BLD-Final | 5/25/2007 | 5/25/2007 | 5/25/2007 | P | PART |
Mike Jordan
|
|
|
daryl - please call for access ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Everything ok. Needs to have permit revised to include the basement being finished instead of unfished. Did leave contractor C.O. Contractor was contacted and noted that he would go down and have permit revised. Reschedule and I will final permit in computer.
|
BLD-Grading Inspection | 5/25/2007 | 5/25/2007 | 5/25/2007 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Conference | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | NR |
Tony Young
|
|
|
Darrell; Phone #: ###-#### need hillside signed off
|
BLD-Final | 4/30/2007 | 4/30/2007 | 5/1/2007 | P | NR |
Tony Young
|
|
|
darrell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles need elec 1st and hillside first
|
BLD-Energy code compliance | 1/12/2007 | 1/12/2007 | 1/12/2007 | P | PASS |
Jim Sly
|
|
|
daryl - insulation - after 2:00 please ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Frame pass
|
BLD-Framing/Rough-in | 1/10/2007 | 1/10/2007 | 1/10/2007 | P | PASS |
Jim Sly
|
|
|
darby; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
Inspection Record Card- Bld | | | 1/3/2007 | | |
|
|
|
|
(F) Reprint permit | | | 1/3/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 1/3/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/3/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/27/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/22/2006 | | DONE |
|
|
|
I spoke with Arron and requested a Permit transfer document signed and notarized by the original permit holder consenting to the transfer itself. I then requested her to call back next week and speak with Rita about the fees. (SRZ)
|
(F) Reprint permit | | | 12/19/2006 | | DONE |
|
|
|
|
BLD-Conference | 12/15/2006 | 12/15/2006 | 12/17/2006 | P | PASS |
Tony Young
|
|
|
Conference on job status per Terry Records request, new contractor,, may need to change????--- looked at setbacks,, appear ok--- frame walk through also
|
BLD-Foundation | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | PART |
Tony Young
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley wip
|
BLD-Foundation | 7/31/2006 | 8/1/2006 | 8/1/2006 | A | NR |
Tom Arcoraci
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 6/13/2006 | 6/13/2006 | 6/13/2006 | P | PART |
Tony Young
|
|
|
MATT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles c/n posted,, ok to pour at own risk,, need plans to show as built w/ engineering for foundation,, should not matter much for ftgs
|
BLD-Footing | 6/9/2006 | 6/12/2006 | 6/12/2006 | P | NR |
Tony Young
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 6/5/2006 | 6/6/2006 | 6/7/2006 | P | NR |
Tony Young
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PubWorks Subgrade Approval | 6/7/2006 | 6/7/2006 | 6/7/2006 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 4/28/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/27/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/27/2006 | | DONE |
|
|
|
|
Telephone call | | | 4/27/2006 | | DONE |
|
|
|
called ###-#### and told him that permit is ready and fee
|
Plan assigned to (SAM) | 3/31/2006 | 4/25/2006 | 4/26/2006 | | PASS |
|
|
|
4/26/2006 14:55:14 SAM - activity updated through activity BLDA022 from case BLD06-00855.
|
Routing - PLAN CHECK | 4/11/2006 | | 4/26/2006 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 4/26/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2006 | | DONE |
|
|
|
|
Routing - FIRE | 4/6/2006 | | 4/10/2006 | | PASS |
|
|
|
This house requires an NFPA 13D automatic fire sprinkler system, modified by the installation of a single row of dry sidewall sprinklers along the walls, common to attached garages and living spaces. (Quail Ridge # 9 subdivision)
|
Routing - Erosion and Sediment | 4/5/2006 | | 4/6/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 4/4/2006 | | 4/5/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 4/4/2006 | | 4/4/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 3/31/2006 | | 4/4/2006 | | PASS |
|
|
|
Approved as Category 1 by CFH06-00004
|
Application received | | | 3/31/2006 | | |
|
|
|
|