Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD06-00768
StatusFinaled
Name 4TH STORY RESTROOM & ELEV LOBBY
Site Address 101 S CAPITOL BLVD
Project NameUS BANK-4TH FLR
Customer Number 
ePlanReviewNo
Description
PER UNICO EXCEMPT BECAUSE THEY ARE THE PROPERTY OWNER OF US BANK PLAZA///4/25/06 BAS (US BANK PLAZA - 4TH STORY RESTROOM AND ELEVATOR LOBBY REMODEL) This building is fire sprinklered because it is a high-rise. To upgrade the 4th story core restrooms to be accessible to the disabled and to remodel the 4th story elevator lobby. Selective nonstructural demolition within the restrooms and the elevator lobby is also covered under this permit. The floor area of the entire 4th story is about 14,600 square feet. The "core" has a floor area of about 2,730 square feet (335 square feet for restrooms, 937 square feet for elevator lobby and corridor, 1,458 square feet for stairways/elevators/shafts/etc). Work is to include interior nonbearing walls, ceilings, relocated plumbing fixtures, and finishes. The fire sprinkler system, fire alarm system, and high-rise life safety systems (and the infrastructure supporting these systems) for the 4th story are required to comply with the provisions of the 2000 IBC. Existing systems shall be upgraded where necessary, including the installation of quick-response fire sprinklers throughout the 4th story. If not already existing, fire-safing shall be installed at the perimeter of the 4th story between the floor and the spandrel glass. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  7/2/2013 DONE
Plan Reviewer's activity  6/21/2010 DONE
Took office copy to Records.
BLD-Final4/23/20104/23/20104/27/2010APASS
DetailsDave Hannah
DOC - Permit Finaled4/27/20104/27/20104/27/2010PPASS
DetailsDave Hannah
BLD-Aging Inspection4/23/20104/23/20104/23/2010 DEFR
DetailsDave Hannah
BLD-Framing/Rough-in8/17/20068/17/20068/18/2006PDONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/17/2006 at 8:14:05 AM. Contact: ###-####.
BLD-Framing/Rough-in8/17/20068/18/20068/18/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/17/2006 at 8:14:05 AM. Contact: ###-####. ceiling grid ok to cover
BLD-Framing/Rough-in6/20/20066/20/20066/20/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/20/2006 at 6:55:18 AM. Contact: ###-####.
Issue PAID IN FULL permit  4/25/2006 DONE
Permit Ready to Issue  4/17/2006 DONE
Telephone call  4/17/2006  
called ###-#### and left voicemail for Cory that permit is ready, fees, and need GC & RCE
Plan assigned to (CJW)3/30/2006 4/14/2006 PASS
4/14/2006 14:20:02 CJW - activity updated through activity BLDA022 from case BLD06-00768.
Routing - FIRE4/12/2006 4/14/2006 PASS
Attached review comments to plans.
1st review completed  4/14/2006 PASS
Routing - PLAN CHECK4/14/2006 4/14/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  4/14/2006 DONE
Inspection Record Card- Bld  4/14/2006  
Routing - PLAN CHECK3/31/2006 4/12/2006 PASS
The IBC plan review was started on April 11, 2006 and was finished the next day. The drawings were approved with the attached plan review report and as noted. See the plan review report.
Routing - PUBLIC WORKS3/30/2006 3/31/2006 PASS
Plans ACCEPTED BY PLAN TECH  3/28/2006  
Fee Review-notes3/27/20063/27/20063/27/2006 DONE
DetailsTisha Gallop
Application received  3/27/2006  
Recd Pcfee & Taken To Pln CK  3/27/2006