Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00688
StatusFinaled
Name HANSEN-RICE INC
Site Address 3501 W ELDER ST
Project NameUNA MAS BLDG
Customer Number 
ePlanReviewNo
Description
(Hansen-Rice Inc. RCE-15057) Una Mas Office Shell & Core Building - To construct a 50,280 square foot, three story office building with a 17,420 square foot basement and related site improvements. This building is constructed of a concrete basement, steel structural frame with steel stud exterior walls, metal deck and concrete floors and metal roof deck. The basement contains 27 parking spaces, 14 varying sized storage units, restrooms with showers conference room, mechanical room and circulation hallway. The first floor finished core area includes central corridor/lobby, restrooms, phone/data room. This is a shell and core permit only. Separate tenant improvement permits are required to finish this building for occupancy. This building is fully fire sprinklered. The sprinklers are used for one-hour fire-resistive substitution. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD10/1/200710/1/200711/7/2007 DONE
Second Notice has not been responded to.
Fee Review-notes3/20/20063/20/200611/7/2007 DONE
Second Notice BLD9/13/20079/13/200710/1/2007 DONE
First Notice has not been responded to.
First Notice8/29/20078/29/20079/13/2007 DONE
DetailsJim Storey
BLD-Final8/27/20078/28/20078/29/2007APASS
DetailsJim Storey
John; Phone #: ###-#### Internet Inspection Request from: Hattie James
DOC - Permit Finaled8/29/20078/29/20078/29/2007PPASS
DetailsJim Storey
BLD-Conference8/10/20078/13/20078/13/2007APASS
DetailsJim Storey
John, please call 1st; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Final8/3/20078/6/20078/6/2007APART
DetailsJim Storey
john Phone #: ###-#### temp ok/ c/n for ada shower threshold height. basement.
FIRE-Final Inspection8/2/20078/3/20078/3/2007APASS
DetailsForrest France
Shell and core fire life safety final inspection passed.
FIRE-Final Inspection8/1/20078/2/20078/2/2007PFAIL
DetailsForrest France
Still missing EM lighting at the east stairway.
FIRE-Final Inspection7/31/20078/1/20078/1/2007AFAIL
DetailsForrest France
Missing one exit sign on the first floor per approved plans, need to repair non-functional emergency lighting at the east stairway (all levels) and five lights on the first floor common corridor.
FIRE-Final Inspection7/30/20077/31/20077/31/2007ANR
DetailsForrest France
Still pending related FA and FS permit finals.
FIRE-Final Inspection7/27/20077/30/20077/30/2007ANR
DetailsForrest France
Still need fire alarm and sprinkler permit finals prior to life safety final.
FIRE-Final Inspection7/25/20077/26/20077/26/2007ANR
DetailsForrest France
Need project related fire alarm and fire sprinkler permits finaled before life safety final inspection and approval.
FIRE-Final Inspection7/20/20077/25/20077/25/2007ACANC
DetailsForrest France
No time available to complete inspection.
BLD-Framing/Rough-in7/10/20077/11/20077/11/2007APASS
DetailsJim Storey
jonathon - corn shell insp; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Conference7/5/20077/6/20077/6/2007ANR
DetailsJim Storey
john Phone #: ###-####
BLD-Conference7/3/20077/5/20077/6/2007ANR
DetailsJim Storey
john Phone #: ###-####
BLD-Conference6/29/20077/2/20077/2/2007ADONE
DetailsJim Sly
john; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
Talked to Jon on phone.......We still need UL listing for rated shafts that have been compromised by demo, so we can determine the proper method of fix or repair.
BLD-Conference6/28/20076/29/20076/29/2007ACANC
DetailsJim Sly
tom Phone #: ###-####
Met with Jon (Hansen Rice)....He had questions as to what we want to look at, and when we want to look at it, in areas demo'd / re-installation of materials. Areas involve restroom ceilings, and rated HVAC shafts. Need UL listing for shaft (design) prior to next inspection.
Code Occupancy Approval6/8/20076/8/20076/8/2007PPASS
DetailsDena Gambrel
PubWorks Occupancy Approval5/30/20075/30/20075/30/2007 DONE
Code Occupancy Approval5/24/20075/24/20075/24/2007PFAIL
DetailsDena Gambrel
5-24-07 11:00 Met Rick on location. Fill in work on paving needs to be done. Crew on site working on it and he will call me when done.
