Case Summary (BLD) | | | 8/21/2012 | | DONE |
|
|
|
|
BLD-Final | 12/28/2006 | 12/28/2006 | 12/28/2006 | P | PASS |
Tony Young
|
|
|
###-#### John King ok for c of o
|
Override - Parcel Holds | | | 12/28/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/28/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/28/2006 | | |
|
|
|
|
BLD-Final | 12/20/2006 | 12/21/2006 | 12/21/2006 | A | NR |
Jim Sly
|
|
|
John ###-#### Note: per mIke phillips holds not on this bldg Need to final .......PLM-06-00564 still on issued status and ELE06-01379 on Hold....prior to calling for Bld final....Notified Contr.
|
Override - Parcel Holds | | | 12/20/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/20/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/20/2006 | | |
|
|
|
|
FIRE-Final Inspection | 12/19/2006 | 12/19/2006 | 12/19/2006 | P | PASS |
Forrest France
|
|
|
Final inspection for apt. 300, 301, 308, 309 is acceptable, fire extinguishers for these units are on site and are to be installed today as a condition of approval.
|
Plan Reviewer's activity | | | 12/19/2006 | | DONE |
|
|
|
Removed comment in permit about condo platting.
|
Override - Parcel Holds | | | 12/19/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/19/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 12/19/2006 | | |
|
|
|
|
FIRE-Final Inspection | 11/6/2006 | 11/7/2006 | 11/7/2006 | A | PART |
Forrest France
|
|
|
Required corrections for unit 315 second floor have been verified for completion.
|
BLD-Final | 11/6/2006 | 11/7/2006 | 11/7/2006 | A | PART |
Dave Hannah
|
|
|
John King ###-####//for quad 304, 312 ok for temp occ ok for perm occ after all units completed units 312-315 ok for temp after fire signoff
|
Override - Parcel Holds | | | 11/6/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 11/6/2006 | | |
|
|
|
|
BLD-Final | 10/23/2006 | 10/24/2006 | 10/24/2006 | A | FAIL |
Tony Young
|
|
|
John; Phone #: ###-#### need handrails on stairs serving 2 units,, need to verify zoning compliance per plan
|
BLD-Final | 10/23/2006 | 10/23/2006 | 10/23/2006 | P | CANC |
Tony Young
|
|
|
john - note: units 312-315 and 304-307 ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith out of time
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 10/23/2006 | | |
|
|
|
|
FIRE-Final Inspection | 10/18/2006 | 10/19/2006 | 10/19/2006 | A | PART |
Forrest France
|
|
|
Units 304 thru 307 and unit 312 are okay for life safety final, unit 315 second floor needs primary power supply functional for the smoke alarms-the detectors were functional on battery backup test.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 10/18/2006 | | |
|
|
|
|
Routing - PLANNING Land Div | 10/13/2006 | | 10/17/2006 | | PASS |
|
|
|
Recorded 8/11/06 Instrument # 106129153
|
FIRE-Final Inspection | 10/16/2006 | 10/16/2006 | 10/16/2006 | P | FAIL |
Troy Cobbley
|
|
|
No approved notes. I did note that the smoke alarms still had covers on them, a fire extinguisher on the second level was missing and the one provided on the first level was too high. Also the doors do not close and the smoke seals have not been installed.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 10/16/2006 | | |
|
|
|
|
BLD-Final | 10/11/2006 | 10/12/2006 | 10/12/2006 | P | PART |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Patricia Smith unit 312-315 ok for temp occ after fire l/s sign off
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 10/11/2006 | | |
|
|
|
does not apply final
|
BLD-Energy code compliance | 8/7/2006 | 8/8/2006 | 8/8/2006 | A | PART |
Tony Young
|
|
|
JOHN; Phone #: ###-#### Internet Inspection Request from: Darla Downs 300-301 ok to cover
|
BLD-Framing/Rough-in | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | PART |
Tony Young
|
|
|
john - quad 300; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 300-301 ok to insulate pending trades
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 8/1/2006 | | |
|
|
|
|
BLD-Energy code compliance | 7/26/2006 | 7/26/2006 | 7/26/2006 | P | PART |
Tony Young
|
|
|
john Note: quad 308; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles quad 308 ok to cover
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 7/26/2006 | | |
|
|
|
not a c of o
|
BLD-Framing/Rough-in | 7/18/2006 | 7/18/2006 | 7/18/2006 | P | PART |
Tony Young
|
|
|
john - quad 308; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley quad 308 ok to insulate,, still working on a couple of things
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 7/18/2006 | | |
|
|
|
|
BLD-Energy code compliance | 6/30/2006 | 7/3/2006 | 7/3/2006 | A | PART |
Tom Arcoraci
|
|
|
john; Phone #: ###-####/richard ###-#### quad 304 Internet Inspection Request from: Barbara Buckley 304 ok for cover
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 6/30/2006 | | |
|
|
|
|
BLD-Energy code compliance | 6/27/2006 | 6/27/2006 | 6/27/2006 | P | PART |
Tony Young
|
|
|
john - 1st quad; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley Quad #312 ok to cover
|
BLD-Framing/Rough-in | 6/27/2006 | 6/27/2006 | 6/27/2006 | P | PART |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley quad #304 ok to insulate
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 6/27/2006 | | |
|
|
|
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 6/27/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 6/22/2006 | 6/23/2006 | 6/23/2006 | A | PASS |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 6/21/2006 | 6/22/2006 | 6/22/2006 | A | CANC |
Tony Young
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 6/22/2006 | | |
|
|
|
|
BLD-Framing/Rough-in | 6/20/2006 | 6/21/2006 | 6/21/2006 | A | FAIL |
Mike Jordan
|
|
|
John King; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. needs to add double layer 5/8" typex above sheet metal plenum in hall way, and drop supply line out of floor/ceiling assembly or install two layers of 5/8" type X in between floor joist.
