BLD-Final | 5/23/2007 | 5/24/2007 | 5/24/2007 | P | PASS |
Dave Hannah
|
|
|
DALE ###-####
|
DOC - Permit Finaled | 5/24/2007 | 5/24/2007 | 5/24/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Grading Inspection | 5/14/2007 | 5/14/2007 | 5/14/2007 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Conference | 5/9/2007 | 5/10/2007 | 5/10/2007 | A | PASS |
Dave Hannah
|
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Energy code compliance | 11/16/2006 | 11/17/2006 | 11/17/2006 | A | PASS |
Dave Hannah
|
|
|
Dale; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Framing/Rough-in | 11/9/2006 | 11/9/2006 | 11/9/2006 | P | PASS |
Dave Hannah
|
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | PART |
Dave Hannah
|
|
|
dale ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith c/n on site ok to insulate
|
BLD-Framing/Rough-in | 10/16/2006 | 10/17/2006 | 10/17/2006 | A | NR |
Dave Hannah
|
|
|
dale; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Concrete | 7/19/2006 | 7/20/2006 | 7/20/2006 | A | PASS |
Dave Hannah
|
|
|
Tim, ###-#### remaining stem walls ok to pour
|
CHANGE STATUS TO (ISS) | | | 7/19/2006 | | DONE |
|
|
|
Permit status changed because permit was paid in full
|
BLD-Footing | 7/11/2006 | 7/12/2006 | 7/14/2006 | A | PASS |
Dave Hannah
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
PubWorks Subgrade Approval | 7/14/2006 | 7/14/2006 | 7/14/2006 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
BLD-Concrete | 6/12/2006 | 6/13/2006 | 6/13/2006 | A | PART |
Dave Hannah
|
|
|
tim NoteL concrete wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to pour bottom walls
|
BLD-Footing | 5/30/2006 | 5/31/2006 | 5/31/2006 | A | PART |
Dave Hannah
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung basement and garage ftgs ok to pour
|
PubWorks Subgrade Approval | 5/31/2006 | 5/31/2006 | 5/31/2006 | | DONE |
|
|
|
Footing subgrade for basement and garage approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 5/18/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 5/8/2006 | | |
|
|
|
|
Telephone call | | | 5/8/2006 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (SRZ) | 5/5/2006 | 5/5/2006 | 5/5/2006 | | PASS |
|
|
|
5/5/2006 14:16:16 SRZ - activity updated through activity BLDA022 from case BLD06-00988.
|
Plan assigned to (SAM) | 4/6/2006 | 4/6/2006 | 5/5/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/13/2006 | | 5/5/2006 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 5/5/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/5/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/5/2006 | | DONE |
|
|
|
|
Routing - FIRE | 4/11/2006 | | 4/13/2006 | | PASS |
|
|
|
No fire sprinklers required for this subdivision (Foothill East sub)
|
Routing - Erosion and Sediment | 4/11/2006 | | 4/11/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS GRADING | 4/6/2006 | | 4/7/2006 | | PASS |
|
|
|
Approved as Category 1 by CFH05-00038
|
Routing - PUBLIC WORKS | 4/7/2006 | | 4/7/2006 | | PASS |
|
|
|
|
Application received | | | 4/6/2006 | | DONE |
|
|
|
|
Routing - PLANNING | 4/7/2006 | | | | PASS |
|
|
|
Front setback meets the exception 11-04-04.2(C).
|