Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-00993
StatusFinaled
Name VP DEVELOPMENT LLC
Site Address 301 S ROOSEVELT ST
Project NameSenior Housing Apartments "A"
Customer Number 
ePlanReviewNo
Description
Building Type "A" * To construct a new 4,562 square feet, single story, seven unit apartment building with 448 square feet of covered entry porches. There are four units that are: two bedroom one bath, there are two units that are: one bedroom one bath, and one studio unit. Each unit is less than 800 square feet. NOTE: This building is required to be fire sprinklered per NFPA 13-R. Buildings "A, B and the office building are being constructed per Section 704.3 EXCEPTION, the aggregate area of the buildings are within the allowable area of one buildings. All construction shall be per the approved plans and attached comment list. MJP DRH 05-00388 CUP 05-00132
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/11/200712/11/200712/27/2007 DONE
Second Notice has not been responded to.
Fee Review-notes4/7/20064/7/200612/27/2007 DONE
Second Notice BLD11/13/200711/13/200712/11/2007 DONE
First Notice has not been responded to.
First Notice 10/30/200711/13/2007 DONE
Permanent Occupancy  10/30/2007 DONE
PubWorks Occupancy Approval10/24/200710/24/200710/24/2007 DONE
Code Occupancy Approval9/28/20079/28/20079/28/2007PPASS
DetailsDena Gambrel
BLD-Aging Inspection8/20/20078/20/20078/20/2007 DONE
DetailsTom Arcoraci
BLD-Aging Inspection5/4/20075/4/20075/4/2007 PASS
DetailsTom Arcoraci
on temp
BLD-Final2/5/20072/6/20072/6/2007PPART
DetailsTom Arcoraci
chuck; Phone #: ###-#### Internet Inspection Request from: Victoria Beall needs grab bar in h/cap unit ok for temp
Code Occupancy Approval Temp2/6/20072/6/20072/6/2007PPASS
DetailsDena Gambrel
2-6-07 Temp Occupancy Signed.
FIRE-Final Inspection2/5/20072/6/20072/6/2007APASS
DetailsTroy Cobbley
Life safety passed
BLD-Conference1/17/20071/18/20071/18/2007APASS
DetailsTom Arcoraci
chuck ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Conference12/13/200612/13/200612/13/2006PPASS
DetailsDave Hannah
Chuck; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett this was a insulation inspection
BLD-Energy code compliance12/13/200612/13/200612/13/2006PPASS
DetailsDave Hannah
Chuck; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
BLD-Energy code compliance12/8/200612/11/200612/11/2006APASS
DetailsTom Arcoraci
CHUCK; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance12/6/200612/6/200612/6/2006PPART
DetailsTom Arcoraci
chuck - insulation ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Conference11/13/200611/14/200611/14/2006APASS
DetailsTom Arcoraci
chuck ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie spray in ok for fire block in walls
BLD-Framing/Rough-in10/25/200610/26/200610/26/2006APART
DetailsTom Arcoraci
chuck; Phone #: ###-#### Internet Inspection Request from: Patricia Smith sheet rock and h 2.5s ok to delete at plate line
BLD-Foundation9/7/20069/8/20069/8/2006APASS
DetailsMike Jordan
jared; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Footing9/7/20069/7/20069/7/2006PPASS
DetailsTom Arcoraci
chuck Note: please early as possible; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  9/6/2006  
Print Occupancy Form  9/5/2006  
Routing - PLAN CHECK8/10/2006 9/1/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  9/1/2006 DONE
Plan assigned to (M_P)4/12/2006 9/1/2006 PASS
9/1/2006 14:00:32 M_P - activity updated through activity BLDA022 from case BLD06-00993.
Plan resubmittals received  8/21/2006 DONE
Received 4 copies of the transmittal letter with sheets 4sets of sheets E-1,SE-1 taken to Mike P.