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 6/21/2006 | | |
|
|
|
conference only
|
OVERRIDE | | | 6/14/2006 | | |
|
|
|
|
OVERRIDE | | | 6/14/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 6/14/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/14/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/14/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/14/2006 | | DONE |
|
|
|
lft vm with ryan mccarne ###-#### that permit and fees are ready to be picked up
|
Override - Parcel Holds | | | 6/14/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 6/14/2006 | | DONE |
|
|
|
|
Routing - PLANNING | 6/8/2006 | | 6/13/2006 | | PASS |
|
|
|
Okay per CUP03-00114 Mod #4 by Hal Simmons.
|
Routing - PLAN CHECK | 6/13/2006 | | 6/13/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/13/2006 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 6/13/2006 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/13/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/13/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 3/30/2006 | | 6/13/2006 | | PASS |
|
|
|
6/13/2006 16:22:08 M_P - activity updated through activity BLDA022 from case BLD06-00769.
|
Routing - PLANNING Land Div | 6/2/2006 | | 6/8/2006 | | PEND |
|
|
|
Subject to approval of CUP modification. If CUP is modified, construction can be approved but Final Occupancy is subject to recordation of Amendment to Condominium Declaration of Ownership.
|
Routing - PLAN CHECK | 5/24/2006 | | 6/2/2006 | | |
|
|
|
Routing to Land Division.
|
Plan resubmittals received | | | 5/25/2006 | | |
|
|
|
Received 1 copy of 2 page letter for Plan review response, 1, copy of Fire Code Review, 3 Copies of the following A2.11, A2.12, A2.13, A2.21, A2.22, A4.10 and taken to Mike Phillips
|
Routing - PLAN CHECK | 5/11/2006 | | 5/24/2006 | | FAIL |
|
|
|
Second review failed, call architect and requested additoional informaiton be submitted. Items requested are 1). Delete stair to basement from stair enclosures. 2). Remove attic access from stair enclosure. 3). Change detail 8 on sheet A4.10, not to show 2 X's exposed within floor/ceiling assembly.
|
Routing - PLANNING | 5/19/2006 | | 5/22/2006 | | FAIL |
|
|
|
Need CU Modification
|
Routing - PLANNING Land Div | 5/22/2006 | | 5/19/2006 | | FAIL |
|
|
|
Need admended Condo plat.
|
Meeting | | | 5/19/2006 | | DONE |
|
|
|
5/19/06-Meeting w/owner, architect, Hal S., Dave A. and Marlene S. Determination made that the following are required prior to issuance of a building permit: a conditional use modification (staff level), recorded amended condo plat and recorded amended declaration for condo plat. Continue to process plans and if listed items are not completed by June 30, 2006 then permit to be voided. (msouthard)
|
Routing - FIRE | 5/8/2006 | | 5/11/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 4/13/2006 | | 5/8/2006 | | |
|
|
|
Routing to fire.
|
Plan resubmittals received | | | 5/1/2006 | | |
|
|
|
Received 1 response,2 structural calcs,1 bilding fire code review1 plan review report & 3 copys of sheets A0.11,A0.21,A0.22,A0.23,A2.11,A2.12,A2.13,A2.21,A2.22,A4.10,A7.11,A7.21,EN.11 taken to Mike P.
|
Routing - FIRE | 4/10/2006 | | 4/13/2006 | | FAIL |
|
|
|
Inserted Review comments into plans. Faxed resubmittal items to architect.
|
1st review completed | | | 4/13/2006 | | FAIL |
|
|
|
Failed Plan Check and Fire.
|
Routing - PLAN CHECK | 3/31/2006 | | 4/10/2006 | | FAIL |
|
|
|
Sent correction report to architect. Requesting additional information be submitted for further review prior to issuing permit.
|
Routing - PUBLIC WORKS | 3/30/2006 | | 3/31/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/28/2006 | | |
|
|
|
|
Application received | | | 3/27/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/27/2006 | | |
|
|
|
|
Fee Review-notes | 3/27/2006 | 3/27/2006 | | | |
|
|
|
|