Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00710
StatusFinaled
Name GRANITE CONTRACTING LLC
Site Address 5261 W MORRIS HILL RD
Project NameWatkins Condominiums BLD 1
Customer Number 
ePlanReviewNo
Description
(Grainte Contracting RCE-9920)Building 1, Units 1-4 * 5261,5265,5269,5273 W Morris Hill Rd (To construct a new 7,710 square feet, two story, four unit apartment building. Each unit is two story, three bedroom, two and one-half bath, 1,495 square feet, with an attached 384 square feet garage. Two units share a common 97 square feet front entry hall. All construction per the approved plans and attached comment list. NOTE: Buildings 1 & 2 are to be considered as one-building for exterior wall and opening protection per IBC Section 704.3 - Exception. MJP DRH 06-00019 CUP 03-00078 Mod 1.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD9/22/20089/22/20089/25/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 8/11/20089/22/2008 DONE
Permanent Occupancy  8/11/2008 DONE
DetailsBarbara Stitt
BLD-Aging Inspection6/3/20086/3/20086/3/2008 PASS
DetailsTom Arcoraci
BLD-Aging Inspection2/15/20082/15/20082/15/2008 PASS
DetailsTom Arcoraci
BLD-Aging Inspection12/14/200712/14/200712/14/2007 PASS
DetailsTom Arcoraci
BLD-Aging Inspection9/28/20079/28/20079/28/2007 DONE
DetailsTom Arcoraci
BLD-Aging Inspection7/27/20077/27/20077/27/2007 PASS
DetailsTom Arcoraci
BLD-Aging Inspection4/30/20074/30/20074/30/2007 PASS
DetailsTom Arcoraci
Temporary occupancy  2/27/2007 DONE
Temp. Occ. Cert. #5544 issued 2-27-07 to Watkins Condominiums.
CHANGE STATUS TO (ISS)  1/26/2007 DONE
Code Occupancy Approval Temp12/22/200612/22/200612/22/2006PFAIL
DetailsDena Gambrel
12-22-06 Three trees need to be planted along with several plants in each bedding area. Some of the planting areas are small and planting all the plants will croud the other plants. Requested that they bond for the plants and this would allow them to obtain a Temporary Occupancy. Before Final Occupance can be given they will need to submit an updated landscape plan for the changes of the trees and plants. Correction Notice given. Did not require a reinspection fee this time but did advise Dave that I would on the other buildings if landscape was not per the approved plans.
BLD-Final12/21/200612/22/200612/22/2006APASS
DetailsTom Arcoraci
mitch; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok pending code enf sign off
FIRE-Final Inspection12/21/200612/22/200612/22/2006APASS
DetailsTroy Cobbley
Life safety finaled
BLD-Final12/20/200612/21/200612/21/2006PNR
DetailsTom Arcoraci
Mitch; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
FIRE-Final Inspection12/21/200612/21/200612/21/2006PFAIL
DetailsTroy Cobbley
Smoke detector in 5265 at the top of the stairs does not operate correctly. All other items are ok
FIRE-Final Inspection12/20/200612/21/200612/21/2006AFAIL
DetailsTroy Cobbley
Provide fire extinguishers and test the smoke alarms and door closure in the two center units.
BLD-Aging Inspection12/1/200612/1/200612/1/2006 PASS
DetailsTom Arcoraci
(F) Reprint permit  10/24/2006 DONE
BLD-Energy code compliance9/22/20069/25/20069/25/2006APASS
DetailsTom Arcoraci
mitch; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Framing/Rough-in9/20/20069/21/20069/21/2006APART
DetailsTom Arcoraci
mitch; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok after mech patch and fire 1 hr wall in attic
BLD-Framing/Rough-in9/19/20069/20/20069/20/2006PCANC
DetailsTom Arcoraci
mitch Note: inspection 3:00 ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Conference8/21/20068/21/20068/21/2006PPASS
DetailsTom Arcoraci
BLD-Conference8/18/20068/21/20068/21/2006APART
DetailsTom Arcoraci
mitch; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Foundation7/26/20067/27/20067/27/2006APASS
DetailsTom Arcoraci
ty ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Footing7/21/20067/24/20067/24/2006APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 7/21/2006 at 12:22:04 PM. Contact: ###-####.