Plan resubmittals received  8/16/2006  
received (4) separate response letters "2" pages each from james gipson associates & "2" sets of A4, A5, & A6 -plans taken to mike phillips
Routing - PLAN CHECK7/25/2006 8/10/2006 FAIL
Third review failed sent correction report to the architect requesting additional informaiton to be submitted for further review prior to issuing permit.
Plan resubmittals received  7/28/2006  
Received 1 pg response and 2 copies of the follwing pages: G, A1, A3, A4, A5, A6, M-1, M-2; taken to Mike Phillips
Routing Off Site - STRUCTURAL7/18/2006 7/26/2006 FAIL
Second review failed. Followup review will be finished by plan reviewer.
Called Action Couriers for pick up
Routing - PLAN CHECK6/23/2006 7/25/2006 FAIL
Called and left message for architect. Need to review assumed property line issues.
Waiting fo rengineer's responce, Need calculations and responce letter.
Plan resubmittals received  6/26/2006  
received (10) pages from performance engineers, (3) sets of each structural calculations for roosevelt st. homes bld type A, B, & C -plans taken to mike phillips for review
Routing - PLAN CHECK5/19/2006 6/23/2006 FAIL
Have not received calculations and responce letter from Performance Engineering. Called and laft message for James Gipson to call me.
Plan resubmittals received  6/9/2006  
Received 1 copy of plan review response to BLD06-00993, BLD06-00994, BLD06-00995, BLD06-00996, 1 copy of plan review report from Kartchner Engineering, 1 copy of plan review response from B & A Engineers, 1 page from Key Beam, 3 copy of the following sheets- G, C-1, C-2, C-3, C-4, C-5, C-6, C-7, C-8, A1, A2, A3, A3.1, A4, A5, A6, A7, A8, A9, A10, SO OF 9, S1 OF 9, S2 OF 9, S3 OF 9, S4 OF 9, S5 OF 9, S6 OF 9, S7 OF 9, S8 OF 9, M-1, M-2, M-3, P-1, P-2, P-3, MP-1, E-1, E-2, SE-1and taken to Mike Phillips
Routing - PLANNING6/7/2006 6/7/2006 PASS
per hal simmons-- see memo in file
Plan resubmittals received  6/1/2006  
Recieved one copy of A8, taken to Mike Phillips.
1st review completed  5/19/2006 FAIL
Failed Plan check.
Routing - FIRE5/18/2006 5/19/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK  5/18/2006 FAIL
Plan review completed, sent correction report to the architect requesting additional informaiton be submitted for further review prior to issuing permit.
Print permit w/o conditions  5/18/2006  
Case Summary (BLD)  5/18/2006  
Routing Off Site - STRUCTURAL4/12/2006 4/28/2006 FAIL
Called Action Courier for pick up @ 2:09 to AHJ///4/12/06 BAS
Routing - PLANNING4/21/2006 4/21/2006 FAIL
Per CUP conditions of approval 3 (elevations), 4 (Shifitng strucutres A and B to obrserve required setbacks), and 5 (indicating floor plan details within common room). Spoke with Chuck (Developer)
Routing - PLANNING4/20/2006 4/21/2006 PASS
DRH05-00388 - Pass - Andrea Tuning for DR
CUP05-00132 -
Routing - PLUMBING4/19/2006 4/20/2006 PASS
per plans and 2003 upc
Routing - Erosion and Sediment4/17/2006 4/19/2006 PASS
ESC plan approved with attached conditions. Refer to ESC06-00605 as master ESC plan for project.
Routing - PUBLIC WORKS4/13/2006 4/17/2006 PASS
Routing - PLANNING Land Div4/12/2006 4/13/2006 PASS
Property has been combined under one parcel number.
Plans ACCEPTED BY PLAN TECH  4/12/2006  
Plan routing begun/NEW & ADDTN  4/12/2006  
Application received  4/7/2006  
Recd Pcfee & Taken To Pln CK  4/7/2006