Permit Information
Permit NumberBLD06-01012
StatusFinaled
Name VERTICAL CONSTRUCTION
Site Address 1070 N CURTIS RD
Project NameCURTIS PROF PLAZA-EXTERIOR
Customer Number 
ePlanReviewNo
Description
VERTICAL CONSTRUCTION- RCE035 (CURTIS PROFESSIONAL OFFICE BLDG-EXTERIOR REMODEL) To remodel wood siding and install new stucco exterior finish, remove exterior "wing walls" framing leaving existing support columns, construct new exterior box column walls and finish to match building; install additional reinforced concrete support piers at columns and canopies; construct new steel structure canopy at east and west entry; change out storefront entry glazing and door location and perform parking lot curb and sidewalk changes per plans and DRH06-00038. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD5/9/20075/9/20077/12/2007 DONE
Second Notice has not been responded to.
Fee Review-notes4/10/20064/10/20067/12/2007 DONE
Telephone call  7/12/2007 DONE
I left a message again for Mark to call be back on the values different and no plm permit !! 2:45 pm
Telephone call  7/5/2007  
lft vm with mike asking for final value was low in system but his paper shows 417850 need the final - should call me back Monday
Second Notice BLD4/27/20074/27/20075/9/2007 DONE
First Notice has not been responded to.
First Notice4/11/20074/11/20074/27/2007 DONE
DetailsTom Arcoraci
BLD-Final4/10/20074/11/20074/11/2007PPASS
DetailsTom Arcoraci
dave ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
DOC - Permit Finaled4/11/20074/11/20074/11/2007PPASS
DetailsTom Arcoraci
FIRE-Final Inspection4/10/20074/11/20074/11/2007APASS
DetailsTroy Cobbley
life safety passed
BLD-Final1/17/20071/18/20071/18/2007APART
DetailsTom Arcoraci
david; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok when others sign off
FIRE-Final Inspection1/17/20071/17/20071/17/2007PFAIL
DetailsTroy Cobbley
Provide fire alarm permit for the interconnection of the door mags and the fire alarm system per IFC 1008.1.4.3
BLD-Aging Inspection1/9/20071/9/20071/9/2007 PASS
DetailsTom Arcoraci
BLD-Aging Inspection10/4/200610/4/200610/4/2006 PASS
DetailsTom Arcoraci
BLD-Framing/Rough-in8/1/20068/1/20068/1/2006PPASS
DetailsTom Arcoraci
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Other7/13/20067/13/20067/13/2006PPASS
DetailsTom Arcoraci
DAVE NOTE: STEEL CONCRETE REINFORCE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  6/7/2006  
Inspection Record Card- Bld  6/1/2006 DONE
Telephone call  6/1/2006 DONE
lft ms with matt rhees ###-#### that permit and fees are ready to be picked up needs GC and RP needed
Permit Ready to Issue  6/1/2006 DONE
Plan assigned to (DRS)4/14/2006 5/31/2006 PASS
5/31/2006 10:39:19 DRS - activity updated through activity BLDA022 from case BLD06-01012.
Routing - Erosion and Sediment5/31/2006 5/31/2006 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK5/31/2006 5/31/2006 PASS
Routing to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  5/31/2006 PASS
Additional plans submitted  5/31/2006 DONE
Received design data from engineer Scott Soule by e-mail for minimum depth of bolt embedment at new canopy columns.
Routing - PLAN CHECK5/17/2006 5/30/2006 PEND
Resubmittals received and inserted into original plans. No further resubmittals required. Routing to ESC for rereview.
Plan resubmittals received  5/26/2006 DONE
Received transmittal letter,project letter,two copies ofresponse letter from treasure valley engineers, two copies of project startup for special inspection, two copies of acceptance criteria for cementitious exterior wall coatings, two copies of La Habra Stucco specs. with two copies of sheets A0.0,A2.0,A3.1,A4.0 all taken to Dan S.rad
Routing - FIRE5/15/2006 5/17/2006 PASS
Attached review comments to plans.
1st review completed  5/17/2006 FAIL
Failed Plan check
Plan resubmittals requested  5/15/2006 DONE
Faxed and e-mailed copy of plan review conditions requiring correction to architect Matt Rhees.
Routing - PLAN CHECK4/18/2006 5/15/2006 FAIL
Resubmittals required. copy of plan review report e-mailed and faxed to architect for response. routing to fire code analyst for review.
Plan resubmittals received  5/1/2006 DONE
received 2 ESC Narratives & 2 copys of sheet esc1.0 taken to Dan S.
Routing - PLANNING4/17/2006 4/18/2006 PASS
Bruce Eggleston DRH06-00038, see attached conditions of approval.
Routing - PUBLIC WORKS4/14/2006 4/17/2006 PASS
Routing - Erosion and Sediment4/17/2006 4/17/2006 FAIL
ESC waiver request denied. Scope of work is too extensive to be granted a waiver, an ESC plan will be required for the project. Notified applicant.
Plans ACCEPTED BY PLAN TECH  4/12/2006  
Application received  4/10/2006  
Recd Pcfee & Taken To Pln CK  4/10/2006