Case Summary (BLD) | | | 3/24/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/24/2015 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/8/2010 | | DONE |
|
|
|
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 8/13/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/18/2008 | 8/11/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 4/18/2008 | | DONE |
|
|
|
|
BLD-Final | 4/16/2008 | 4/17/2008 | 4/17/2008 | A | PASS |
Dave Hannah
|
|
|
Jack; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok for perm occ
|
Temporary Occupancy | 4/2/2008 | 7/1/2008 | 4/2/2008 | | DONE |
Cathy Weisshaupt
|
|
|
|
FIRE-Final Inspection | 3/27/2008 | 3/27/2008 | 3/28/2008 | P | PASS |
Forrest France
|
|
|
Items on correction notice are complete, structrual inspector to verifiy adjusted door closures at apartment units are acceptable, fire life safety finaled.
|
BLD-Final | 3/27/2008 | 3/28/2008 | 3/28/2008 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/27/2008 at 4:42:41 PM. Contact: ###-####. ok for temp
|
BLD-Final | 3/19/2008 | 3/19/2008 | 3/19/2008 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/19/2008 at 9:04:20 AM. Contact: ###-####.
|
FIRE-Final Inspection | 3/19/2008 | 3/19/2008 | 3/19/2008 | P | NR |
Forrest France
|
|
|
Lacking project related fire alarm and sprinkler permit finals, also need to provide or repair some items, see correction list on site.
|
Code Occupancy Approval | | | 3/17/2008 | | DONE |
|
|
|
Landscaping and other exterior work meets plan requirements. One outside step bar will be painted this pm
|
BLD-Conference | 3/3/2008 | 3/4/2008 | 3/4/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/3/2008 at 3:50:36 PM. Contact: ###-####. ada unit
|
BLD-Final | 2/25/2008 | 2/26/2008 | 2/26/2008 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/25/2008 at 6:02:46 PM. Contact: ###-####. walked 2nd and 3rd floors
|
BLD-Other | 2/5/2008 | 2/6/2008 | 2/6/2008 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/5/2008 at 2:19:34 PM. Contact: ###-####. ok to cover ceiling in garage
|
BLD-Other | 1/25/2008 | 1/25/2008 | 1/25/2008 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/24/2008 at 4:40:35 PM. Contact: ###-####. ceiling grid in garage most of it ok needs to plump up some of the wires
|
BLD-Other | 1/24/2008 | 1/25/2008 | 1/25/2008 | A | DEFR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/24/2008 at 4:40:35 PM. Contact: ###-####. rescheduled to pm
|
BLD-Energy code compliance | 12/6/2007 | 12/7/2007 | 12/7/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/6/2007 at 5:53:13 PM. Contact: ###-####. 5th floor ok to cover the rest
|
BLD-Energy code compliance | 11/28/2007 | 11/29/2007 | 11/29/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/28/2007 at 12:19:56 PM. Contact: ###-####. 5th floor ok to cover all but two units
|
BLD-Energy code compliance | 11/15/2007 | 11/15/2007 | 11/16/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/14/2007 at 4:48:39 PM. Contact: ###-####. ok to cover 4th floor
|
BLD-Framing/Rough-in | 11/15/2007 | 11/15/2007 | 11/16/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/14/2007 at 4:48:39 PM. Contact: ###-####.
|
BLD-Energy code compliance | 11/14/2007 | 11/15/2007 | 11/15/2007 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/14/2007 at 4:48:55 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/14/2007 | 11/15/2007 | 11/15/2007 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/14/2007 at 4:48:39 PM. Contact: ###-####.
|
BLD-Energy code compliance | 11/12/2007 | 11/13/2007 | 11/13/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/12/2007 at 5:30:08 PM. Contact: ###-####. ok to cover third floor
|
BLD-Framing/Rough-in | 11/12/2007 | 11/13/2007 | 11/13/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/12/2007 at 5:29:41 PM. Contact: ###-####. ok to insulate fourth and fifth floors
|
BLD-Framing/Rough-in | 11/7/2007 | 11/7/2007 | 11/7/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/7/2007 at 10:45:35 AM. Contact: ###-####. ok to insulate roof ceiling
|
BLD-Framing/Rough-in | 11/5/2007 | 11/6/2007 | 11/6/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/5/2007 at 5:50:06 PM. Contact: ###-####. ok to insulate third floor
|
BLD-Conference | 11/5/2007 | 11/6/2007 | 11/6/2007 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/5/2007 at 5:49:40 PM. Contact: ###-####. draf stops in roof ceiling
|
BLD-Energy code compliance | 11/1/2007 | 11/2/2007 | 11/2/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/1/2007 at 2:20:34 PM. Contact: ###-####. ok to cover second floor
|
BLD-Energy code compliance | 10/30/2007 | 10/31/2007 | 11/2/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/30/2007 at 4:03:13 PM. Contact: ###-####. first lfoor ok to cover
|
BLD-Framing/Rough-in | 10/30/2007 | 10/31/2007 | 11/2/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/30/2007 at 4:01:45 PM. Contact: ###-####.second floor ok to insulate
|
BLD-Framing/Rough-in | 10/24/2007 | 10/25/2007 | 10/25/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/24/2007 at 5:28:28 PM. Contact: ###-####.first and second floor ok to insulate
|
BLD-Framing/Rough-in | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/11/2007 at 3:20:47 PM. Contact: ###-####.
