Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD06-00826
StatusFinaled
Name MELANIE NEAL (TEN REP)
Site Address 1517 N 13TH ST
Project NameEUPHORIA SALON
Customer Number 
ePlanReviewNo
Description
(NO CONTRACTOR REGISTRATION PROVIDED.APPLICANT CERTIFIES EXEMPTION PER IDAHO STATUE 54-5205) (EUPHORIA SALON - HYDE PARK) This building is NOT fire sprinklered. To remodel an existing 1,230 square foot tenant space for use as a hair salon. Work is to include interior nonbearing walls, a restroom accessible to the disabled, landings at doors, an interior ramp, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD7/7/20067/7/20068/11/2006 DONE
First Notice has not been responded to.
First Notice 6/8/20067/7/2006 DONE
Permanent occupancy UNPAID FEE  6/8/2006 DONE
Perm. Occ. Cert. # 11066 issued 6-8-06 to the Euphoria Salon in Hyde Park.
BLD-Final6/6/20066/7/20066/7/2006APASS
DetailsDave Hannah
melonie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Final6/6/20066/7/20066/7/2006APASS
DetailsDave Hannah
melanie ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for perm occ
Permanent Occupancy 6/7/20066/7/2006 DONE
Details
FIRE-Final Inspection6/6/20066/6/20066/6/2006PPASS
DetailsForrest France
Items on correction notice have been completed, inspection passed.
BLD-Final6/2/20066/5/20066/5/2006PNR
DetailsTony Young
melanie - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
need trades 1st
FIRE-Final Inspection6/2/20066/5/20066/5/2006AFAIL
DetailsForrest France
Need to provide current annual inspection tags for the fire extinguishers, provide automatic flush bolts for the inactive leaf at the back exit doors, provide approved hardware at the main entry/exit door (remove the manual thumbturn and door knob).
BLD-Conference5/11/20065/12/20065/12/2006APASS
DetailsDave Hannah
melody; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  4/26/2006 DONE
Telephone call  4/25/2006 DONE
tlk to pat mckeegan###-#### that permit and fees are ready to be picked up and needs GC and RCE #
Permit Ready to Issue  4/25/2006  
Print Occupancy Form  4/24/2006 DONE
Routing - PLAN CHECK4/17/2006 4/21/2006 PASS
Approved after resubmittal review.
Plan resubmittals received  4/21/2006  
received 2 a1.0 sheets & letter from patrick mckeegan arch & taken to plan check
PLANS/APPL TAKEN TO FRONT DESK  4/21/2006 DONE
Plan assigned to (CJW)3/30/2006 4/21/2006 PASS
4/21/2006 15:02:38 CJW - activity updated through activity BLDA022 from case BLD06-00826.
Routing - FIRE4/13/2006 4/17/2006 PASS
Attached review comments to plans. Faxed comments to architect.
1st review completed  4/17/2006 FAIL
Failed Plan Check
Routing - PLAN CHECK3/31/2006 4/13/2006 FAIL
The IBC plan review was started on April 12, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS3/30/2006 3/31/2006 PASS
Application received  3/29/2006  
Pending Assignment by MYS3/29/2006 3/29/2006 DONE
3/29/2006 12:08:09 DLD - activity updated through activity BLDA165 from case BLD06-00826.
Recd Pcfee & Taken To Pln CK  3/29/2006  
Plans ACCEPTED BY PLAN TECH  3/29/2006  
Fee Review-notes3/29/20063/29/2006