Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD06-01058
StatusFinaled
Name MONTAGE SALON & SPA
Site Address 3118 S BOWN WAY
Project NameBOWN CROSSING
Customer Number 
ePlanReviewNo
Description
(NO CONTRACTOR REGISTRATION PROVIDED)(MONTAGE SALON & SPA)(BOWN CROSSING MARKET PLACE-BLDG A) To complete first time tenant build-out for 1,230 sq. ft. area for use as a Beauty Salon & Spa, all per approved plans. Work includes construction of perimeter tenant walls, restroom walls and interior area dividing walls to create a waiting/reception area, work stations, wash stations, pedicure stations, massage/facial room and breakroom. To construct two fully accessible restrooms, one for this tenant space and one for future use by adjacent tenant space to south. Up grade electrical, mechanical, plumbing, sprinkler & alarm systems to meet tenant needs and comply with current adopted codes and ordinances. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes4/13/20064/13/20067/16/2007 DONE
Third Notice BLD1/8/20071/8/20076/1/2007 DONE
Second Notice has not been responded to.
Telephone call  4/27/2007 DONE
certificate of value faxed to montage twice, and mailed to them on 4/27/07 no response from faxes. VAB
Telephone call  4/19/2007 DONE
call to jennifer w/ montage, she said she didn't receive the fv form. refaxed blank to her.
Telephone call  4/6/2007 DONE
call from trish, Montage is responsible for fv
Telephone call  4/6/2007 DONE
call to montage, they will fill out fv and fax back
Telephone call  4/5/2007 DONE
call to trish w/ brs, she stated she will look into these fv requests and call back.
Second Notice BLD12/27/200612/27/20061/8/2007 DONE
First Notice has not been responded to.
First Notice 10/11/200612/27/2006 DONE
BLD-Final10/10/200610/11/200610/11/2006APASS
DetailsJim Storey
jennifer; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
FIRE-Final Inspection10/10/200610/11/200610/11/2006APASS
DetailsTroy Cobbley
Life safety finaled
Permanent Occupancy 10/11/200610/11/2006 DONE
Details
Permanent occupancy UNPAID FEE  10/11/2006 DONE
Perm. Occ. Cert. # 11248 issued 10-11-06 to the Montage Salon & Spa in Bown Crossing, Bldg. A.
FIRE-Conference10/5/200610/5/200610/5/2006PDONE
DetailsTroy Cobbley
The dialer in the existing fire alarm panel has a phone line trouble. (Look behind the batteries). I called Jen and left her a message stating that this is a major problem and needs to be addressed prior to any finals
BLD-Framing/Rough-in8/23/20068/24/20068/24/2006APASS
DetailsJim Storey
Jennifer; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Conference8/22/20068/23/20068/23/2006PPASS
DetailsJim Storey
jennifer - call prior to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
Issue PAID IN FULL permit  6/6/2006 DONE
Additional plans submitted  6/1/2006 DONE
Received clarification for fixture luminare schedule and explanation for 8 foot fixture with (4) 4 foot T8 lamps, 114 watts, from DC Engineering Ed Korotkih. Inserted same into site plan and office copy to be part of record.
Telephone call  6/1/2006 DONE
lft vm with jeff likes ###-#### that permit and fees are ready needs GC and RCE #
Permit Ready to Issue  6/1/2006 DONE
Print Occupancy Form  5/31/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/30/2006 PASS
Routing - PLAN CHECK5/18/2006 5/30/2006 PASS
To permit desk to issue.
Plan assigned to (DRS)4/17/2006 5/30/2006 PASS
5/30/2006 16:24:03 DRS - activity updated through activity BLDA022 from case BLD06-01058.
Plan resubmittals received  5/26/2006  
Received 1 copy of cover transmittal, 1 copy of 2 page letter to Dan Stuart replying from the plan reveiw report, 1 copy of plan correction item # 7-10, A1.1, A2.1, A3.1, E0.2, E1.1, M1, M2, M3 and taken to Dan Stuart
1st review completed  5/18/2006 FAIL
Failed Plan Check.
Routing - FIRE5/16/2006 5/18/2006 PASS
Attached review comments to the plans.
Routing - PLAN CHECK4/18/2006 5/16/2006 FAIL
Resubmittals required. Architect notified by e-mail & fax with copy of plan review. Forwarding to fire code analyst for review.
Plan resubmittals requested  5/16/2006 DONE
Faxed and e-mailed architect copy of plan review conditions needing to be addressed by him or affiliated associates for this project.
Routing - PUBLIC WORKS4/17/2006 4/18/2006 PASS
Plans ACCEPTED BY PLAN TECH  4/14/2006  
Plans ACCEPTED BY PLAN TECH  4/13/2006  
Application received  4/13/2006  
Recd Pcfee & Taken To Pln CK  4/13/2006 DONE