BLD-Final | 3/14/2007 | 3/14/2007 | 3/14/2007 | P | PASS |
Tony Young
|
|
|
pete ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
DOC - Permit Finaled | 3/14/2007 | 3/14/2007 | 3/14/2007 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 3/12/2007 | 3/12/2007 | 3/12/2007 | P | NR |
Tony Young
|
|
|
Pete pls call prior to inspection for access code.; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Energy code compliance | 10/18/2006 | 10/18/2006 | 10/18/2006 | P | PASS |
Tom Arcoraci
|
|
|
Pete; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Framing/Rough-in | 10/18/2006 | 10/18/2006 | 10/18/2006 | P | PASS |
Tom Arcoraci
|
|
|
Pete; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Framing/Rough-in | 10/17/2006 | 10/17/2006 | 10/17/2006 | P | FAIL |
Tom Arcoraci
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles truss joist must ok rim board for use as a stair stringer cn posted
|
BLD-Framing/Rough-in | 10/13/2006 | 10/13/2006 | 10/13/2006 | P | NR |
Tom Arcoraci
|
|
|
pete; Phone #: ###-#### Internet Inspection Request from: Patricia Smith no approved plans or truss engineering on site
|
BLD-Foundation | 8/11/2006 | 8/14/2006 | 8/14/2006 | A | PART |
Tony Young
|
|
|
matt ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Footing | 8/10/2006 | 8/11/2006 | 8/11/2006 | P | PART |
Tony Young
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Issue PAID IN FULL permit | | | 8/10/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 8/9/2006 | | DONE |
|
|
|
|
Telephone call | | | 8/9/2006 | | DONE |
|
|
|
left vm for pete@###-####/told permit was ready, permit#, lot & block, address, fees and the need for g.c. and r/p
|
Permit Ready to Issue | | | 8/9/2006 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 4/13/2006 | 7/17/2006 | 8/7/2006 | | PASS |
|
|
|
8/7/2006 14:14:39 SAM - activity updated through activity BLDA022 from case BLD06-01054.
|
Routing - PLAN CHECK | 7/7/2006 | | 8/7/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 7/17/2006 | | |
|
|
|
|
Plan Reviewer's activity | | | 7/17/2006 | | DONE |
|
|
|
7/17/06 15:50 I called and left a message for Eric to call me regarding the plans. I have a question on the window at the back of the master bedroom and I need a detail for the one hour eve. Plans are on hold.
|
Routing - PLANNING | 7/6/2006 | | 7/6/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 5/25/2006 | | 5/26/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 5/22/2006 | | |
|
|
|
Received new set of plans 5-22-06 kept the existing bld permit number.///dld
|
Routing - PLANNING | 4/13/2006 | | 4/14/2006 | | FAIL |
|
|
|
Plans are in the fail drawer. I called applicant to let him know that the cul-de-sac is located within the 3' setback. Also, there are some final amenities (trees) which need to be planted before I can sign off this last set of buiding plans. SAR
|
Application received | | | 4/13/2006 | | |
|
|
|
|
Routing - PLANNING | 5/22/2006 | | 5/24/2005 | | FAIL |
|
|
|
Failed, the applicant needs to complete installation of the remaining amenities. The plans are ok, just waiting on the amenities. I will continue to route plans through the system 5-30-06 plans in hold box as we can not accept them until after
planning has signed off on site plan///dld
|