Case Summary (BLD) | | | 11/25/2008 | | |
|
|
|
|
Third Notice BLD | 10/30/2007 | 10/30/2007 | 12/12/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 10/1/2007 | 10/1/2007 | 10/30/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 9/14/2007 | 10/1/2007 | | DONE |
|
|
|
|
BLD-Final | 9/13/2007 | 9/14/2007 | 9/14/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/13/2007 at 5:03:05 PM. Contact: ###-####.0k for perm occ
|
Permanent Occupancy | | | 9/14/2007 | | DONE |
|
|
|
|
BLD-Final | 12/28/2006 | 12/29/2006 | 12/29/2006 | P | PART |
Dave Hannah
|
|
|
paul ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for temp occ after all bonds have been posted ok for perm after all other trades final and restrooms and locker room are completed
|
FIRE-Final Inspection | 12/28/2006 | 12/29/2006 | 12/29/2006 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
Temporary occupancy | | | 12/29/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5505 issued 12-29-06 to Riverstone Community School for a gymnasium.
|
BLD-Final | 12/28/2006 | 12/29/2006 | 12/28/2006 | A | CANC |
Dave Hannah
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Patricia Smith
|
FIRE-Final Inspection | 12/28/2006 | 12/28/2006 | 12/28/2006 | P | NR |
Forrest France
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Final | 12/26/2006 | 12/27/2006 | 12/26/2006 | A | CANC |
Dave Hannah
|
|
|
paul ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Inspection cancelled from web by: Patricia Smith
|
BLD-Framing/Rough-in | 12/21/2006 | 12/21/2006 | 12/21/2006 | P | PART |
Dave Hannah
|
|
|
Paul Note: ceiling; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett ok to cover ceiling after all other trades sign off
|
BLD-Framing/Rough-in | 12/20/2006 | 12/20/2006 | 12/20/2006 | P | FAIL |
Dave Hannah
|
|
|
Paul; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett ceiling grid wires are out of plumb more than 1 in 6
|
FIRE-Conference | 12/19/2006 | 12/20/2006 | 12/20/2006 | A | DONE |
Forrest France
|
|
|
On site discussion regarding fire code review note requirements for fire lane marking at the looped access road.
|
BLD-Energy code compliance | 11/2/2006 | 11/2/2006 | 11/2/2006 | P | PASS |
Dave Hannah
|
|
|
paul ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith front office area
|
Telephone call | | | 10/31/2006 | | DONE |
|
|
|
Recieved fax request for fire department vehicle access roadway modification.
|
BLD-Framing/Rough-in | 10/27/2006 | 10/27/2006 | 10/27/2006 | P | PART |
Dave Hannah
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to insulate front area
|
BLD-Energy code compliance | 10/17/2006 | 10/17/2006 | 10/17/2006 | P | PART |
Dave Hannah
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Patricia Smith this finishes gym area
|
BLD-Energy code compliance | 10/13/2006 | 10/13/2006 | 10/13/2006 | P | PART |
Dave Hannah
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Patricia Smith gym area about 50 %
|
BLD-Framing/Rough-in | 10/6/2006 | 10/6/2006 | 10/6/2006 | P | PART |
Dave Hannah
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to insulate gem
|
BLD-Framing/Rough-in | 9/28/2006 | 9/29/2006 | 9/29/2006 | A | PART |
Dave Hannah
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley shear ok to cover ext
|
BLD-Framing/Rough-in | 9/21/2006 | 9/21/2006 | 9/21/2006 | P | PART |
Dave Hannah
|
|
|
paul Note: roof sheeting; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to cover roof and inside walls on mec area on roof
|
BLD-Foundation | 7/24/2006 | 7/24/2006 | 7/24/2006 | P | PASS |
Dave Hannah
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Letitia Gallop
|
Override - Condition Holds | 1/1/1900 | 1/1/1900 | 7/24/2006 | | |
|
|
|
|
BLD-Footing | 6/30/2006 | 7/5/2006 | 7/5/2006 | A | PASS |
Dave Hannah
|
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Footing | 6/29/2006 | 6/30/2006 | 6/30/2006 | A | PASS |
Mike Jordan
|
|
|
paul - 11 am pour; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Perimeter footings and center footing. Did note that special insp. is being performed.
|
Override - Condition Holds | 1/1/1900 | 1/1/1900 | 6/30/2006 | | |
|
|
|
|
Override - Condition Holds | 1/1/1900 | 1/1/1900 | 6/29/2006 | | |
|
|
|
|
(F) Reprint permit | | | 5/26/2006 | | |
|
|
|
|
Override - Condition Holds | | | 5/25/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/25/2006 | | DONE |
|
|
|
|
OVERRIDE | | | 5/24/2006 | | |
|
|
|
|
Plan assigned to (MLO) | 3/29/2006 | | 5/24/2006 | | PASS |
|
|
|
5/24/2006 10:26:36 MLO - activity updated through activity BLDA022 from case BLD06-00824.
