Permit Information
Permit NumberBLD06-00715
StatusFinaled
Name GRANITE CONTRACTING LLC
Site Address 5217 W MORRIS HILL RD
Project NameWatkins Condominiums BLD 5
Customer Number 
ePlanReviewNo
Description
Watkins Condominiums Building 5, Units 17-20 *5217,5219,5221,5223 MORRIS HILL RD* To construct a new 7,710 square feet, two story, four unit apartment building. Each unit is two story, three bedroom, two and one-half bath, 1,495 square feet, with an attached 384 square feet garage. Two units share a common 97 square feet front entry hall. All construction per the approved plans and attached comment list. MJP DRH 06-00019 CUP 03-00078 Mod 1.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/11/20088/11/20088/12/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 6/20/20088/11/2008 DONE
Permanent Occupancy  6/20/2008 DONE
DetailsCathy Weisshaupt
Temporary Occupancy6/13/20089/11/20086/13/2008 DONE
DetailsBarbara Stitt
FIRE-Final Inspection4/21/20084/22/20084/22/2008APASS
DetailsTroy Cobbley
fire life safety passed
BLD-Final2/27/20082/28/20082/28/2008PPART
DetailsTom Arcoraci
mitch Phone #: ###-#### ok for 2 west units
FIRE-Final Inspection2/27/20082/28/20082/28/2008APART
DetailsTroy Cobbley
Addresses 5221 and 5223 are the only two of the four ok to occupy.
CHANGE STATUS TO (ISS)  2/28/2008 DONE
BLD-Energy code compliance2/5/20082/6/20082/6/2008APASS
DetailsTom Arcoraci
mitch Phone #: ###-####
BLD-Framing/Rough-in2/4/20082/4/20082/4/2008PPASS
DetailsTom Arcoraci
mitch Phone #: ###-####
BLD-Wall cover1/25/20081/28/20081/28/2008APASS
DetailsTom Arcoraci
Mitch Phone #: ###-####
BLD-Framing/Rough-in1/24/20081/25/20081/25/2008APASS
DetailsTom Arcoraci
mitch Phone #: ###-####
BLD-Aging Inspection1/14/20081/14/20081/14/2008 PASS
DetailsTom Arcoraci
BLD-Footing11/13/200711/14/200711/14/2007APASS
DetailsTom Arcoraci
mitch Phone #: ###-####
Override - Parcel Holds11/13/20071/1/190011/13/2007  
footing
Issue PAID IN FULL permit  11/13/2007 DONE
Telephone call  9/11/2007 DONE
left mess for mitch at ###-#### that permit is ready
Telephone call  5/1/2007  
mitch with granite const left mess stating he still wants plans- has been picking them up randomly
Print Occupancy Form  7/12/2006 DONE
Permit Ready to Issue  7/12/2006 DONE
Routing - PLAN CHECK6/29/2006 7/10/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/10/2006 DONE
Print Pending Permit.LaserJet4  7/10/2006 DONE
Case Summary (BLD)  7/10/2006 DONE
Case Summary (BLD)  7/10/2006 DONE
Plan assigned to (M_P)3/23/2006 7/10/2006 PASS
7/10/2006 16:17:42 M_P - activity updated through activity BLDA022 from case BLD06-00710.
Plan resubmittals received  6/30/2006  
Received 2 copies of the following pages-- Cover transmittal, Plan review comments letter, A-2, A-4 and taken to Mike Phillips
Routing - PLAN CHECK6/15/2006 6/29/2006 FAIL
Second review failed, sent correction report to the architect requesting additional informaiton be submitted for further review prior to issuing permit.
Routing - FIRE6/12/2006 6/15/2006 PASS
6/15/06 - Resubmitted Fire flow data by United Water @2,750 gpm 6/7/06. Attached review comments to plans.
Routing - PLAN CHECK5/17/2006 6/12/2006  
Routing to the fire department.
Plan resubmittals received  6/8/2006 DONE
received 1 transmittal, & 1 Fire flow sheet taken to Mike P.
Plan resubmittals received  6/5/2006  
Received 2 of each of the following forms--cover transmittal letter,PLan review report, valley engineering response letter, A-S, A-L, A-1, A-1.1, A-2, A-3, A-4, EN, S-1, SA-2, SA-3, SA-4 and taken to Mike Phillips
Routing - PUBLIC WORKS5/16/2006 5/17/2006 PASS
Routing - PLAN CHECK5/10/2006 5/16/2006  
Routing to P.W.
Routing - FIRE5/10/2006 5/10/2006 FAIL
Faxed resubmittal item to architect. Attached review comments to plans.
Routing - FIRE5/5/2006 5/8/2006 FAIL
Spoke with Architect requesting united Water Fire Flow documentation. Awaiting submittal.
Telephone call  5/8/2006 PEND
Spoke with Architect regarding required submittal of United Water Fire Flow documentation. Awaiting submittal.
1st review completed  5/8/2006 FAIL
Failed Plan Check and Fire.
Case Summary (BLD)  5/5/2006  
Routing - PLAN CHECK4/6/2006 5/5/2006 FAIL
Plan review completed, sent correction report to the architect requesting additional information be submitted for further review prior to issuing permit.
Routing - PLANNING4/6/2006 4/6/2006 PASS
CUP03-00078 per mod Angela W.
Routing - PLANNING4/3/2006 4/5/2006 PASS
DRH06-00019 Cody R. CUP03-00078

Meets DR requirements per H. Simmons/S. Schafer
Routing - PLUMBING3/31/2006 4/3/2006 PASS
Routing - Erosion and Sediment4/3/2006 4/3/2006 PASS
4/3/06 Refer to ESC06-00406 as master ESC plan for entire project.adh.
Routing - Erosion and Sediment3/30/2006 3/31/2006 FAIL
No esc narrative routed from p. works.
Routing - PUBLIC WORKS3/24/2006 3/30/2006 FAIL
WAITING FOR TRASH COMMENTS FOR FINAL SIGN OFF BY TRASH
Routing - PLANNING Land Div3/23/2006 3/24/2006 PASS
Plans ACCEPTED BY PLAN TECH  3/23/2006  
Plan routing begun/NEW & ADDTN  3/23/2006  
Application received  3/22/2006  
Recd Pcfee & Taken To Pln CK  3/22/2006  
Fee Review-notes3/22/20063/22/2006