BLD-Conference5/7/20075/8/20075/8/2007APASS
DetailsJim Storey
johnathan; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Conference4/24/20074/25/20074/25/2007APASS
DetailsJim Storey
johnathon; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in4/11/20074/12/20074/12/2007APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/11/2007 at 8:04:41 AM. fire stopping east west stairs/ shaft protection/ firedamper access lables
BLD-Conference4/4/20074/5/20074/5/2007APASS
DetailsJim Storey
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall fireprooffing aplcation ok.
BLD-Framing/Rough-in3/27/20073/28/20073/28/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/27/2007 at 1:50:40 PM. Contact: ###-####.1 thur 3 2 hr stair encloser ok for cover.
BLD-Framing/Rough-in3/20/20073/21/20073/21/2007APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/20/2007 at 1:17:52 PM. Contact: ###-####.2hr const. in progess to rate center stair encloser interior gyp and penatations complet.
BLD-Conference3/13/20073/14/20073/14/2007APASS
DetailsJim Storey
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall confrance on assemblies to rate stair 2hr/ what the floor fireprooffing 2 hr will be required.
BLD-Framing/Rough-in3/5/20073/6/20073/6/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 3/5/2007 at 7:19:40 AM. Contact: ###-####.north and south canopys ok to cover.
BLD-Conference2/21/20072/22/20072/22/2007APART
DetailsJim Storey
rick - craig w/ lambaugh has been calling re same thing.; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in1/25/20071/26/20071/26/2007APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 1/25/2007 at 4:50:33 PM. Contact: ###-####.
FIRE-Conference1/16/20071/17/20071/17/2007PDONE
DetailsForrest France
On site discussion regarding floor control valve manifold locations and accessibility requirements, also discussed duct detectors and bld fire code review notes.
FIRE-Conference1/9/20071/16/20071/16/2007PDEFR
DetailsForrest France
To be completed on 1/17 as agreed per telecon.
BLD-Framing/Rough-in12/27/200612/28/200612/28/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/27/2006 at 12:39:46 PM. Contact: ###-####. basement first floor ok
BLD-Other12/16/200612/18/200612/18/2006APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/16/2006 at 7:37:22 AM. fire proofing patched ok
BLD-Framing/Rough-in11/28/200611/29/200611/29/2006APART
DetailsJim Storey
jr; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles prep for fireproofing to maintane elavator rating of structral members in shaft/ si pending.
BLD-Framing/Rough-in10/18/200610/19/200610/20/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/18/2006 at 4:48:51 PM. Contact: ###-####.
BLD-Concrete10/17/200610/19/200610/19/2006PPASS
DetailsJim Storey
j.r.; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Aging Inspection10/4/200610/4/200610/5/2006 PASS
DetailsJim Storey
wip
BLD-Foundation7/28/20068/1/20068/1/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/28/2006 at 3:30:15 PM. Contact: ###-####.placed with special insp.
BLD-Footing6/30/20067/3/20067/3/2006APART
DetailsJim Sly
jr; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
Footing Pour.......Special inspector on site (MTI) Partial footings OK pend special insp tests and approvals.
BLD-Footing6/29/20066/30/20066/30/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/29/2006 at 10:09:39 AM. Contact: ###-####. needs spec inspection call strut engineer ok to pour after spec inspection sign off
(F) Reprint permit  6/26/2006  
Issue PAID IN FULL permit  6/23/2006 DONE
Inspection Record Card- Bld  6/5/2006 DONE
Telephone call  6/5/2006 DONE
called ###-#### and left voicemessage for Glen Walker that permit is ready, fee, need RCE, RP, ACHD
Permit Ready to Issue  6/5/2006  
Plan resubmittals received  6/2/2006 DONE
Received 1 transmittal letter, 1 plan review comments, & 2 copys of sheets T0.01,A1.00,A1.01,A1.04,A1.06 taken to John M.
Routing - PLANNING6/2/2006 6/2/2006 PASS
Plan Reviewer's activity  6/2/2006 PASS
Reviewed and approved plan resubmittals. JCM
Routing - PLAN CHECK6/2/2006 6/2/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/2/2006 DONE
Routing - PLANNING Land Div3/21/2006 6/2/2006 PASS
Initally failed for the following: Must complete a one time lot split prior to issuance of a Building Permit. Lot Line Adjustment submitted, however the property is only one lot. As such, a one time lot split application must be submitted. In addition, the submitted site plan shows pavement for an service drive located on the proposed parcel identified as phase II of the project. The site plan must either be revised to show all required service drives located on phase I or a cross access easement between the two parcels.
