Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD06-00690
StatusFinaled
Name UNIVERSITY STREET PROPERTIES VII LL
Site Address 101 S CAPITOL BLVD
Project NameUS BANK-18TH FLR
Customer Number 
ePlanReviewNo
Description
(Vanilla Finish- US Bank-18th floor) To remodel a 2419 sq ft office space located on the 18th floor for future office tenant per approved plans. NO OCCUPANCY ALLOWED UNDER THIS PERMIT. Work to include, removal of nonbearing partitions, construction of approximately 25 lf of new noncombustible partitions to create new breakroom, relocation of two existing doors, installation of new counters and new sink, miscelaneous related finishes. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA #13 as regulated by the fire department. RmH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013 DONE
Third Notice BLD8/18/20068/18/20064/23/2007 DONE
Second Notice has not been responded to.
Telephone call  4/5/2007 DONE
call to martin hale w/ CSHQA Architects, told him that the gc sent a statement that they are not responsible for the fv, hale rqsted that I fax him the statement from the gc and he will get w/ them and get the fv and fax the completed cert back to us. done
Second Notice BLD7/7/20067/7/20068/18/2006 DONE
First Notice has not been responded to.
First Notice5/22/20065/22/20067/7/2006 DONE
DetailsDave Hannah
BLD-Final5/19/20065/22/20065/22/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/19/2006 at 1:18:35 PM. Contact: ###-####.
DOC - Permit Finaled5/22/20065/22/20065/22/2006PPASS
DetailsDave Hannah
Letter of compliance  5/22/2006 DONE
Letter of Compliancer issued 5-22-06
FIRE-Final Inspection5/12/20065/15/20065/16/2006PPASS
DetailsForrest France
Fire life safety is acceptable, related alarm work is complete, no sprinkler modifications required.
FIRE-Final Inspection5/9/20065/10/20065/10/2006AFAIL
DetailsForrest France
The project related fire alarm permit must be requested for field inspection and finaled prior to BLD permit life safety final inspection.
FIRE-Sprinkler Rough-in5/5/20065/8/20065/8/2006ACANC
DetailsTroy Cobbley
Contractor wanted an inspector to walk the project and tell them if any sprinkler heads are overspaced. I told him that I could not do this and that he would need to contact a fire sprinkler contractor to verify sprinkler spacing prior to inspection
BLD-Framing/Rough-in4/21/20064/24/20064/24/2006PPASS
DetailsDave Hannah
Please call first ###-#### Scheduled by a contractor via Hello! on 4/21/2006 at 7:23:04 AM. Contact: ###-####.
(F) Reprint permit  4/11/2006 DONE
(F) Reprint permit  4/11/2006 DONE
Permit Ready to Issue  3/24/2006 DONE
Telephone call  3/24/2006  
called ###-#### and left voicemessage for Martin Hale that permit is ready, fee and need GC & RCE
Issue PAID IN FULL permit  3/24/2006  
Plan assigned to (R_H)3/21/20063/21/20063/23/2006 PASS
3/23/2006 16:05:13 RMH - activity updated through activity BLDA022 from case BLD06-00690.
Plan assigned to (MYS)3/21/20063/21/20063/23/2006 PASS
3/23/2006 16:05:13 RMH - activity updated through activity BLDA022 from case BLD06-00690.
Routing - PLAN CHECK3/21/2006 3/23/2006 PASS
Routing - FIRE3/23/2006 3/23/2006 PASS
Minor remodel / Field Verify
Routing - PUBLIC WORKS3/23/2006 3/23/2006 PASS
Case Summary (BLD)  3/23/2006 DONE
1st review completed  3/23/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/23/2006 DONE
Inspection Record Card- Bld  3/23/2006  
Recd Pcfee & Taken To Pln CK  3/21/2006  
Application received  3/21/2006  
Plans ACCEPTED BY PLAN TECH  3/21/2006  
Fee Review-notes3/21/20063/21/2006