Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01006
StatusFinaled
Name WILLOWBROOK DEVELOPMENT
Site Address 11031 W JOPLIN RD
Project Name 
Customer NumberSEE COMMENTS
ePlanReviewNo
Description
WILLOWBROOK DEV RCE #2358 /Republic Storage at Joplin (Manager's Residence and Rental Office) - To construct a new 1,510 square foot, one story, wood framed residential and office building. The office and restroom area is 320 square feet and the residence is 1,190 square feet. This permit also includes the site work associated with this Respublic Storage Project. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD5/25/20075/25/20075/25/2007 DONE
First Notice has not been responded to.
First Notice 5/4/20075/25/2007 DONE
Permanent occupancy  5/4/2007 DONE
Perm. Occ. Cert. # 11571 issued 5-4-07 to Republic Stroage at Joplin.
BLD-Final5/1/20075/2/20075/2/2007APASS
DetailsJim Sly
Internet Inspection Request from: Staci Smith
OK for Perm Occ.
Permanent Occupancy 5/2/20075/2/2007 DONE
Details
PubWorks Occupancy Approval4/30/20074/30/20074/30/2007 DONE
Accepted 04/24/07 D. Erskine.
Code Occupancy Approval4/18/20074/18/20074/18/2007PPASS
DetailsCarol Montgomery
Meets compliance w/ Design Review (DRH05-00270)
BLD-Final4/13/20074/16/20074/16/2007ANR
DetailsJim Sly
Phone #: ###-####
FIRE-Final Inspection4/12/20074/13/20074/13/2007APASS
DetailsTroy Cobbley
life safety passed.
FIRE-Final Inspection4/11/20074/11/20074/12/2007PFAIL
DetailsTroy Cobbley
Provide ADA approved door hardware for the public/office restroom, relocate the residential smoke detector to atleast 3' from the bathroom door and provide a permanant address.
BLD-Framing/Rough-in4/2/20074/3/20074/3/2007APASS
DetailsJim Sly
amish; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Other1/9/20071/9/20071/9/2007PPASS
DetailsJim Sly
hamish or rusty Note: fire wall; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Energy code compliance11/2/200611/2/200611/2/2006PPASS
DetailsJim Sly
jake ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Frame and Energy OK
BLD-Final11/2/200611/2/200611/2/2006PNR
DetailsJim Sly
jake ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in10/5/200610/6/200610/6/2006APART
DetailsJim Sly
stacie; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Shear OK
BLD-Foundation9/26/20069/27/20069/27/2006PPASS
DetailsMike Jordan
robert; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Perimeter stemwalls for gate house.
BLD-Footing9/25/20069/26/20069/26/2006APART
DetailsJim Sly
robert; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
Formed.....no plans or contractor on site....called Contr. Will check approved plan at wall insp. (Contr says setback OK)
BLD-Footing9/22/20069/25/20069/25/2006PCANC
DetailsTom Arcoraci
nr per robertScheduled by a contractor via Hello! on 9/22/2006 at 5:25:52 PM. Contact: ###-####.
Telephone call  9/22/2006 DONE
Spoke with Cornel Larson regarding the red annotated note on plan sheet SP-1 regarding the installation of an additional fire hydrant along Joplin Road. This fire hydrant is not required and the note should be disregarded. Refer to Fire Plan review comments for minimum requirements..
(F) Reprint permit  9/11/2006  
Issue PAID IN FULL permit  9/8/2006 DONE
Print Occupancy Form  6/22/2006 DONE
Telephone call  6/22/2006 DONE
tlk to cornel larson ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  6/22/2006  
Routing - FIRE6/20/2006 6/21/2006 PASS
No change in review comments.
Routing - PLAN CHECK6/21/2006 6/21/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/21/2006 DONE
Plan assigned to (JCM)4/21/2006 6/21/2006 PASS
6/21/2006 13:30:48 JCM - activity updated through activity BLDA022 from case BLD06-01006.
Routing - PLAN CHECK6/14/2006 6/20/2006  
Routing - PLANNING6/6/2006 6/14/2006 PASS
Plans have been redlined to show that Joplin Road is ROW as opposed to an easement.
Routing - PLANNING6/14/2006 6/14/2006 PASS
Plans have been redlined to show that Joplin Road is ROW as opposed to an easement.
Routing - PLANNING6/6/2006 6/8/2006 FAIL
The applicant has not dedicated right-of-way to ACHD on Joplin Road (a requirement of the DR application).

Routing - PLAN CHECK5/9/2006 6/6/2006  
Plan Reviewer's activity  6/1/2006 PASS
Reviewed and approved resubmitted structural and nonstructural revisions. JCM
Plan resubmittals received  5/22/2006  
1 copy of cover transmittal letter, 1 copy of structural responses to plan review, 3 copies of supplemental structural calculations, 3 copies of S-7 and taken to John Menard
Plan resubmittals received  5/17/2006 DONE
Received 1 review report,1 assumed property line,1,letter & fax to Cornel Larson & 3 copys of sheets 0,SP-1,SP-2.1,A-2,A-3,A-5,A-6,S-6 S-5,M-1 taken to John .
Routing - FIRE5/8/2006 5/9/2006 PASS
Faxed review comments to Cornel Larson. Attached review comments to plans.
1st review completed  5/9/2006 FAIL
Failed Plan Check and Planning.
Routing - PLAN CHECK5/3/2006 5/8/2006 FAIL
Plan resubmittals requested  5/8/2006 DONE
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
Routing Off Site - STRUCTURAL4/21/2006 5/3/2006 FAIL
Called Action Courrier for pick up to AHJ @ 11:40am BAS///4/24/06 @ 8:50AM Per John M plans should have been sent to Stapley so I called Action ans asked them to pick up from AHJ & take to Stapley///BAS - Received a comment list from the consulting structural engineer requesting additional calculations. JCM
Routing - PLANNING5/3/2006 5/3/2006 FAIL
drh05-00270 sarah s
Routing - PLUMBING4/28/2006 5/3/2006 PASS
DetailsLee Rice
approved per plan and 2003 UPC
Routing - Erosion and Sediment4/27/2006 4/28/2006 PASS
ESC plan approved with attached conditions.4/28/06 refer to ESC06-00612 as master ESC plan for entire project.adh.
Routing - PUBLIC WORKS  4/27/2006 PASS
Routing - PLANNING Land Div4/21/2006 4/24/2006 PASS
Plans ACCEPTED BY PLAN TECH  4/21/2006  
Plan routing begun/NEW & ADDTN  4/21/2006  
Application received  4/10/2006  
Fee Review-notes4/10/20064/10/2006