Plan assigned to (JCM)3/21/2006 6/2/2006 PASS
6/2/2006 15:27:19 JCM - activity updated through activity BLDA022 from case BLD06-00688.
Routing - PLANNING5/31/2006 6/1/2006  
Applicant has submitted the cross access agreement and has met the requirements of DR. ANT
Routing - PLAN CHECK5/22/2006 5/31/2006 FAIL
Plan resubmittals requested  5/31/2006 DONE
E-mailed the architect a copy of the comment list requesting additional revisions. JCM
Routing - FIRE5/19/2006 5/22/2006 PASS
Attached review comments to plans.
Routing Off Site - STRUCTURAL5/19/2006 5/19/2006 PASS
Reviewed and approved structural resubmittals. JCM
Routing - PLAN CHECK5/9/2006 5/19/2006  
Plan resubmittals received  5/17/2006  
Received 2pg. Transmittal letter to Plan review and 2pg. response, 2 copies of the following: A0.00, A1.00, A1.01, A1.02, A1.03, A1.04, A1.05, A1.06, A3.02, A5.00, A6.02, A7.01, A7.03, A9.00, M2.00, M2.1, E1.02, E1.03, E2.02.; 5pg. Structural plan review response, 2 copies of 11pg. structural calculations, 2 copies of the following: S0.1, S1.1, S1.2, S2.1, S2.2, S2.3, S3.1, S4.1, G2.01, D1.4.; One pg. Fire response, 1 transmittal letter to fire review, 2 more copies of A1.00, 2 more copies of A1.02, all taken to John M.
Routing - PLANNING5/3/2006 5/4/2006 FAIL
plans are ok, called applicant and told him that condition #4 of CUP required a cross access agreement. I will pass plans onto DR and wait for cross access agreement before I sign off. Susan riggs
Applicant needs to submit a cross access agreement prior to issuance of a building permit per the DR requirement. ANT
Routing - PUBLIC WORKS5/1/2006 5/3/2006 PASS
Routing - PLAN CHECK4/27/2006 5/1/2006  
Brian M, needed to see this set of plans as well as the Grading & Drainage plans. this set of plans will route back to John M when Brian M gets done./// DLD
1st review completed  4/27/2006 FAIL
Failed Plan Check, Planning, FIre.
Routing - FIRE4/25/2006 4/27/2006 FAIL
Faxed review comments to architec. Inserted review comments into plans.
Plan resubmittals requested  4/26/2006 DONE
E-mailed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLUMBING4/26/2006 4/26/2006 PASS
PER PLANS AND 2003 UPC
Plan resubmittals requested  4/25/2006 DONE
E-mailed the architect a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK3/30/2006 4/25/2006 FAIL
Plan resubmittals received  4/19/2006 DONE
Received 1 transmittal letter, 1 comment letter, & 2 copys of sheets P1.2,P2.0,P2.1,P2.2,P2.3 put with main plans and taken to John M.
Routing Off Site - STRUCTURAL3/21/2006 4/3/2006 FAIL
Called Action Courrier for pick up @ 3:05on 3/21/06 BAS - Received an e-mailed comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLANNING3/28/2006 3/30/2006 FAIL
DRH05-00346 Sara S. - A copy of a recorded access agreement has not been submitted. When I spoke with Glenn Walker he stated that this was all still one parcel. I asked that the applicant submit this information in writing and to let us know where they are at in the process of splitting the lot. This is a requirement of the CUP as well so I am passing the documents along to the next person.

CUP05-00149 Susan R.
Routing - PLUMBING3/27/2006 3/28/2006 FAIL
riser diagram shows two sets of future risers, are they to be installed at this time? if so where? provide a plan showing site sewer. trap and vent parking garage floor drainage fixtures. 3" on riser diagram is too small for fixtures. flammable liquids interceptor vapor compartment vent may not tie to other vents.
Routing - Erosion and Sediment3/24/2006 3/27/2006 FAIL
ESC plan failed. No ESC application or narrative included with submittal. Notified PD.
Routing - Erosion and Sediment3/27/2006 3/27/2006 PASS
3/27/06 Refer to ESC06-00386 as master ESC plan for project. adh.
Routing - PUBLIC WORKS3/22/2006 3/24/2006 FAIL
Revisions and variance required: Contact Brian Murphy ###-####
Plans ACCEPTED BY PLAN TECH  3/21/2006  
Application received  3/20/2006  
Recd Pcfee & Taken To Pln CK  3/20/2006