|
BLD-Other | 10/11/2007 | 10/12/2007 | 10/12/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/11/2007 at 3:20:03 PM. Contact: ###-####. ok to cover ext
|
BLD-Other | 9/12/2007 | 9/12/2007 | 9/13/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/12/2007 at 10:23:51 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/12/2007 | 9/12/2007 | 9/13/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/12/2007 at 10:23:24 AM. Contact: ###-####.5th floor elev and stair and dumpter safts ok
|
BLD-Conference | 9/5/2007 | 9/6/2007 | 9/6/2007 | A | DONE |
Dave Hannah
|
|
|
MEET DIXIE AT 9 AM
|
BLD-Other | 8/31/2007 | 8/31/2007 | 8/31/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/31/2007 at 8:27:07 AM. Contact: ###-####.forth floor stairtowers and elev shaft ok
|
BLD-Other | 8/23/2007 | 8/23/2007 | 8/24/2007 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/23/2007 at 7:50:23 AM. Contact: ###-####. third floor sheetrock for stair towers and elev ok to cover
|
BLD-Other | 8/20/2007 | 8/21/2007 | 8/21/2007 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 8/20/2007 at 4:49:43 PM. Contact: ###-####.
|
MISC ACTIONS | | | 8/17/2007 | | |
|
|
|
Per e-mail received from Saco Construction they are no longer GC's on project. Petra is new GC. See attached scanned docuement; I called Petra and verified they are new GC//8/17/07 LEG
|
BLD-Other | 8/13/2007 | 8/14/2007 | 8/14/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/13/2007 at 4:01:22 PM. Contact: ###-####. ok to cover out side stair tower second floor
|
BLD-Other | 8/10/2007 | 8/10/2007 | 8/10/2007 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/10/2007 at 9:48:21 AM. Contact: ###-####. gyp nailling north and south stair and elavator nailling ok/ si signed off.
|
BLD-Conference | 7/25/2007 | 7/26/2007 | 7/26/2007 | A | PASS |
Dave Hannah
|
|
|
jack - 8:30 Phone #: ###-####
|
Code Occupancy Approval | | | 7/19/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/19/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 7/19/2007 | | DONE |
|
|
|
picked up and paid for plan modification
|
Plan assigned to (M_P) | 5/12/2007 | 5/12/2007 | 7/16/2007 | | PASS |
|
|
|
7/16/2007 13:46:21 M_P - activity updated through activity BLDA022 from case BLD06-00693.
|
Plan assigned to (M_P) | 5/1/2007 | 5/1/2007 | 7/16/2007 | | PASS |
|
|
|
7/16/2007 10:30:25 M_P - activity updated through activity BLDA022 from case BLD06-00693.
|
Plan resubmittals received | | | 7/16/2007 | | |
|
|
|
received transmittal letter from the architects office & plan mod app (2) pages and cert of value & plan mod review fees sheet- paperwork taken to Mike Phillips
|
Routing - PLAN CHECK | 7/16/2007 | | 7/16/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/16/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/16/2007 | | DONE |
|
|
|
|
Telephone call | | | 7/16/2007 | | DONE |
|
|
|
left vm for john price at ###-#### x2 - permit ready and fees given
|
Permit Ready to Issue | | | 7/16/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/9/2007 | | 7/16/2007 | | PEND |
|
|
|
PLAN MODIFICATION *
|
Override - Parcel Holds | | | 7/16/2007 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/16/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/16/2007 | | DONE |
|
|
|
PLAN MODIFICATION *
|
Plan resubmittals received | | | 7/12/2007 | | |
|
|
|
Resubmittal for Plan Modification: Received project letter and three copies of pages A2.1, A2.2, A2.3, A2.4, A2.5, A8.0, A8.1, A10.1; taken to Mike Phillilps
|
Routing - PUBLIC WORKS | 7/5/2007 | | 7/9/2007 | | PASS |
|
|
|
PLAN MODIFICATION * Passed under Solid Waste.
