Permit Information
Permit NumberBLD06-01114
StatusFinaled
Name BOISE CITY BUILDING COMPANY
Site Address 2123 N 16TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
"CONTRACTOR ANDY PETERSON REGISTRATION NUMBER RCE-527" To construct a 1390sq.ft. Two story single family dwelling (540sq.ft. First floor / 850sq.ft. Second floor) with a 13sq.ft. Covered front Stoop, a 61sq.ft. Covered front porch, a 53sq.ft. Covered rear patio, a 97sq.ft. Covered front upper deck, a 75sq.ft. Covered rear upper deck, and a 265sq.ft. Attached garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the city of Boise. R-1CH zoning district, CUP05-146, CVA05-39, and building setbacks as per Susan Riggs with Planning and Zoning. "This lot is within a Floodplain area. An elevation certificate is required to be submitted to and approved by Jim Wyllie, Public Works Department, prior to calling for a framing inspection." (SRZ)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/6/20078/6/20078/6/2007APASS
DetailsTony Young
andy Phone #: ###-####
DOC - Permit Finaled8/6/20078/6/20078/6/2007PPASS
DetailsTony Young
c of o issued
Code Occupancy Approval8/3/20078/3/20078/3/2007PPASS
DetailsMichael Garner
FOLLOW UP INSPECTION COMPLETE - PASS
BLD-Final7/25/20077/25/20077/25/2007PNR
DetailsTony Young
Andy; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt
BLD-Final7/20/20077/20/20077/20/2007PFAIL
DetailsTony Young
andy Phone #: ###-####
c/n posted,, need zoning, tighten guardrail, seal firewall
Routing PW Flood Plain7/19/2007 7/19/2007 PASS
Post Foundation Elevation Certificate received. Floodplain building conditions have been satisfied.
BLD-Energy code compliance3/21/20073/21/20073/21/2007PPASS
DetailsTony Young
andy; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in3/16/20073/16/20073/16/2007PPART
DetailsTony Young
Andy; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
c/n posted,, ok to insulate
BLD-Foundation1/8/20071/9/20071/9/2007APART
DetailsTony Young
mana - ###-####
recieved letter from designer on reducing wall to 6" from 8",, slab will not be on top of wall
BLD-Footing1/5/20071/8/20071/8/2007APART
DetailsTony Young
andy ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Override - Parcel Holds  1/8/2007  
Override - Parcel Holds  1/8/2007  
Issue PAID IN FULL permit  1/4/2007 DONE
Telephone call  1/2/2007 DONE
t/c w lois at boise city building company ###-#### - permit ready and fees given
Override - Parcel Holds  1/2/2007  
Permit Ready to Issue  1/2/2007 DONE
An elevation certificate is required to be submitted to and approved by Jim Wyllie, Public Works Department, prior to calling for a framing inspection.
Override - Parcel Holds  12/22/2006  
Inspection Record Card- Bld  12/22/2006 DONE
getting permit ready to issue
Plan assigned to (SRZ)5/22/20065/22/200612/19/2006 PASS
12/19/2006 10:16:18 SRZ - activity updated through activity BLDA022 from case BLD06-01114.
PLANS/APPL TAKEN TO FRONT DESK  12/19/2006 DONE
Plan Reviewer's activity  12/15/2006 PASS
Beam Calculation and Rescheck Question answered. (SRZ)
Telephone call  12/15/2006 DONE
I spoke with Applicant and requested his designer to submit beam calculation and revisit Res-check with me. (SRZ)
Case Summary (BLD)  12/15/2006  
VOIDED CHANGE STATUS  12/11/2006 DONE
Failed planning and didn't respond in the 90 days left voice message for Andy on what to do with plans///12/11/06 BAS
CHANGE STATUS TO (PND)  12/11/2006 DONE
Routing - PUBLIC WORKS5/23/2006 5/24/2006 FAIL
No elevation certificate. Routed back to Jim Wylie with Public Works. (SRZ)

Need an elevation certificate, Hulls Gulch pipe rerouting plan not approved. Need to execute easement document for new pipeline when pipe rerouting plans are approved. No trees in pipeline easement. Contact Jim Wylie at ###-#### PLANS IN PLANNING HOLD BOX
Plan Reviewer's activity  5/23/2006 PASS
Plan review Pending Public works, Flood plain requirements. (SRZ)
Routing - PLAN CHECK4/28/2006 5/23/2006 PASS
routed back to public works for flood plain, Plan review not complete at this time.
Plan assigned to (SAM)4/19/20064/19/20065/22/2006 DONE
Routing - PUBLIC WORKS4/28/2006 4/28/2006 PASS
Routing - PLANNING4/21/2006 4/28/2006 PASS
Pass for CUP/CVA passing onto Julie for Historic review
Application received  4/19/2006  
Routing - PLAN CHECK12/14/2006   PASS
12/14/06 - Taken out of fail drawer and forwarded to Sam Zahorka to do the plan review. Permit cannot be issued until Jim Wyllie has all necessary floodplain documentation. (msouthard)