Telephone call  7/17/2006 DONE
Per Jenifer Gilliland ok to release plans with 1 building at a time. Called Mitch and told him that he could come get building 1 at this time///7/17/06 @ 1:45pm BAS
Issue PAID IN FULL permit  7/17/2006 DONE
Telephone call  7/13/2006 DONE
tlk to mitch ###-#### that permit and fees are ready to be picked up
Print Occupancy Form  7/12/2006 DONE
Permit Ready to Issue  7/12/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/10/2006 DONE
Print Pending Permit.LaserJet4  7/10/2006 DONE
Case Summary (BLD)  7/10/2006 DONE
Routing - PLAN CHECK6/29/2006 7/10/2006 PASS
Plan assigned to (M_P)3/23/2006 7/10/2006 PASS
7/10/2006 16:17:43 M_P - activity updated through activity BLDA022 from case BLD06-00710.
Plan resubmittals received  6/30/2006  
Received 2 copies of the following pages-- Cover transmittal, Plan review comments letter, A-2, A-4 and taken to Mike Phillips
Routing - PLAN CHECK6/15/2006 6/29/2006 FAIL
Second review failed, sent correction report to the architect requesting additional informaiton be submitted for further review prior to issuing permit.
Routing - FIRE6/12/2006 6/15/2006 PASS
Resubmitted United Water fire flow information dated 6/7/06. Attached review comments to plans.
Routing - PLAN CHECK5/17/2006 6/12/2006  
Routing to fire.
Plan resubmittals received  6/8/2006  
received 1 transmittal, & 1 Fire flow sheet taken to Mike P.
Plan resubmittals received  6/5/2006  
Received 2 of each of the following forms--cover transmittal letter,PLan review report, valley engineering response letter, A-S, A-L, A-1, A-1.1, A-2, A-3, A-4, EN, S-1, SA-2, SA-3, SA-4 and taken to Mike Phillips
Plan resubmittals received  5/22/2006 DONE
Received 2 building department plan review comments, 2 letters to George MCLean & 2 copys of sheets A-S,A-L,A-1,A-1.1,A-2,A-3,A-4,EN-A,SA-1,SA-2,SA-3,SA-4 taken to Mike P.
Routing - PUBLIC WORKS5/16/2006 5/17/2006 PASS
Routing - PLAN CHECK5/10/2006 5/16/2006  
Routing to P.W.
Routing - FIRE5/9/2006 5/10/2006 FAIL
Faxed resubmittal item to architect. Attached review comments to plans.
Plan Reviewer's activity  5/9/2006 DONE
Recieved United Water fire flow information.
Routing - FIRE5/5/2006 5/8/2006 FAIL
Contacted Architect regarding submittal of United Water fire flow documentation. Awaiting transmittal of document.
Telephone call  5/8/2006 PEND
Telephoned Mitch Cornell requesting United Water fire flow documentation for Watkins Condominiums. Mitch will be faxing over documentation as he recieves it from United Water.
1st review completed  5/8/2006 FAIL
Failed Fire.
Routing - PLAN CHECK4/6/2006 5/5/2006 FAIL
Plan review completed, sent correction report to the architect requesting additional information be submitted for further review prior to issuing permit.
Case Summary (BLD)  5/5/2006  
Routing - PLANNING4/6/2006 4/6/2006 PASS
CUP03-00078 per mod Angela W.
Routing - PLANNING4/3/2006 4/5/2006 PASS
DRH06-00019- Cody R. CUP03-00078 Angela W.

Meets DR requirements per Sarah Schafer/Hall Simmons.
Routing - PLUMBING3/31/2006 4/3/2006 PASS
Routing - Erosion and Sediment4/3/2006 4/3/2006 PASS
4/3/06 Refer to ESC06-00406 as master ESC plan for entire project.adh.
Routing - Erosion and Sediment3/30/2006 3/31/2006 FAIL
No esc narrative routed from P. Works.
Routing - PUBLIC WORKS3/24/2006 3/30/2006 FAIL
WAITING FOR TRASH COMMENTS FOR FINAL SIGN OFF BY TRASH
Routing - PLANNING Land Div3/23/2006 3/24/2006 PASS
Plan routing begun/NEW & ADDTN  3/23/2006  
Plans ACCEPTED BY PLAN TECH  3/23/2006  
Application received  3/22/2006  
Recd Pcfee & Taken To Pln CK  3/22/2006  
Fee Review-notes3/22/20063/22/2006