Permit Information
Permit NumberBLD06-00879
StatusFinaled
Name FALASH & ROSS CONSTRUCTION
Site Address 1010 W JEFFERSON ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(Falash & Ross Const. RCE-2502) (1010 W JEFFERSON ST - BUILDING RENOVATION) Only the basement of this building is fire sprinklered. To renovate an existing 2 story with basement building (8,405 square foot basement, 8,622 square foot 1st story, 8,718 square foot 2nd story) and to create two office tenant spaces (939 square feet and 2,688 square feet) on the 1st story. Work is to include 6 restrooms accessible to the disabled, an elevator shaft and elevator, a tunneled 1-hr corridor on the 1st story, 45 minute windows in the wall parallel to the alley, new guard and handrails at the exterior stairway to the basement, an EIFS at the elevator shaft, and suspended ceilings. This permit is NOT intended to establish a Certificate of Occupancy for any tenant. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system in the basement shall be maintained in compliance with NFPA 13 as regulated by the Fire Department. DRH06-00075 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes4/3/20064/3/20064/3/2007 DONE
Third Notice BLD4/2/20074/2/20074/2/2007 DONE
Second Notice has not been responded to.
Second Notice BLD3/21/20073/21/20074/2/2007 DONE
First Notice has not been responded to.
Telephone call  3/27/2007 DONE
call to schindler elevator to call and confirm fv
Telephone call  3/27/2007 DONE
call to mary w/ tri-state to confirm fv on this job
First Notice3/1/20073/1/20073/21/2007 DONE
DetailsDave Hannah
FIRE-Final Inspection3/1/20073/1/20073/1/2007PPASS
DetailsForrest France
Corrections are complete, fire life safety passed inspection.
BLD-Final2/28/20073/1/20073/1/2007PPASS
DetailsDave Hannah
greg; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
DOC - Permit Finaled3/1/20073/1/20073/1/2007PPASS
DetailsDave Hannah
BLD-Final2/23/20072/26/20072/26/2007ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/23/2007 at 7:36:30 PM. Contact: ###-####. ok for c.c after other trades final
BLD-Final2/21/20072/22/20072/22/2007PFAIL
DetailsDave Hannah
Please contact Greg Bolton prior to going out. Thank You Phone #: ###-#### need 90 min fire door in basement and lever door hardware in basement exit doors
BLD-Other2/21/20072/22/20072/22/2007APASS
DetailsForrest France
Shell and core life safety is satisfactory, inspection passed. Noted door hardware at three locations in the basement to be changed prior to tenant occupancy approval.
BLD-Framing/Rough-in12/1/200612/1/200612/4/2006PPART
DetailsDave Hannah
Please contact Grge Bolton prior to going out. ###-####; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to cover rest rooms in basement
BLD-Framing/Rough-in9/22/20069/22/20069/22/2006PPART
DetailsDave Hannah
If you have any questions please contact Greg Bolton at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson second floor
BLD-Other8/31/20069/1/20069/6/2006PDONE
DetailsDave Hannah
This is for a Structural Final inspection. If you have any questions please call Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
BLD-Other8/31/20069/1/20069/1/2006AFAIL
DetailsForrest France
Need to provide approved exiting hardware at two exterior doors from the common corridor on the first floor, restrooms on the 2nd floor and basement level are not completed as indicated on work scope, the elevator is not installed at this time, project related fire alarm permit must be finaled prior to BLD permit final approval pending completion of duct detection and elevator controls.
BLD-Other8/29/20068/30/20068/30/2006AFAIL
DetailsForrest France
Scope of work is not completed at this time including some restrooms, elevator and shaft, some fire alarm work, existing fire sprinkler system needs a current annual inspection, project is not ready for final life safety inspection.