|
Routing - PLANNING | 7/9/2007 | | 7/9/2007 | | PASS |
|
|
|
PLAN MODIFICATION * Approved per DRH07-00226
|
Routing PW Solid Waste | 7/5/2007 | | 7/6/2007 | | PASS |
|
|
|
PLAN MODIFICATION
|
Routing - PLAN CHECK | 6/1/2007 | | 7/5/2007 | | FAIL |
|
|
|
PLAN MODIFICATION * Need additional information about the construction of the shaft. Beams can not penetrate the stair eclosure walls and beams are not permitted to be part of the two hour shaft enclosure. Called architect and left message for him to call me back.
|
Plan resubmittals received | | | 7/2/2007 | | |
|
|
|
Recieved transmittal and three copies of pages A1.0, A5.0; taken to Mike Phillips
|
Routing - FIRE | 5/29/2007 | | 6/1/2007 | | PASS |
|
|
|
PLAN MODIFICATION * Attached updated review comments to plans.
|
Plan resubmittals received | | | 5/31/2007 | | |
|
|
|
received transmittal from the architects office & form from b & t design & engineering. also "2" sets of plans including each sheet of St1.2, St1.3, St1.4, St1.5, &St1.6--plans taken to Mike Phillips
|
Routing - PLAN CHECK | 5/10/2007 | | 5/29/2007 | | FAIL |
|
|
|
PLAN MODIFICATION * Provide structural drawings and calculations to reflect the new trash/shaft enclosure.
|
Routing - PLANNING | 5/4/2007 | | 5/10/2007 | | FAIL |
|
|
|
PLAN MODIFICATION *
Application is being processed for a DR Modification. DRH07-00226 being done by Andrea Tuning.
|
Routing - PUBLIC WORKS | 5/4/2007 | | 5/4/2007 | | FAIL |
|
|
|
PLAN MODIFICATION *
|
Routing PW Drainage | 5/4/2007 | | 5/4/2007 | | PASS |
|
|
|
|
Routing PW Sewer Rating | 5/4/2007 | | 5/4/2007 | | PASS |
|
|
|
|
Routing PW Solid Waste | 5/4/2007 | | 5/4/2007 | | FAIL |
|
|
|
NEED MORE INFO ON REVISED TRASH PLANS
|
Case Summary (BLD) | | | 5/3/2007 | | |
|
|
|
|
Plan Modification Accepted | | | 5/1/2007 | | |
|
|
|
Plan Modification accepted for the re-design of "re-locating trash enclosure and adding a trash chute at the 2nd, 3rd, 4th & 5th floors at the North end of corridor." Sheets A1.0, A1.1, A2.1, A2.2, A2.3, A2.4, A2.5, A2.6, A5.0, A8.0, A8.1, A9.0, A10.1 and routed to Mike Phillips
|
Office Staff conference/action | | | 3/14/2007 | | DONE |
|
|
|
Met w/Ken Hosac. George Slane BO and myself agreed that work on the common garage between phase I and phase II constituted work on the project so permit has not expired. Instructed Mr. Hosac that if no work occurs in the next 180 days, he needs to request a permit extension for this permit. jlg.
|
Meeting | | | 2/12/2007 | | DONE |
|
|
|
Walk-in meeting with Bruce, Commercial Fire, requesting approval to install a bsmt separation fence (and cap bsmt sprinkler system) at the interface of Phase 1 and Phase Phase II (which they don't want to build now due to insufficient unit sales) so they can occupy Phase 1. Explained that this is not a sprinkler issue. Requested the owner submit a letter with architectural plans showing the proposed wall/construction, bsmt exiting, etc addressed to D. Hanneman and G. Slane requesting approval of their proposal to allow occupancy of Phase 1 prior to completing the rest of the building.
|
BLD-Aging Inspection | 11/16/2006 | 11/16/2006 | 11/20/2006 | | PASS |
Dave Hannah
|
|
|
wip
|
Plan resubmittals received | | | 9/13/2006 | | |
|
|
|
Received a 1 page response letter from John Price regarding 2-hr stair shaft walls and 4 copies of the electrical box @ 2 hr shaft and taken to Marlene S per Dave H.
|
Permit Ready to Issue | | | 8/8/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/8/2006 | | DONE |
|
|
|
left mess for john price at ###-#### that permit is ready
|
Issue PAID IN FULL permit | | | 8/8/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/7/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 7/26/2006 | 7/26/2006 | 8/4/2006 | | PASS |
|
|
|
8/4/2006 15:24:05 M_P - activity updated through activity BLDA022 from case BLD06-00693.
|
Routing - PLAN CHECK | 7/26/2006 | | 8/4/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/4/2006 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/4/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/4/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 3/21/2006 | 3/21/2006 | 7/26/2006 | | PASS |
|
|
|
7/26/2006 09:25:10 M_P - activity updated through activity BLDA022 from case BLD06-00693.
