Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00747
StatusFinaled
Name CUSTOM POOLS & PATIO
Site Address 2711 W HILLWAY DR
Project Name 
Customer Number 
ePlanReviewNo
Description
RCE-1401 "STEPHEN CHANDLER" This project is for the placement of a new inground concrete/gunite swimming pool; retaining walls and decking in the hillside area with ESC plan approved by Steve Webb; hillside grading with conditions approved by Terry Records. A letter from the applicant's geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946. Separate electrical permit is required and bonding of all metal parts is required to be approved by the electrical division prior to approval for placement of any concrete by the structural division. R-1B setbacks ok per Tom Curren and Cody Riddle and must comply with conditions of CFH06-00005. All per the approved plans as marked and attached engineering. pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/28/20067/31/20067/31/2006APASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Katie Sager
DOC - Permit Finaled7/31/20067/31/20067/31/2006PPASS
DetailsTony Young
BLD-Footing5/24/20065/24/20065/24/2006PNR
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing5/17/20065/17/20065/17/2006PPART
DetailsTony Young
Reinspection per Tony Young. Terry has the letter with enigneer stamp he told me it would now pass. We have pour scheduled for 5/18 @ 1:30pm; Phone #: ###-#### Internet Inspection Request from: Katie Sager
ok when ready
PubWorks Subgrade Approval5/17/20065/17/20065/17/2006 DONE
Subgrade for pool has been approved by the geotechnical engineer
BLD-Footing5/15/20065/16/20065/16/2006AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 5/15/2006 at 2:12:06 PM. Contact: ###-####.
c/n posted,, need soil report for pool,, re-call ftg inspection
BLD-Footing4/13/20064/14/20064/14/2006PPART
DetailsTony Young
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
new deck post holes,, no plans for this on site,,
PubWorks Subgrade Approval4/14/20064/14/20064/14/2006 DONE
subgrade for 3 deck column footings has been approved by the geotechnical engineer
Plan assigned to (PEP)3/29/2006 3/29/2006 PASS
3/29/2006 14:18:28 PEP - activity updated through activity BLDA022 from case BLD06-00747.
Case Summary (BLD)  3/29/2006  
PLANS/APPL TAKEN TO FRONT DESK  3/29/2006 DONE
Inspection Record Card- Bld  3/29/2006 DONE
Permit Ready to Issue  3/29/2006  
Issue PAID IN FULL permit  3/29/2006 DONE
Routing - Erosion and Sediment3/27/2006 3/27/2006 PASS
ESC plan approved with attached conditions.
Routing - PLANNING3/27/2006 3/27/2006 PASS
Applicant must comply with the requirements of CFH06-00005.
Application received  3/24/2006  
Routing - PUBLIC WORKS GRADING3/24/2006 3/24/2006 PASS
Approved as Category 1 by CFH06-00005 per conditions in letter attached to this plan and this case.
PubWorks Subgrade Approval7/11/20067/11/2006  PASS
Received letter from Strata approving fill material placed at southeast corner of concrete pool deck.
Routing - PLAN CHECK3/27/2006    
Perry P.