Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01093
StatusFinaled
Name JUNGA JUICE
Site Address 439 S CAPITOL BLVD
Project NameBODO BLDG #8
Customer Number 
ePlanReviewNo
Description
(JUNGA JUICE - BODO BLDG #8 - 1ST STORY) This building is fire sprinklered for high-rise. To construct a 1,148 square foot beverage restaurant located on the 1st story of a high-rise building. Work is to include 2 restrooms accessible to the disabled, interior nonbearing walls, suspended ceilings, an oxygen bar, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD3/21/20073/21/20074/30/2007 DONE
Second Notice has not been responded to.
Second Notice BLD3/8/20073/8/20073/21/2007 DONE
First Notice has not been responded to.
First Notice 2/9/20073/8/2007 DONE
Permanent occupancy  2/9/2007 DONE
Perm. Occ. Cert. # 11431 issued 2-9-07 to Junga Juice.
Permanent Occupancy 2/8/20072/8/2007 DONE
Details
Temporary occupancy  8/21/2006 DONE
Temp. Occ. Cert. # 5426 issued 8-21-06 to Junga Juice.
FIRE-Final Inspection8/17/20068/17/20068/17/2006PPASS
DetailsForrest France
Duplicate inspection request previously passed.
BLD-Final8/15/20068/16/20068/17/2006PPASS
DetailsDave Hannah
sonny; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Final8/16/20068/17/20068/17/2006APASS
DetailsDave Hannah
sonny; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok for perm occ
FIRE-Final Inspection8/16/20068/17/20068/17/2006APASS
DetailsForrest France
Previous c/n items are complete, fire life safety passed inspection.
FIRE-Final Inspection8/15/20068/16/20068/16/2006AFAIL
DetailsForrest France
Emergency lights at two locations as shown on approved plans sheet E2.0 are not installed.
BLD-Framing/Rough-in8/7/20068/8/20068/8/2006APART
DetailsDave Hannah
jim - ceiling; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to cover ceiling
BLD-Framing/Rough-in7/19/20067/19/20067/19/2006PFAIL
DetailsDave Hannah
sunny - ceiling cover insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley needs other trades to signoff roughins
Inspection Record Card- Bld  7/17/2006 DONE
lost over the weekend/7/17/06///blb
Print Occupancy Form  7/17/2006 DONE
lost over weekend/7/17/06///blb
BLD-Other6/15/20066/16/20066/16/2006APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/15/2006 at 12:38:39 PM. Contact: ###-####.
pathed loose fire spray
BLD-Other6/9/20066/12/20066/14/2006PPASS
DetailsDave Hannah
sunny Note: hvac patch holes inspect; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance6/9/20066/12/20066/14/2006PPASS
DetailsDave Hannah
sunny ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Energy code compliance6/8/20066/8/20066/8/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/8/2006 at 7:19:48 AM. Contact: ###-####.back wall ok to cover
BLD-Framing/Rough-in6/5/20066/6/20066/6/2006APART
DetailsDave Hannah
sunny - next to KB Burritos; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley ok to insulate ext walls ok to cover int walls
Issue & PRINT permit  5/26/2006 DONE
Routing - PLAN CHECK5/11/2006 5/12/2006 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  5/12/2006 DONE
Print Occupancy Form  5/12/2006 DONE
Telephone call  5/12/2006 DONE
called ###-#### and told Elizabeth that permit is ready, fee, need GC & RCE
Permit Ready to Issue  5/12/2006 DONE
Plan assigned to (CJW)4/24/2006 5/12/2006 PASS
5/12/2006 15:16:33 CJW - activity updated through activity BLDA022 from case BLD06-01093.
Routing - FIRE5/9/2006 5/11/2006 PASS
Attached review comments to plans.
Plan resubmittals received  5/11/2006  
received revised "2" sets of a2.1, a1.3, "2" sets of a8.1, m1.1, 1 transmitta 1 letter from trout arch
1st review completed  5/11/2006 FAIL
Failed Plan Check.
Routing - PLAN CHECK4/28/2006 5/9/2006 FAIL
The IBC plan review was started on May 5, 2006 and was finished on May 9, 2006. Revised drawings were required. See the plan review report.
Routing - PLUMBING4/24/2006 4/28/2006 PASS
DetailsLee Rice
approved per plan........and notes and 2003 upc
Routing - PUBLIC WORKS4/24/2006 4/24/2006 PASS
Application received  4/18/2006  
Plans ACCEPTED BY PLAN TECH  4/18/2006  
Recd Pcfee & Taken To Pln CK  4/18/2006 DONE