Third Notice BLD | 1/8/2007 | 1/8/2007 | 3/26/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 12/11/2006 | 12/11/2006 | 12/27/2006 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 12/8/2006 | 12/11/2006 | 12/11/2006 | A | PASS |
Dave Hannah
|
|
|
Dan or Jim; Phone #: ###-#### or ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
DOC - Permit Finaled | 12/11/2006 | 12/11/2006 | 12/11/2006 | P | PASS |
Dave Hannah
|
|
|
|
Letter of compliance | | | 12/11/2006 | | DONE |
|
|
|
Letter of Compliance issued 12-11-06
|
FIRE-Final Inspection | 12/7/2006 | 12/8/2006 | 12/8/2006 | P | PASS |
Forrest France
|
|
|
Fire life safety final inspection passed.
|
BLD-Final | 12/1/2006 | 12/5/2006 | 12/6/2006 | P | FAIL |
Dave Hannah
|
|
|
dan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles needs to remove exit sign from inside and install it on the ext of the door fix ext landing at stair tower
|
FIRE-Final Inspection | 12/1/2006 | 12/5/2006 | 12/5/2006 | A | FAIL |
Forrest France
|
|
|
Door hardware as installed at the second exit to the roof from the common corridor is not approved.
|
BLD-Final | 11/30/2006 | 12/1/2006 | 12/1/2006 | A | CANC |
Dave Hannah
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 11/29/2006 | 11/30/2006 | 11/30/2006 | P | DONE |
Dave Hannah
|
|
|
jim - stairway advice ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
FIRE-Final Inspection | 11/29/2006 | 11/30/2006 | 11/30/2006 | P | FAIL |
Troy Cobbley
|
|
|
I tried to do inspection this morning but no approved plans are on site and the secondary exit across the roof has not been completed. Inspection will be rescheduled for tomorrow.
|
BLD-Conference | 10/30/2006 | 10/31/2006 | 10/31/2006 | A | PART |
Dave Hannah
|
|
|
Jim, early a.m. if possible; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ceiling grid ok
|
BLD-Other | 8/23/2006 | 8/23/2006 | 8/23/2006 | P | PART |
Dave Hannah
|
|
|
Dan, stairwell inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok to put second layer on stair tower area
|
BLD-Framing/Rough-in | 7/18/2006 | 7/19/2006 | 7/19/2006 | A | PASS |
Dave Hannah
|
|
|
Dan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
Telephone call | | | 7/17/2006 | | DONE |
|
|
|
Called and spoke with Meagan and told her permit is ready & fees///7/17/06 @ 9:15am BAS
|
Permit Ready to Issue | | | 7/17/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 7/17/2006 | | |
|
|
|
|
Plan assigned to (R_H) | 7/13/2006 | | 7/14/2006 | | PASS |
|
|
|
7/14/2006 10:24:15 RMH - activity updated through activity BLDA022 from case BLD06-01581.
|
Routing - PLAN CHECK | 7/13/2006 | | 7/14/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/14/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/14/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/4/2006 | | 7/13/2006 | | PASS |
|
|
|
|
Plan assigned to (R_H) | 4/10/2006 | | 7/13/2006 | | PASS |
|
|
|
7/13/2006 07:15:45 RMH - activity updated through activity BLDA022 from case BLD06-00981.
|
Routing - PUBLIC WORKS | 4/10/2006 | | 7/13/2006 | | PASS |
|
|
|
|
Routing - FIRE | 7/13/2006 | | 7/13/2006 | | PASS |
|
|
|
Attached revised review comments to plans.
|
Case Summary (BLD) | | | 7/12/2006 | | DONE |
|
|
|
|
Plan resubmittals received | | | 6/23/2006 | | |
|
|
|
Received 1 copy of cover transmittal, 1 copy of Plan Review Report1 copy of of memo from Cole + Poe Architects describing Fire Resistance-Rated Construction (3Pages), 1 copy of Structure Calcs from Lochsa Engineering, 2 copies of Structural calcs for Spring Run Plaza from CHM2Hill, 2 copies of the following sheets- A0.0, A0.1, EN1, A1.0, A2.0, A3.0, A3.1, A3.2 and taken to Ron Hill
|
(F) Reprint permit | | | 5/31/2006 | | DONE |
|
|
|
|
Routing - FIRE | 5/3/2006 | | 5/4/2006 | | PASS |
|
|
|
Faxed review comments to Cory Nelson. Attached review comments to plans.
|
1st review completed | | | 5/4/2006 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 5/3/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/11/2006 | | 5/3/2006 | | FAIL |
|
|
|
Failed faxed requirements to the architect and routed to fire 5/3/06
|
Application received | | | 4/6/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/6/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/6/2006 | | |
|
|
|
|
Fee Review-notes | 4/6/2006 | 4/6/2006 | | | |
|
|
|
|