.00 (Landscape Plan), E-2.0 (Electrical Plan). Also recieved 3 copies of 8pg. structural calculations. Routed to John Menard
PubWorks Occupancy Approval9/26/20069/26/20069/26/2006 DONE
Reviewed, ready for acceptance after paving by R. Rokovitz. 09/19/06
Override - Parcel Holds  9/26/2006  
Plan Modification Accepted  9/14/2006  
Plan modification accepted to create an "exterior area of recue assistance" at the south exit door from the employee work area. We are enlarging the exterior concrete landing to accomodate (1) wheelchair, added signage & shifted plant materials to comply with IBC sections 1007.2, exception No. 1, sections 1007.8, 1007.6.1 & 1023.6 (per John Menard waive $500 fee); routed to John Menard
BLD-Energy code compliance8/28/20068/29/20068/29/2006PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/28/2006 at 1:13:15 PM. Contact: ###-####.
FIRE-Conference7/31/20068/1/20068/1/2006ADONE
DetailsForrest France
Confrence with GC to discuss building addressing (number size, location), core and shell life safety requirements, and fire lane marking.
BLD-Framing/Rough-in7/26/20067/26/20067/26/2006PPASS
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in7/25/20067/26/20067/26/2006ACANC
DetailsTony Young
Scheduled by a contractor via Hello! on 7/25/2006 at 11:26:32 AM. Contact: ###-####.
out of time,, rescheduled for pm
BLD-Foundation7/13/20067/14/20067/14/2006APART
DetailsTony Young
Scheduled by a contractor via Hello! on 7/13/2006 at 9:24:59 AM. Contact: ###-####.
masonary on trash enclosure
BLD-Framing/Rough-in6/16/20066/19/20066/19/2006APART
DetailsTony Young
larry; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
exterior ok to cover
BLD-Foundation5/12/20065/15/20065/15/2006APART
DetailsTony Young
larry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
pending s. i. report,, also need ok on redi-rod for hold downs .vs. simpson hold down bolts
Override - Parcel Holds1/1/19001/1/19005/12/2006  
BLD-Footing5/9/20065/10/20065/10/2006APART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
ok pending s. i. report
(F) Reprint permit  4/24/2006  
Issue PAID IN FULL permit  4/21/2006 DONE
Plan assigned to (JCM)3/17/2006 4/6/2006 PASS
4/6/2006 08:28:15 JCM - activity updated through activity BLDA022 from case BLD06-00658.
Routing - PLAN CHECK4/4/2006 4/6/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  4/6/2006 DONE
Inspection Record Card- Bld  4/6/2006  
Permit Ready to Issue  4/6/2006 DONE
Telephone call  4/6/2006 DONE
called ###-#### and left voicemessage for Doug Racine that permit is ready, fees, need GC, RCE, RP, ACHD
Routing - FIRE4/1/2006 4/4/2006 PASS
Attached review comments to plans. Faxed review comments to architect.
1st review completed  4/4/2006 PASS
Plan Reviewer's activity  4/1/2006 PASS
Reviewed and approved as submiited with red lined notes. This review is for structural and nonstructural building requirements. JCM
Routing - PLAN CHECK3/30/2006 4/1/2006 PASS
John M.
Routing - PLANNING3/30/2006 3/30/2006 PASS
Approved.
Routing - PLANNING3/28/2006 3/30/2006 PASS

(Plans placed in office during vacation despite informational signage...)
cup04-00073 Angela W.
Routing - PLUMBING3/23/2006 3/28/2006 PASS
per plans and 2003 upc
Routing - Erosion and Sediment3/23/2006 3/23/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS3/20/2006 3/23/2006 PASS
Routing - PLANNING Land Div3/17/2006 3/20/2006 PASS
property is a platted lot.
Plans ACCEPTED BY PLAN TECH  3/17/2006  
Plan routing begun/NEW & ADDTN  3/17/2006  
Application received  3/17/2006  
Recd Pcfee & Taken To Pln CK  3/17/2006  
Fee Review-notes3/17/20063/17/2006