BLD-Other8/28/20068/28/20068/28/2006PPART
DetailsDave Hannah
This is for a ceiling inspection. If you have any questions please contact Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to cover
BLD-Other8/18/20068/21/20068/22/2006PNR
DetailsDave Hannah
craig Note: ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Override - Parcel Holds1/1/19001/1/19008/18/2006  
BLD-Framing/Rough-in8/14/20068/15/20068/15/2006APART
DetailsDave Hannah
###-#### greg elev shaft ok to cover
Override - Parcel Holds  8/14/2006  
BLD-Framing/Rough-in7/6/20067/7/20067/7/2006APART
DetailsDave Hannah
If you have any questions please contact Greg Bolton at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to cover shafts on 1st floor
BLD-Framing/Rough-in7/5/20067/6/20067/6/2006AFAIL
DetailsDave Hannah
If you have any questions please contact Greg Bolton at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson fire dampers need openings around them on inside shaft wall sealed up
BLD-Framing/Rough-in6/29/20066/30/20066/30/2006APART
DetailsDave Hannah
If you have any questions please call Greg Bolton at ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to keep working on shaft and corr on first floor
BLD-Framing/Rough-in6/28/20066/29/20066/29/2006PPART
DetailsDave Hannah
Please call Greg Bolton with any questions. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to start onesiding main floor and working on shafts need to seal up floor penetrations
BLD-Footing6/26/20066/27/20066/28/2006APASS
DetailsDave Hannah
Please schedule for 11:30am. If you have any questions please call Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson this was for the elev pit walls
BLD-Framing/Rough-in6/26/20066/27/20066/27/2006PNR
DetailsTony Young
If you have any questions please call Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
BLD-Footing6/20/20066/21/20066/21/2006APASS
DetailsMike Jordan
They will be pouring at 11am. If you have any questions please call Greg Bolton @ ###-####. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson. elevator pit.
BLD-Framing/Rough-in6/19/20066/20/20066/20/2006APART
DetailsTony Young
If you have any questions please call Greg Bolton ###-####; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson
still need revision from architect to change mechanical room /shaft assy to 2hr assembly for our records,,verified 3 layers of rock on west mech room,, will have to re-do door frame attachment per listing,, also verified ul listing #412 for 2 hr non-bearing wall in mech room.
BLD-Framing/Rough-in6/9/20066/12/20066/12/2006ANR
DetailsTony Young
greg - call 1/2 hr prior to insp for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
conf on firewalls,, need listings,, I am in a loaner truck w/out all my info,, they are working on a revision to plans for a two hour shaft assembly
Issue PAID IN FULL permit  5/18/2006 DONE
Inspection Record Card- Bld  5/17/2006 DONE
Telephone call  5/17/2006  
called ###-#### and left voicemessage for Sam Burrows that permit is ready and fee
Permit Ready to Issue  5/17/2006  
Plan assigned to (CJW)4/6/2006 5/15/2006 PASS
5/15/2006 14:38:48 CJW - activity updated through activity BLDA022 from case BLD06-00879.
Routing - PLAN CHECK4/24/2006 5/15/2006 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  5/15/2006 DONE
Plan resubmittals received  5/12/2006  
Received 1 letter to Carl W, 2 copies of each of the following sheets- 0.0, A0.1, A2.0, A2.1, A2.3, A2.4, A2.4A, A3.0, A3.1, A5.0, A6.1, A6.2, A6.3, A8.0, A8.1, A9.0,, A9.1, M1.0, M1.1, M1.2, E1.0, E2.0, E3.0, EC1.0 and taken to Carl Westfall
1st review completed  4/24/2006 FAIL
Failed Plan Check.
Routing - FIRE4/21/2006 4/24/2006 PASS
Attached review comments to plans.
Routing - PLANNING4/21/2006 4/21/2006 PASS
Approved per DRH06-00075: Sarah Schafer
Routing - PLAN CHECK4/10/2006 4/20/2006 FAIL
The IBC plan review was started on April 17, 2006 and was finished on April 20, 2006. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS4/20/2006 4/20/2006 DONE
Sent back to PW for revision of sewer fee paper work and for addressing tenant spaces.
Plan resubmittals received  4/19/2006  
received (4) t i. applications one for idaho water, one for shell & core at 1010 jefferson, one for barker, rosholt, & simpson-taken to carl westfall
Plan Reviewer's activity  4/19/2006 DONE
Accepted permit applications for the 2 proposed tenant spaces shown on the submitted drawings.
Routing - PUBLIC WORKS4/6/2006 4/10/2006 PASS
Routing - Erosion and Sediment4/10/2006 4/10/2006 PASS
ESC waiver request approved with attached conditions.
Pending Assignment by MYS4/3/2006 4/6/2006 DONE
4/6/2006 12:09:33 MYS - activity updated through activity BLDA172 from case BLD06-00879.
Plans ACCEPTED BY PLAN TECH  4/4/2006  
Recd Pcfee & Taken To Pln CK  4/3/2006  
Application received  4/3/2006