StatusFinaled
Name GRANITE CONTRACTING LLC
Site Address 5225 W MORRIS HILL RD
Project NameWatkins Condominiums BLD 4
Customer Number 
ePlanReviewNo
Description
Building 4, Units 13-16 * 5225,5229,5233,5237 MORRIS HILL RD* To construct a new 7,710 square feet, two story, four unit apartment building. Each unit is two story, three bedroom, two and one-half bath, 1,495 square feet, with an attached 384 square feet garage. Two units share a common 97 square feet front entry hall. All construction per the approved plans and attached comment list. MJP DRH 06-00019 CUP 03-00078 Mod 1.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes3/22/20063/22/20063/3/2008 DONE
DetailsCathy Brown
Second Notice BLD2/6/20082/6/20082/11/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 1/15/20082/6/2008 DONE
Permanent Occupancy  1/15/2008 DONE
BLD-Aging Inspection12/18/200712/18/200712/18/2007 PASS
DetailsTom Arcoraci
BLD-Final10/16/200710/16/200710/16/2007PPASS
DetailsTom Arcoraci
mitch Phone #: ###-####
Override - Parcel Holds10/16/20071/1/190010/16/2007  
fire code
Code Occupancy Approval10/11/200710/11/200710/11/2007PPASS
DetailsDena Gambrel
10-11-07 Passed.
FIRE-Final Inspection10/9/200710/9/200710/9/2007PPASS
DetailsTroy Cobbley
life safety passed
Override - Parcel Holds10/9/20071/1/190010/9/2007  
they are doing fire inspection
FIRE-Final Inspection8/30/20078/31/20078/31/2007APART
DetailsTroy Cobbley
This inspection was for 5237 only. It is ok with me to occupy. No signature was given since the scope of work was for four condo's.
BLD-Final8/30/20078/31/20078/31/2007PPASS
DetailsTom Arcoraci
Daniel; Phone #: ###-#### Internet Inspection Request from: Hattie James
BLD-Energy code compliance8/6/20078/7/20078/7/2007PPASS
DetailsTom Arcoraci
mitch. Phone #: ###-#### ok pending mech
BLD-Energy code compliance8/3/20078/6/20078/6/2007APART
DetailsTom Arcoraci
Mitch; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Footing6/12/20076/13/20076/13/2007PPASS
DetailsJim Sly
Mitch ###-####
Issue PAID IN FULL permit  6/12/2007 DONE
Telephone call  5/1/2007  
mitch with granite const left mess stating he still wants plans- has been picking them up randomly
Print Occupancy Form  7/12/2006 DONE
Permit Ready to Issue  7/12/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/10/2006 DONE
Case Summary (BLD)  7/10/2006 DONE
Routing - PLAN CHECK6/29/2006 7/10/2006 PASS
Plan assigned to (M_P)3/23/2006 7/10/2006 PASS
7/10/2006 16:17:42 M_P - activity updated through activity BLDA022 from case BLD06-00710.
Plan resubmittals received  6/30/2006  
Received 2 copies of the following pages-- Cover transmittal, Plan review comments letter, A-2, A-4 and taken to Mike Phillips
Routing - PLAN CHECK6/15/2006 6/29/2006 FAIL
Second review failed, sent correction report to the architect requesting additional informaiton be submitted for further review prior to issuing permit.
Routing - FIRE6/12/2006 6/15/2006 PASS
Resubmitted United Water fire flow information dated 6/7/06. Attached review comments to the plans.
Routing - PLAN CHECK5/17/2006 6/12/2006  
Routing to the fire department.
Plan resubmittals received  6/8/2006 DONE
received 1 transmittal, & 1 Fire flow sheet taken to Mike P.
Plan resubmittals received  6/5/2006  
Received 2 of each of the following forms--cover transmittal letter,PLan review report, valley engineering response letter, A-S, A-L, A-1, A-1.1, A-2, A-3, A-4, EN, S-1, SA-2, SA-3, SA-4 and taken to Mike Phillips
Routing - PUBLIC WORKS5/16/2006 5/17/2006 PASS
Routing - PLAN CHECK5/10/2006 5/16/2006  
Routing to P.W.
Routing - FIRE5/9/2006 5/10/2006 FAIL
Faxed resubmittal item to architect. Attached review comments to plans.
1st review completed  5/8/2006 FAIL
Failed Plan Check & Fire.
Telephone call  5/8/2006 PEND
Spoke with Architect and requested submittal of fire flow information from United Water. Awaiting submittal of required documentation.
Routing - FIRE5/5/2006 5/8/2006 FAIL
Spoke with Architect regarding required submittal of United Water Fire Flow documentation. Awaiting submittal of Water Fire Flow documentation.
Routing - PLAN CHECK4/6/2006 5/5/2006 FAIL
Plan review completed, sent correction report to the architect requesting additional information be submitted for further review prior to issuing permit.
Routing - PLANNING4/6/2006 4/6/2006 PASS
CUP03-00078 per mod Angela W.
Routing - PLANNING4/3/2006 4/5/2006 PASS
DRH06-00019 Cody R. CUP03-00078

Meets DR requirements per H. Simmons/S. Schafer
Routing - PLUMBING3/31/2006 4/3/2006 PASS
Routing - Erosion and Sediment4/3/2006 4/3/2006 PASS
4/3/06 Refer to ESC06-00406 as master ESC plan for entire project.adh.
Routing - Erosion and Sediment3/30/2006 3/31/2006 FAIL
No esc narrative routed from p. works.
Routing - PUBLIC WORKS3/24/2006 3/30/2006 FAIL
WAITING FOR TRASH COMMENTS FOR FINAL SIGN OFF BY TRASH
Routing - PLANNING Land Div3/23/2006 3/24/2006 PASS
Plans ACCEPTED BY PLAN TECH  3/23/2006  
Plan routing begun/NEW & ADDTN  3/23/2006  
(F) Reprint permit  3/23/2006 DONE
Application received  3/22/2006  
Recd Pcfee & Taken To Pln CK  3/22/2006