|
Routing - PLAN CHECK | 7/21/2006 | | 7/26/2006 | | PEND |
|
|
|
Waiting for appreal period to end prior to issuing permit.
|
Routing - MECHANICAL | 7/26/2006 | | 7/26/2006 | | PASS |
|
|
|
Second mechanical review completed by plan reviewer.
|
Override - Parcel Holds | | | 7/26/2006 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 7/26/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 7/25/2006 | | |
|
|
|
Received 1 copy of cover transmital, 3 copies of A10.0 and taken to Mike Phillips
|
Routing - PLAN CHECK | 6/23/2006 | | 7/21/2006 | | FAIL |
|
|
|
3rd review failed. Faxed comments to archiect requesting additional informaiton to be submitted for further review prior to issuing permit.
|
Plan resubmittals received | | | 6/30/2006 | | |
|
|
|
Recieved 2 pg. project letter to Mike Phillips from The Architects Office, 3 copies of A10.0; taken to Mike Phillips
|
Routing - PLAN CHECK | 6/13/2006 | | 6/23/2006 | | FAIL |
|
|
|
Second review failed, sent correction report to the architect requesting additional informaiton be submitted for further review prior to issuing permit.
|
Plan resubmittals received | | | 6/23/2006 | | DONE |
|
|
|
2 sets of S0.1, S0.2, S1.0, S1.1, S1.2, S2.0, S2.1, S3.0, S3.1 with transmittal form
|
Routing Off Site - STRUCTURAL | 5/31/2006 | | 6/23/2006 | | PASS |
|
|
|
No further review required by the outside engineering firm.
|
Routing - Addressing | 6/12/2006 | | 6/13/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 4/26/2006 | | 6/12/2006 | | |
|
|
|
Routing to Addressing.
|
Plan resubmittals received | | | 6/7/2006 | | DONE |
|
|
|
Received 1transmittal,1 project letter, & 1 copy of sheet A10.0 taken to Mike P.
|
Plan resubmittals received | | | 5/26/2006 | | |
|
|
|
Received 1 copy of 5 page plan review response letter, 1 copy of project start up for special inspections, 3 copies of the following A1.0, A2.1, A2.2, A2.3, A2.4, A2.5, A2.6, A3.5, A4.1, A6.2, A8.0, A8.1, A10.0, A10.1, A10.2, E1.0 and taken to Mike Phillips
|
Plan resubmittals received | | | 5/26/2006 | | DONE |
|
|
|
Received 2 project letters,2 review comments,3 slab on grade,3 response comments/structural calcs,3 copys of sheet S2.1,ST1.1,ST1.2,ST1.3,ST1.4,ST1.5,ST1.6,ST2.1 taken to Mike P.
|
1st review completed | | | 4/26/2006 | | FAIL |
|
|
|
Failed Mechanical
|
Routing - FIRE | 4/24/2006 | | 4/26/2006 | | PASS |
|
|
|
Faxed review comments to architect. Attached review comments to plans.
|
Routing - PLAN CHECK | 4/5/2006 | | 4/24/2006 | | FAIL |
|
|
|
Sent correction report to architect, requesting additional information be submitted for further review prior to issuing permit.
|
Case Summary (BLD) | | | 4/24/2006 | | |
|
|
|
|
Routing - PLANNING | 4/5/2006 | | 4/5/2006 | | PASS |
|
|
|
PER CUP04-87. See conditions.
|
Routing - PLANNING | 3/27/2006 | | 4/5/2006 | | PASS |
|
|
|
Approved per DRH04-00241 (3/31/06, Marty S.)
Routed to Angela W. for review per CUP04-00087.
|
Routing Off Site - STRUCTURAL | 3/21/2006 | | 3/30/2006 | | FAIL |
|
|
|
Called Action Courrier for pick up @ 3:05on 3/21/06 BAS
|
Routing - MECHANICAL | 3/21/2006 | | 3/28/2006 | | FAIL |
|
|
|
Routed off site via Fed-ex to ICC in Whittier, California to perform mechanical plan review in accordance with Boise City Municipal Code Section 4-16-08.
Attached copy of correction report from outside review to my plan review and sent to architect on 4/24/06 MJP
|
Routing - PLUMBING | 3/23/2006 | | 3/27/2006 | | PASS |
|
|
|
suds relief required.
|
Routing - Erosion and Sediment | 3/23/2006 | | 3/23/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 3/22/2006 | | 3/23/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 3/21/2006 | | 3/22/2006 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/21/2006 | | |
|
|
|
|
Application received | | | 3/21/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/21/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/21/2006 | | |
|
|
|
|
Fee Review-notes | 3/21/2006 | 3/21/2006 | | | |
|
|
|
|