|
Routing Off Site - STRUCTURAL | 5/17/2006 | | 5/24/2006 | | PASS |
|
|
|
Called Action Couriers for pick up
|
Routing - PLAN CHECK | 5/24/2006 | | 5/24/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/24/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/24/2006 | | DONE |
|
|
|
|
Telephone call | | | 5/24/2006 | | DONE |
|
|
|
lft vm with richard honsinger ###-#### that permit and fees are ready to be picked up needs ACHD and CG RCE #
|
Override - Condition Holds | | | 5/24/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 5/24/2006 | | |
|
|
|
|
Plan resubmittals received | | | 5/23/2006 | | |
|
|
|
Received 1 copy of cover transmittal letter, 2 copies of addressable fire alarm system, 2 copies of A1.11, E1.11, E2.1fl, E3.00 and taken to Mike Otto
|
Routing - PLUMBING | 5/17/2006 | | 5/18/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 5/18/2006 | | 5/18/2006 | | |
|
|
|
|
Plan resubmittals received | | | 5/17/2006 | | DONE |
|
|
|
received information for outstanding correction. MLO
|
Routing - PLAN CHECK | 5/17/2006 | | 5/17/2006 | | PEND |
|
|
|
pending structural approval
|
Routing - PLAN CHECK | 5/12/2006 | | 5/16/2006 | | FAIL |
|
|
|
corrections not completed, architect notified. MLO
|
Plan resubmittals received | | | 5/16/2006 | | |
|
|
|
Received 1 copy of cover transmittal and 2 copies of A1.11 and taken to Mike Otto
|
Plan resubmittals received | | | 5/12/2006 | | |
|
|
|
Receiveced 1 transmittal letter, 1 letter to Mike Otto, 3 supplemental structural calcs, 4 copies of the following sheets- A0.01, A0.02, A0.04; A0.06, A0.05, C-2, C-3, A2.11, A2.31, A2.51, A2.52, A4.21, A6.11, S4.0, M0.00, M0.01, M1.11, P1.11, FP1.11, E1.11, E2.11E, E2.11F1, E3.00 and taken to Mike Otto
|
Routing - PUBLIC WORKS | 5/4/2006 | | 5/4/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 4/28/2006 | | 5/2/2006 | | PASS |
|
|
|
DR requirements have been met.
|
Routing - PLAN CHECK | 5/2/2006 | | 5/2/2006 | | |
|
|
|
|
Routing - FIRE | 4/25/2006 | | 4/26/2006 | | PASS |
|
|
|
Faxed review comments to architect. Attached review comments to plans.
|
Plan resubmittals received | | | 4/26/2006 | | |
|
|
|
Received 1 copy of cover transmittal letter, 1 copy of comments letter, 1 copy of response letter, 1 copy of DR submittal, 1 copy of Dr submittal colored evaluations, 4 copies of A1.11 and taken to Mike Otto
|
1st review completed | | | 4/26/2006 | | FAIL |
|
|
|
Failed Structural, Planning and Plumbing.
|
Routing - PLAN CHECK | 4/26/2006 | | 4/26/2006 | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 3/29/2006 | | 4/25/2006 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLAN CHECK | 4/17/2006 | | 4/25/2006 | | FAIL |
|
|
|
corrections sent to architect.MLO
|
Plan resubmittals requested | | | 4/25/2006 | | DONE |
|
|
|
IBC corrections
|
Routing - PLANNING | 4/5/2006 | | 4/14/2006 | | FAIL |
|
|
|
DRH05-00429 Marty S CUP01-00068 (Angela W
DRH05-00429 (FAIL; Drawings do not comply with conditions of approval. Applicant was contacted via fax indicating required changes. Plans routed to A. Wood per CUP01-00068 on 4/11/06)CER
|
Routing - PLANNING | 4/14/2006 | | 4/14/2006 | | |
|
|
|
Use allowed per CUP: Site plan does differ from DR and CUP file (condition #6 requires sewer line investigation)
|
Routing - PLUMBING | 4/3/2006 | | 4/5/2006 | | FAIL |
|
|
|
provide a civil plan showing a 3" water service per plumbing plans.
|
Routing - Erosion and Sediment | 3/31/2006 | | 4/3/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 3/30/2006 | | 3/31/2006 | | FAIL |
|
|
|
Need approval from Barber Sewer; Need to provide TV logs of section they'll be connecting to to verify condition; connection to City sewer will be required once it's available. Contact Jim Pardy at ###-####
|
Routing - PLANNING Land Div | 3/30/2006 | | 3/30/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/29/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 3/29/2006 | | |
|
|
|
|
Application received | | | 3/29/2006 | | |
|
|
|
|
Pending Assignment by MYS | 3/29/2006 | | 3/29/2006 | | DONE |
|
|
|
3/29/2006 13:39:30 JCM - activity updated through activity BLDA174 from case BLD06-00824.
|
Recd Pcfee & Taken To Pln CK | | | 3/29/2006 | | |
|
|
|
|
Fee Review-notes | 3/29/2006 | 3/29/2006 | | | |
|
|
|
|