Case Summary (BLD) | | | 2/27/2009 | | |
|
|
|
|
Fee Review-notes | 4/4/2006 | 4/4/2006 | 2/6/2007 | | DONE |
|
|
|
|
Third Notice BLD | 1/8/2007 | 1/8/2007 | 1/25/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 1/25/2007 | | DONE |
|
|
|
call kay howard about the differences and he will call me when get in his office 11:30 am
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/17/2006 | 12/27/2006 | | DONE |
|
|
|
|
BLD-Final | 11/16/2006 | 11/17/2006 | 11/17/2006 | A | PASS |
Tom Arcoraci
|
|
|
kay; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Permanent Occupancy | | 11/17/2006 | 11/17/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 11/17/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11303 issued 11-17-06 to Intermountain Hospital.
|
Code Occupancy Approval | | | 11/15/2006 | | PASS |
|
|
|
ALL IN FINAL OK
|
BLD-Final | 11/9/2006 | 11/9/2006 | 11/9/2006 | P | NR |
Tom Arcoraci
|
|
|
kay; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Final Inspection | 11/8/2006 | 11/9/2006 | 11/9/2006 | A | PASS |
Forrest France
|
|
|
Final fire life safety inspeciton passed, contractor to replace missing ceiling tile and sprinkler escutcheon at the data closet prior to occupancy as agreed.
|
BLD-Aging Inspection | 9/29/2006 | 9/29/2006 | 9/29/2006 | | NR |
Tom Arcoraci
|
|
|
|
Print Pending Permit.LaserJet4 | | | 8/9/2006 | | |
|
|
|
|
Case Summary (BLD) | | | 8/9/2006 | | |
|
|
|
|
Telephone call | | | 8/9/2006 | | DONE |
|
|
|
Recieved call from Kay Howard. The requirements for the 2-hour fire wall to extend 30" above the roof per original State of Idaho had been modified on 8-1/2" x 11" sheets as part of review documents. The 2-hour wall was modified to extend to the bottom of the roof deck per 2003 IBC Sec. 705.6, Exception #2 on existing building side and exception #4 on the new building side. Content of permit modified to reflect these changes.
|
Plan Reviewer's activity | | | 8/9/2006 | | DONE |
|
|
|
Modified content of building permit to reflect approvals by State of Idaho changing the 30" extension of the 2-hour fire wall above the roof between the existing and new buildings and the use of 2003 IBC Sec. 705.6, exceptions #2 at existing roof and exception #4 at new roof. Copy of modified permit with copy of state plans for this approval placed in Tom arcoraci, Structural Inspector, in-box and additional copy to attach to approved plans at project site. Called Tom to let him know of changes and documents in his in-box.
|
BLD-Framing/Rough-in | 6/16/2006 | 6/19/2006 | 6/19/2006 | A | DEFR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/15/2006 at 4:26:27 PM. Contact: ###-####. State of Idaho has inspected the 2hr. wall seperating the new unit from the old unit. State will also be inspecting 1hr corridors. Modular units are already assembeled when on site. noted to contractor that copies of inspections and tags will be required at bldg. final. Did note that 2hr wall is not yet extended the min 18" horizintally or the 30" inches vertically as noted on permit and approved plans. Could not verify if 2hr. wall extetnds to footing.
|
BLD-Framing/Rough-in | 6/15/2006 | 6/16/2006 | 6/16/2006 | P | DEFR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/15/2006 at 4:26:27 PM. Contact: ###-####. out of time rolled to monday am.
|
BLD-Foundation | 6/8/2006 | 6/9/2006 | 6/9/2006 | A | DONE |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/8/2006 at 1:29:40 PM. interior footings, ne end, already placed when arrived on site. NO INSPECTION WAS PERFORMED.
