Permit Information
Permit NumberBLD06-01044
StatusFinaled
Name K2 CONSTRUCTION
Site Address 939 W BOEING ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(OROWEAT BAKERIES)(RCE 1824-K2 CONSTRUCTION) To remodel an existing 46,147 sq.ft. warehouse/office building for new tenant with bakery which includes cooking, freezing and packaging of food products per approved plans. The entire first floor and a portion of the 2nd floor to be occupied totaling 39,731 sq.ft. The balance of 6,417 sq.ft. of 2nd floor to be sealed off and not used. No information provided for the detached building on east side of property and this permit does not address occupancy of that structure. Work to include, removal of interior nonbearing partitions, cut new overhead door into existing concrete wall per approved engineering, installation of new plumbing, installation of new kitchen equipment, related site work, miscellaneous related finishes. This building is Fully Fire sprinklered for unlimited area building any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. RMH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD7/18/20077/18/20077/31/2007 DONE
Second Notice has not been responded to.
Second Notice BLD6/21/20076/21/20077/18/2007 DONE
First Notice has not been responded to.
First Notice5/25/20075/25/20076/21/2007 DONE
DetailsJim Storey
BLD-Aging Inspection5/21/20075/21/20075/25/2007 PASS
DetailsJim Storey
final ok card on site.
DOC - Permit Finaled5/25/20075/25/20075/25/2007PPASS
DetailsJim Storey
final ok card on site.
BLD-Final2/12/20072/12/20072/12/2007PPASS
DetailsJim Storey
ty; Phone #: ###-#### Internet Inspection Request from: Victoria Beall final ok card on site.
FIRE-Final Inspection2/8/20072/9/20072/9/2007APASS
DetailsTroy Cobbley
Life safety passed. The items on the last correction notice have been corrected.
BLD-Final1/30/20071/31/20071/31/2007PPART
DetailsJim Storey
TY; Phone #: ###-#### Internet Inspection Request from: Darla Downs temp ok.blk off wall to mech access office side.
FIRE-Final Inspection1/30/20071/31/20071/31/2007AFAIL
DetailsForrest France
Provide reliable means for maintaining a min. of 40deg. F temperature in the riser and FACP room required for these systems, keyed locking hardware at the main entry/exit must only be operable from the egress side.
BLD-Aging Inspection1/15/20071/15/20071/16/2007 NR
DetailsJim Storey
pending fire
FIRE-Conference11/14/200611/15/200611/16/2006ADONE
DetailsForrest France
On site confrence to discuss requirements for final approval of the project building permit with regard to fire alarm, fire sprinkler, and life safety issues, also discussed attatched fire code review notes.
FIRE-Final Inspection11/2/200611/6/200611/6/2006ACANC
DetailsForrest France
stacy--life safety fn ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie cancelled per stacie
BLD-Final11/2/200611/6/200611/6/2006PCANC
DetailsJim Storey
stacy; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie cancelled per stacie
FIRE-Final Inspection11/2/200611/3/200611/3/2006ANR
DetailsForrest France
The alarm and sprinkler permits must be finaled prior to life safety final.
FIRE-Alarm Testing11/2/200611/3/200611/3/2006ACANC
DetailsForrest France
Duplicate inspection request.
BLD-Final11/1/200611/2/200611/2/2006ANR
DetailsMike Jordan
stacey ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Still needs finals from others.
BLD-Final10/30/200611/1/200611/1/2006PDEFR
DetailsJim Storey
stacey ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith out of time
FIRE-Final Inspection10/30/200611/1/200611/1/2006ANR
DetailsForrest France
The project related fire sprinkler and fire alarm permits must be requested for inspection, approved and finaled prior to BLD life safety final.
BLD-Conference9/20/20069/20/20069/20/2006PPASS
DetailsJim Storey
jason ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
FIRE-Conference8/10/20068/10/20068/11/2006PDONE
DetailsForrest France
On site confrence with the electrical contractor to discuss exit signage and requirements for emergency lighting.
BLD-Framing/Rough-in8/7/20068/7/20068/7/2006PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/7/2006 at 7:50:06 AM. Contact: ###-####.
Plan resubmittals received  6/30/2006  
Recieved transmittal letter, 3 copies of the following pages: A0.1, A1.1, A1.2, A1.3, A1.4, A2.1, P1.1, S1.1, S1.2; taken to Ron Hill
BLD-Conference6/12/20066/13/20066/13/2006PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/12/2006 at 4:18:25 PM. Contact: ###-####. resbmit to ron hill.
FIRE-Conference6/5/20066/7/20066/8/2006ADONE
DetailsForrest France
On site discussion regarding permitted work scope, fire code review notes, modifications which affect the sprinkler system will require a fire sprinkler permit.
BLD-Framing/Rough-in6/7/20066/8/20066/8/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/7/2006 at 2:35:12 PM. Contact: ###-####.c/n to resubmit 2hr wall above cmu to roof deck for complance of assembly/ provide mezane details for exiting and support.
Plan assigned to (R_H)5/25/20065/25/20065/31/2006 PASS
5/31/2006 06:41:09 RMH - activity updated through activity BLDA022 from case BLD06-01044.
Routing - PLAN CHECK5/30/2006 5/31/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/31/2006 DONE
Issue PAID IN FULL permit  5/31/2006  
Routing - FIRE5/25/2006 5/30/2006 PASS
Attached review comments to plans.
Plan resubmittals received  5/25/2006  
3 copies of A1.1 and taken to Scott A
Routing - PLAN CHECK5/22/2006 5/23/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/23/2006 DONE
Print Occupancy Form  5/23/2006 DONE
Telephone call  5/23/2006 DONE
lft ms w vm with rocky towle ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  5/23/2006 DONE
Plan assigned to (R_H)4/17/2006 5/23/2006 PASS
5/23/2006 06:35:34 RMH - activity updated through activity BLDA022 from case BLD06-01044.
Routing - PUBLIC WORKS5/22/2006 5/22/2006 PASS
1st review completed  5/16/2006 FAIL
Failed Fire and Plumbing.
Routing - FIRE5/12/2006 5/16/2006 FAIL
Faxed resubmittal items to architect. Attached review comments to plans.
Routing - PLAN CHECK5/5/2006 5/12/2006 PEND
No corrections required by building department reveiw.. routed plans to fire on 5/12/06
Case Summary (BLD)  5/12/2006  
Routing - PLUMBING5/5/2006 5/5/2006 PASS
per plans and 2003 upc
Plan resubmittals received  4/28/2006 DONE
Received 3 copys of sheets A1.1,P1.1 taken to Ron H.
Routing - Erosion and Sediment4/18/2006 4/19/2006 PASS
ESC waiver request approved with attached conditions.
Routing - PLUMBING4/19/2006 4/19/2006 FAIL
provide plans showing the above listed items. need public works pretreatment approval and cdhd comments prior to review.
Routing - PLANNING4/19/2006 4/19/2006 PASS
Cody Riddle
Routing - PUBLIC WORKS4/17/2006 4/18/2006 FAIL
Architect to supply plumbing plans; to supply plans for kitchen equipment; plumbing plans to show grease abatement/interceptor; Contact Louise at ###-####
Pending Assignment by MYS4/12/2006 4/17/2006 DONE
4/17/2006 14:49:53 MYS - activity updated through activity BLDA175 from case BLD06-01044.
Plans ACCEPTED BY PLAN TECH  4/14/2006  
Application received  4/12/2006  
Recd Pcfee & Taken To Pln CK  4/12/2006  
Fee Review-notes4/12/20064/12/2006