Case Summary (BLD) | | | 1/4/2013 | | DONE |
|
|
|
|
Third Notice BLD | 2/22/2007 | 2/22/2007 | 5/2/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 2/7/2007 | 2/7/2007 | 2/22/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 1/25/2007 | 2/7/2007 | | DONE |
|
|
|
|
BLD-Final | 1/24/2007 | 1/25/2007 | 1/25/2007 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Cathy Chilesfinal ok
|
Permanent Occupancy | | 1/25/2007 | 1/25/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/25/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11410 issued 1-25-07 to the Jackson Jet Center.
|
Code Occupancy Approval | 1/24/2007 | 1/24/2007 | 1/24/2007 | A | PASS |
Dena Gambrel
|
|
|
1-24-07 Outside painting completed.
|
Reopen Permit (ISS) | | | 1/24/2007 | | DONE |
|
|
|
the final was not final stated NR in permit needs to be open for more inspections
|
BLD-Final | 12/12/2006 | 12/13/2006 | 12/13/2006 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/12/2006 at 5:12:21 PM.
|
Code Occupancy Approval | 12/13/2006 | 12/13/2006 | 12/13/2006 | P | FAIL |
Dena Gambrel
|
|
|
12-13-06 Failed. Outside painting not complete. They will get me a bid to finish the painting and then post a bond.
|
BLD-Final | 12/11/2006 | 12/12/2006 | 12/12/2006 | P | CANC |
Jim Storey
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Final | 11/16/2006 | 11/17/2006 | 11/17/2006 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/16/2006 at 2:05:05 PM. Contact: ###-####.life saftey ok for temp occ.
|
FIRE-Final Inspection | 11/16/2006 | 11/17/2006 | 11/17/2006 | A | PASS |
Forrest France
|
|
|
Life safety is acceptable, temp. occupant load signs to be replaced with permanent ASAP per contractor, exit discharge lighting at exterior canopies to be completed when construction of the canopies is finished.
|
BLD-Other | 11/1/2006 | 11/2/2006 | 11/2/2006 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/1/2006 at 5:52:34 PM. Ceiling grid ok. Needs to repair elec. penetrations on west 2hr. wall above grid.
|
BLD-Framing/Rough-in | 10/20/2006 | 10/23/2006 | 10/23/2006 | A | NR |
Jim Storey
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 10/13/2006 | 10/16/2006 | 10/16/2006 | A | PART |
Jim Storey
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles water heater ok per engineering/ strucralsteel must be removed for colum wrap and need conection details.
|
Plan resubmittals received | | | 10/5/2006 | | DONE |
|
|
|
Received additional engineering design and calculations for the 50 gallon water heater on top of the restroom ceiling. Copy forwarded to Building Inspector and a copy provided to Records.
|
BLD-Framing/Rough-in | 10/2/2006 | 10/3/2006 | 10/3/2006 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/2/2006 at 3:20:24 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 9/20/2006 | 9/21/2006 | 9/21/2006 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/20/2006 at 4:04:11 PM. bolt 5 ply lvl/ soport 2 ply lvl/
|
Plan resubmittals received | | | 9/21/2006 | | PASS |
|
|
|
Received a small addendum changed at the single use restroom. This addendum change is approved and a copy has been provided to the Inspector and dropped off in the Records Department.
|
BLD-Framing/Rough-in | 8/18/2006 | 8/21/2006 | 8/21/2006 | A | PASS |
Jim Storey
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ceilling sys. ok to complet progression.
|
BLD-Footing | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | PASS |
Tom Arcoraci
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
Plan Reviewer's activity | | | 7/21/2006 | | DONE |
|
|
|
Architect provided an addendum showing two new window openings in a 2-hour rated fire wall. On the hanger side one and one half hour rated coiling counter fire doors will be installed. A copy of info. provided in Inspectors box and scanned into records.
|
BLD-Framing/Rough-in | 7/19/2006 | 7/20/2006 | 7/20/2006 | A | PART |
Mike Jordan
|
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Inspected new 2hr seperation wall, at east end seperating east hangar from lobby area. Also verified 5/8 on bottom of roof deck for a distance of 4ft at east hangar. Contracot to supply spec shhets for hilti firecaulking for penetrations. Also noted that existing wall seperating the west hangar area from the office area will need to be replaced, will not meet 2hr. wall seperation requirements. Also inspected ceiling framing for new 2hr. ceiling.
|
Plan resubmittals received | | | 7/10/2006 | | |
|
|
|
Received 1 transmittal letter, 1 2-hr wall section,1 spec on fire doors, & 2 copys of sheet A-1.5 taken to Jason B.
