Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00856
StatusFinaled
Name MISSION DEVELOPMENT LLC
Site Address 11455 W GRANGER ST
Project Name 
Customer Number 
ePlanReviewNo
Description
CONTRACTOR EONZALO POSADA C REGISTRATION # RCE-2613 To construct a 3045sq.ft. Two story single family dwelling (1725sq.ft. Main floor / 1320sq.ft. Upper floor) with a 38sq.ft. Covered front porch, a 117sq.ft. Covered rear patio, and a 698sq.ft. Attached garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by Boise city. R-1C zoning and setbacks as per S.H. with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/31/200611/1/200611/1/2006APASS
DetailsJim Sly
gonzalo; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
c/c issued
DOC - Permit Finaled11/1/200611/1/200611/1/2006PPASS
DetailsJim Sly
BLD-Final10/31/200610/31/200610/31/2006PCANC
DetailsForrest France
Gonzalo, reinspect = ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt nOTE INSPECTOR TO ASK TO CANCEL
BLD-Final10/13/200610/16/200610/16/2006ANR
DetailsJim Sly
gonzalo; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Energy code compliance6/6/20066/6/20066/6/2006PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/6/2006 at 8:48:52 AM.
BLD-Framing/Rough-in6/5/20066/5/20066/5/2006PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/5/2006 at 8:07:05 AM. Contact: ###-####.
BLD-Footing4/28/20064/28/20064/28/2006APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/28/2006 at 6:15:04 AM. Contact: ###-####.
Foot and wall OK
BLD-Footing4/27/20064/27/20064/27/2006APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/27/2006 at 6:38:10 AM. Contact: ###-####.
Issue PAID IN FULL permit  4/19/2006 DONE
Plan assigned to (SRZ)4/18/20064/18/20064/18/2006 PASS
4/18/2006 13:07:45 SRZ - activity updated through activity BLDA022 from case BLD06-00856.
Plan assigned to (SAM)3/31/20063/31/20064/18/2006 DONE
Routing - PLAN CHECK4/7/2006 4/18/2006 PASS
Case Summary (BLD)  4/18/2006  
Inspection Record Card- Bld  4/18/2006  
PLANS/APPL TAKEN TO FRONT DESK  4/18/2006 DONE
Telephone call  4/18/2006 DONE
tlk to mission deve ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  4/18/2006 DONE
Routing - PLANNING3/31/2006 4/7/2006 PASS
called to request more info to measure driveway setback from side st./Arch will call Additonal site plan information provided 4/6/2006. Driveway location complies with 50 setback from street. TAC
Routing - PUBLIC WORKS4/7/2006 4/7/2006 PASS
Application received  3/31/2006