Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD06-00964
StatusFinaled
Name RA SCHULTZ AND COMPANY
Site Address 300 E MALLARD DR Unit: 130
Project NameLAKEPOINTE CENTRE 1
Customer Number 
ePlanReviewNo
Description
RCE #2439**(Idaho Coalition)**)(STE 130)** Exempt from constractors registration per Idaho State Code 54-5205 / To remodel an existing 2153 sq ft office tenant space per approved plans. Work to include, removal of interior office partitions to create small conference room and an open office area, construction of new interior nonbearing noncombustible partitions, replace and repair existing ceiling tiles and miscelaneous related finishes. This building is fully fire sprinklered any alterations or modifications to the sprinkler system WILL REQUIRE A SEPARATE PERMIT, and shall be installed per NFPA #13 as regulated by the fire deparment. (RMH)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/14/20066/14/20068/4/2006 DONE
Second Notice has not been responded to.
Second Notice BLD5/25/20065/25/20066/14/2006 DONE
First Notice has not been responded to.
First Notice5/9/20065/9/20065/25/2006 DONE
DetailsJim Storey
BLD-Final5/9/20065/9/20065/9/2006PPASS
DetailsJim Storey
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Final5/8/20065/9/20065/9/2006APASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
DOC - Permit Finaled5/9/20065/9/20065/9/2006PPASS
DetailsJim Storey
FIRE-Sprinkler Rough-in5/8/20065/9/20065/9/2006APASS
DetailsForrest France
Fire life safety is acceptable, final pending fire alarm permit submittals for changed notification devices.
FIRE-Sprinkler Rough-in5/8/20065/8/20065/8/2006PFAIL
DetailsForrest France
The combination exit sign/emergency light at the main exit is non-functional on battery backup, all other items are okay. Need to final alarm permit (pending resubmittals) as well.
BLD-Framing/Rough-in4/13/20064/13/20064/13/2006PPASS
DetailsJim Storey
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  4/11/2006 DONE
Permit Ready to Issue  4/10/2006 DONE
Telephone call  4/10/2006 DONE
left mess for matt rhees at ###-#### that permit is ready
Plan assigned to (R_H)4/6/20064/6/20064/7/2006 PASS
4/7/2006 13:48:20 RMH - activity updated through activity BLDA022 from case BLD06-00964.
Case Summary (BLD)  4/7/2006 DONE
Case Summary (BLD)  4/7/2006 DONE
Routing - PLAN CHECK4/6/2006 4/7/2006 PASS
Routing - FIRE4/7/2006 4/7/2006 PASS
Minor remodel / Field Verify
1st review completed  4/7/2006  
PLANS/APPL TAKEN TO FRONT DESK  4/7/2006 DONE
Inspection Record Card- Bld  4/7/2006  
Plans ACCEPTED BY PLAN TECH  4/6/2006  
Application received  4/5/2006  
Recd Pcfee & Taken To Pln CK  4/5/2006  
Fee Review-notes4/5/20064/5/2006