|
Plan Reviewer's activity | | | 6/13/2006 | | PASS |
|
|
|
Addendum provided showing draft stop locations. Copy provided in the field, copy provided to the Building Inspector, and a copy provided into the Records Division.
|
Issue PAID IN FULL permit | | | 6/5/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/2/2006 | | DONE |
|
|
|
Several faxes received concerning issues talked about on the phone.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/2/2006 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 6/2/2006 | | |
|
|
|
|
Case Summary (BLD) | | | 6/2/2006 | | |
|
|
|
|
Print Occupancy Form | | | 6/2/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/2/2006 | | |
|
|
|
tlk to cindy king ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 6/2/2006 | | |
|
|
|
|
Plan assigned to (JCB) | 4/3/2006 | | 6/2/2006 | | PASS |
|
|
|
6/2/2006 14:38:06 JCB - activity updated through activity BLDA022 from case BLD06-00842.
|
Routing - PLAN CHECK | 5/16/2006 | | 6/2/2006 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
Plan Reviewer's activity | | | 6/1/2006 | | DONE |
|
|
|
Talked with Jim Glancey. Need a new updated Certificate of Value, an MIS Occupancy application for adjacent hangar, more spiral stairway information, and manuevering clearance at unisex restroom/bathing room door. Faxed MIS Occupancy application to him. I am continuing the review of the resubmittals and will contact the architect as other issues/items come up for clarification or needing to be addressed.
|
Plan resubmittals received | | | 5/25/2006 | | DONE |
|
|
|
Received 1transmittal,1 letter to Jason B. ,1 letter to Cindy,1 project start up, 2 hvac load analysis,2 plan review comment response, & 2 copys of sheetsA-0.1EC-1,A-0.1,A-1.1,A-1.1,A-1.2,A-1.35,A-1.45,A-1.5,A-1.6,A-1.7,A-2.1,A-3.1A-3.2,A-3.2.1,A-3.3,A.3.4,A-3.5,A-3.6,A-3.7,A-3.8,A-3.9,A-4.1,A-4.2,A-4.3,A-4.4,A-6.1,P-1.0,P-2.0,M-1.0,M-2.0,M-3.0,M-4.0,DE1.0,E-1.0,E-2.0,E-3.0,E-4.0,EC-1.1,EC1.2 Taken to Jason B.
|
Telephone call | | | 5/25/2006 | | DONE |
|
|
|
Called Cindy to let her know there can be no waiver of accessibility requirements on the unisex restroom/shower room. Plan Review Manager and Building Official confirmed this.
|
Routing - FIRE | 5/12/2006 | | 5/16/2006 | | PASS |
|
|
|
Faxed review comments to Cindy King. Attached review comments to plans.
|
1st review completed | | | 5/16/2006 | | FAIL |
|
|
|
Failed Plan Check
|
Case Summary (BLD) | | | 5/13/2006 | | |
|
|
|
|
Plan Reviewer's activity | | | 5/12/2006 | | DONE |
|
|
|
Project changed to a green tag/priority project per the Mayor's office through the Economic Development Division.
|
Plan resubmittals requested | | | 5/12/2006 | | DONE |
|
|
|
Plan resubmittals and written response required for further review.
|
Routing - PLAN CHECK | 4/11/2006 | | 5/12/2006 | | FAIL |
|
|
|
Plan review e-mailed and faxed to architect. Numerous items to address. A written response and plan resubmittals are required for further review. Plans to route to the Fire Dept. for review.
|
Plan Reviewer's activity | | | 5/10/2006 | | DONE |
|
|
|
Talked with Cindy to have her fax over an enlarged detail for the top of the new proposed fire wall to be forwarded to the Building Official. Approval of fire wall design is pending.
|
Telephone call | | | 5/10/2006 | | DONE |
|
|
|
Some telephone calls back and forth with the Architect concerning the Type of Construction of the building. The building is on record as a Type V-1hr. rated building but it sounds like it may not meet that. For the Occupancy Use, the building should be a V-A (1-hr. rated) building or sprinklered.
|
Routing - PLANNING | 4/10/2006 | | 4/11/2006 | | PASS |
|
|
|
Sarah Schafer CZC06-00026
Meets conditions of CZC06-00026.
|
Routing - PUBLIC WORKS | 4/6/2006 | | 4/10/2006 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 4/10/2006 | | 4/10/2006 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Plans ACCEPTED BY PLAN CHECK | | | 4/6/2006 | | PASS |
|
|
|
Received ESC application & waiver letter, created ESC case and began routing. (msouthard)
|
Application received | | | 3/30/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/30/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/30/2006 | | FAIL |
|
|
|
Need ESC application and waiver letter. Called Cindy King at Glancey Rockwell and she is to send in info.
|
Fee Review-notes | 3/30/2006 | 3/30/2006 | | | |
|
|
|
|