Case Summary (BLD) | | | 7/2/2013 | | DONE |
|
|
|
|
Third Notice BLD | 8/18/2006 | 8/18/2006 | 4/23/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 4/5/2007 | | DONE |
|
|
|
call to martin hale w/ CSHQA Architects, told him that the gc sent a statement that they are not responsible for the fv, hale rqsted that I fax him the statement from the gc and he will get w/ them and get the fv and fax the completed cert back to us. done
|
Second Notice BLD | 7/7/2006 | 7/7/2006 | 8/18/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 5/22/2006 | 5/22/2006 | 7/7/2006 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 5/19/2006 | 5/22/2006 | 5/22/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/19/2006 at 1:18:35 PM. Contact: ###-####.
|
DOC - Permit Finaled | 5/22/2006 | 5/22/2006 | 5/22/2006 | P | PASS |
Dave Hannah
|
|
|
|
Letter of compliance | | | 5/22/2006 | | DONE |
|
|
|
Letter of Compliancer issued 5-22-06
|
FIRE-Final Inspection | 5/12/2006 | 5/15/2006 | 5/16/2006 | P | PASS |
Forrest France
|
|
|
Fire life safety is acceptable, related alarm work is complete, no sprinkler modifications required.
|
FIRE-Final Inspection | 5/9/2006 | 5/10/2006 | 5/10/2006 | A | FAIL |
Forrest France
|
|
|
The project related fire alarm permit must be requested for field inspection and finaled prior to BLD permit life safety final inspection.
|
FIRE-Sprinkler Rough-in | 5/5/2006 | 5/8/2006 | 5/8/2006 | A | CANC |
Troy Cobbley
|
|
|
Contractor wanted an inspector to walk the project and tell them if any sprinkler heads are overspaced. I told him that I could not do this and that he would need to contact a fire sprinkler contractor to verify sprinkler spacing prior to inspection
|
BLD-Framing/Rough-in | 4/21/2006 | 4/24/2006 | 4/24/2006 | P | PASS |
Dave Hannah
|
|
|
Please call first ###-#### Scheduled by a contractor via Hello! on 4/21/2006 at 7:23:04 AM. Contact: ###-####.
|
(F) Reprint permit | | | 4/11/2006 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/11/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/24/2006 | | DONE |
|
|
|
|
Telephone call | | | 3/24/2006 | | |
|
|
|
called ###-#### and left voicemessage for Martin Hale that permit is ready, fee and need GC & RCE
|
Issue PAID IN FULL permit | | | 3/24/2006 | | |
|
|
|
|
Plan assigned to (R_H) | 3/21/2006 | 3/21/2006 | 3/23/2006 | | PASS |
|
|
|
3/23/2006 16:05:13 RMH - activity updated through activity BLDA022 from case BLD06-00690.
|
Plan assigned to (MYS) | 3/21/2006 | 3/21/2006 | 3/23/2006 | | PASS |
|
|
|
3/23/2006 16:05:13 RMH - activity updated through activity BLDA022 from case BLD06-00690.
|
Routing - PLAN CHECK | 3/21/2006 | | 3/23/2006 | | PASS |
|
|
|
|
Routing - FIRE | 3/23/2006 | | 3/23/2006 | | PASS |
|
|
|
Minor remodel / Field Verify
|
Routing - PUBLIC WORKS | 3/23/2006 | | 3/23/2006 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 3/23/2006 | | DONE |
|
|
|
|
1st review completed | | | 3/23/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/23/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/23/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/21/2006 | | |
|
|
|
|
Application received | | | 3/21/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/21/2006 | | |
|
|
|
|
Fee Review-notes | 3/21/2006 | 3/21/2006 | | | |
|
|
|
|