Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00840
StatusFinaled
Name MAGNUM CONTRACTORS
Site Address 11769 W ARDYCE ST
Project Name 
Customer Number 
ePlanReviewNo
Description
""11/28/07 " PLANS SUBMITTED BY NEW CONTRACTOR WITH LETTER CONVEYING PERMIT TO SAME. REVIEW OF PLANS DONE REQUIRING 1/2 ORIGINAL PLAN REVIEW FEE AND ATTACHED PLAN REVIEW NOTES. PEP 11.28/07""To construct a 2716sq.ft. Two story single family dwelling (2135sq.ft. First floor / 581sq.ft. second floor bonus room) with a 78sq.ft. Covered front porch, and a 822sq.ft. Attached garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the city of Boise. R-1C zoning and setbacks as per Thomas Curren with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/29/20085/30/20085/30/2008PPASS
DetailsTom Arcoraci
Dale; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt co issued
DOC - Permit Finaled5/30/20085/30/20085/30/2008PPASS
DetailsTom Arcoraci
BLD-Energy code compliance1/16/20081/17/20081/17/2008APASS
DetailsJim Sly
shane - insulation Phone #: ###-####
BLD-Framing/Rough-in1/11/20081/14/20081/14/2008APASS
DetailsJim Sly
shane Phone #: ###-####
Routing Walk-In (BLD)11/28/200711/28/200711/29/2007APASS
Case Summary (BLD)  11/28/2007  
Inspection Record Card- Bld  11/28/2007  
Plan Reviewer's activity  11/28/2007 DONE
MISC ACTIONS  11/28/2007 DONE
change GC from Echeverria to Magnum Construction, see scanned letter
Case Summary (BLD)  11/14/2007  
Case Summary (BLD)  11/14/2007  
Telephone call  11/13/2007 DONE
Returned a phone call to Rachel with Keller Williams. No plans kept at city. (SRZ)
Telephone call  8/27/2007 DONE
phone call from Sarah w/Capital Bldg Company, said they are taking over job. Told her need letter stating Echeverra signs permit over to Capital Bldg Co.
BLD - Request for Extension5/14/20075/15/20075/15/2007 DONE
DetailsJim Sly
not quite ready for final like to extend the permit please per brad - ###-####
OK for Ext. WIP.
BLD-Foundation5/1/20065/1/20065/1/2006PPART
DetailsMike Jordan
Phone #: ###-#### Internet Inspection Request from: Rita DeYoungwip
BLD-Foundation4/28/20065/1/20065/1/2006PCANC
DetailsMike Jordan
Phone #: ###-#### - move inspection to PM Internet Inspection Request from: Cathy Chiles
BLD-Footing4/27/20064/28/20064/28/2006ACANC
DetailsJim Sly
bob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing4/28/20064/28/20064/28/2006PCANC
DetailsJim Sly
cal ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
Issue PAID IN FULL permit  4/25/2006 DONE
Plan assigned to (SRZ)4/13/20064/13/20064/14/2006 PASS
4/14/2006 10:46:16 SRZ - activity updated through activity BLDA022 from case BLD06-00840.
Case Summary (BLD)  4/14/2006  
PLANS/APPL TAKEN TO FRONT DESK  4/14/2006 DONE
Inspection Record Card- Bld  4/14/2006  
Permit Ready to Issue  4/14/2006  
Telephone call  4/14/2006 DONE
called ###-#### and told Louise that permit is ready and fee
Routing - PLAN CHECK4/4/2006 4/14/2006 PASS
Plan assigned to (SAM)3/30/20063/30/20064/13/2006 DONE
Routing - PUBLIC WORKS4/4/2006 4/4/2006 PASS
Routing - PLANNING3/30/2006 4/3/2006 PASS
Application received  3/30/2006