|
BLD-Footing | 6/6/2006 | 6/6/2006 | 6/6/2006 | P | PART |
Dave Hannah
|
|
|
bill - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to pour ext ftgs
|
Override - Condition Holds | 1/1/1900 | 1/1/1900 | 6/6/2006 | | |
|
|
|
already paid
|
(F) Reprint permit | | | 5/23/2006 | | |
|
|
|
|
Override - Condition Holds | | | 5/22/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/22/2006 | | DONE |
|
|
|
|
OVERRIDE | | | 5/9/2006 | | |
|
|
|
|
Telephone call | | | 5/9/2006 | | DONE |
|
|
|
called ###-#### and told Kay that permit is ready, fees, need RP and grading permit Bld06-00778 needs to be picked up before can issue this one
|
Override - Condition Holds | | | 5/9/2006 | | |
|
|
|
|
Permit Ready to Issue | | | 5/9/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/7/2006 | | 5/8/2006 | | PASS |
|
|
|
To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2006 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 5/8/2006 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 4/5/2006 | | 5/8/2006 | | PASS |
|
|
|
5/8/2006 06:42:40 DRS - activity updated through activity BLDA022 from case BLD06-00895.
|
Routing - PLANNING | 5/2/2006 | | 5/7/2006 | | PASS |
|
|
|
Revised elevations meet the DR and CU requirements.
|
Routing - PLUMBING | 5/1/2006 | | 5/2/2006 | | PASS |
|
|
|
Routed to planning.
|
Routing - PLUMBING | 5/1/2006 | | 5/2/2006 | | PASS |
Lee Rice
|
|
|
Civil approved per plan and 2003 UPC (Interior by State DBS)
|
Routing - FIRE | 5/1/2006 | | 5/1/2006 | | PASS |
|
|
|
Faxed review comments to architect. Attached comments to plans.
|
Routing - PLAN CHECK | 4/25/2006 | | 5/1/2006 | | PEND |
|
|
|
Resubmittals for fire code review and plumbing plan review comments received 4/28/06 and inserted into plans. Re-routing to fire and plumbing.
|
Routing - PLANNING | 4/28/2006 | | 4/30/2006 | | FAIL |
|
|
|
Elevations still do not match those approved under DRH06-00895. Faxed applicant notification of issues.
|
Plan resubmittals received | | | 4/28/2006 | | DONE |
|
|
|
Received 1 project letter, & 1 copys of sheet A1.1 taken to Dan S.
|
Plan resubmittals received | | | 4/28/2006 | | DONE |
|
|
|
Received 2 copys of sheets EN,6,6A,6C,6B taken to Dan S.
|
1st review completed | | | 4/25/2006 | | FAIL |
|
|
|
Failed Planning, Plumbing and Fire.
|
Routing - FIRE | 4/20/2006 | | 4/25/2006 | | FAIL |
|
|
|
Faxed resubmittal items to arrchitect. Attached review comments to plans.
|
Routing - PLAN CHECK | 4/18/2006 | | 4/24/2006 | | PEND |
|
|
|
Routing to fire code anlayst for review. No resubmittals on building code items required.
|
Routing - PLANNING | 4/14/2006 | | 4/18/2006 | | FAIL |
|
|
|
Drawings fail to meet the requirements of DRH05-00347. Faxed list of necessary revisions to applicant. CER
|
Routing - PLUMBING | 4/10/2006 | | 4/14/2006 | | FAIL |
Lee Rice
|
|
|
No engineers stamp on mechanical or plumbing plans
|
Routing - Erosion and Sediment | 4/10/2006 | | 4/10/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions. 5/9/06 Reference ESC06-00450 as master ESC plan for project.adh.
|
Routing - PUBLIC WORKS | 4/5/2006 | | 4/10/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 4/5/2006 | | 4/5/2006 | | PASS |
|
|
|
DRH05-00347 Marty S. CUP05-00130 Cody .
|
Plans ACCEPTED BY PLAN TECH | | | 4/5/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 4/5/2006 | | |
|
|
|
|
Application received | | | 4/4/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/4/2006 | | |
|
|
|
|