Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-01135
StatusFinaled
Name WILLOWBROOK DEVELOPMENT
Site Address 11031 JOPLIN RD
Project Name11031 JOPLIN
Customer NumberSEE COMMENTS
ePlanReviewNo
Description
WILLOWBROOK DEV RCE #2358//Republic Storage at Joplin (Covered Storage Building #1 -E) - To construct a new pre-engineered metal, one story, roof covered, open storage building. This building will be divided by a four-hour fire wall into two buildings (8,700 sq. ft. and 5,800 square feet). Building "E" will be for vehicle storage. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  5/4/2007 DONE
Letter of Compliance issued 5-4-07
BLD-Final5/1/20075/2/20075/2/2007ANR
DetailsJim Sly
Phone #: ###-#### Internet Inspection Request from: Staci Smith
OK for Perm................when Public Works Signs Perm.
FIRE-Final Inspection4/30/20075/1/20075/1/2007APASS
DetailsTroy Cobbley
Life safety passed. See project history for agreements with the Boise Fire Dept. on knox box, gate width and missing fire hydrant.
FIRE-Final Inspection4/26/20074/26/20074/26/2007PPART
DetailsForrest France
Okay for temp occ. per agreement with the fire dept.
FIRE-Conference4/23/20074/23/20074/24/2007ADONE
An onsite meeting was held today between Jacob Smith, of Willowbrook Construction and the Assistant Fire Marshal, Captain Mark Senteno of Boise Fire. This meeting regarded the installation of the electronic access gate and the 3rd fire hydrant that was shown on plans, but not installed. Captain Senteno has approved the 16'-10" wide electronic gate with the understanding that the installed gate will have an Opticom system installed ASAP per Boise City Fire department requirements. The remote area where the 3rd hydrant was shown on plans was not part of the permitted scope of work for this project. Captain Senteno has approved the current project as is; with the understanding that the 3rd fire hydrant will be installed under a separate building permit as construction occurs in the remote area where the 3rd hydrant is shown on current plans.
Code Occupancy Approval4/18/20074/18/20074/19/2007PPASS
DetailsCarol Montgomery
Inspected on 4-18-2007 - Meets compliance with Design Review (DRH05-00270)
BLD-Final4/13/20074/16/20074/16/2007ANR
DetailsJim Sly
Phone #: ###-####
FIRE-Final Inspection4/12/20074/13/20074/13/2007AFAIL
DetailsTroy Cobbley
Plan SP-1 whows three fire hydrants installed along Joplin Road. Only two are installed. Provide the third hydrant. The two fire hydrants installed along Joplin Road are mounted too low. See NFPA 24 - 7.3.3. The access gate into the property does not meet the minumum 20' width requirement. Also this gate needs to be provided with an approved entry system such as the Opticon System.
BLD-Framing/Rough-in4/2/20074/3/20074/3/2007APASS
DetailsJim Sly
amish; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Foundation10/23/200610/23/200610/23/2006PPART
DetailsJim Sly
robert ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Footing10/17/200610/17/200610/17/2006PPASS
DetailsJim Sly
robert; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
(F) Reprint permit  9/11/2006  
Issue PAID IN FULL permit  9/8/2006  
(F) Reprint permit  9/8/2006 DONE
Print Occupancy Form  6/22/2006 DONE
Telephone call  6/22/2006  
tlk to cornel larson ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  6/22/2006 DONE
Routing - FIRE6/20/2006 6/21/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK6/21/2006 6/21/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  6/21/2006 DONE
Plan assigned to (JCM)4/21/2006 6/21/2006 PASS
6/21/2006 13:32:14 JCM - activity updated through activity BLDA022 from case BLD06-01135.
Routing - PLAN CHECK6/14/2006 6/20/2006  
Telephone call  6/15/2006 DONE
Left message with Cornel Larson regarding resubmital requiremenst on Blngs #1 & #2. Faxed review comments to architect again.
Routing - PLANNING6/14/2006 6/14/2006 PASS
Plans have been redlined to show that Joplin Road is ROW as opposed to an easement.
Routing - PLANNING6/6/2006 6/8/2006 FAIL
Applicant has not dedicated right-of-way to ACHD on Joplin Road (a requirement of the DR).
Routing - PLAN CHECK5/9/2006 6/6/2006  
Plan Reviewer's activity  6/1/2006 PEND
Reviewed and approved resubmitted structural and nonstructural revisions. JCM
Plan resubmittals received  5/22/2006  
1 copy of cover transmittal letter, 1 copy of structural responses to plan review, 3 copies of supplemental structural calculations, 3 copies of S-7 and taken to John Menard
Plan resubmittals received  5/17/2006 DONE
Received 1 review report,1 assumed property line,1,letter & fax to Cornel Larson & 3 copys of sheets 0,SP-1,SP-2.1,A-2,A-3,A-5,A-6,S-6 S-5,M-1 taken to John .
1st review completed  5/9/2006 FAIL
Failed Planning, Plan Check and Fire.
Routing - FIRE5/8/2006 5/9/2006 FAIL
Faxed resubmittal item to Cornel Larson. Attached review comments to office copy plans.
Plan resubmittals requested  5/8/2006 DONE
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
Routing - PLAN CHECK5/3/2006 5/8/2006 FAIL
Routing Off Site - STRUCTURAL4/21/2006 5/3/2006 FAIL
Called Action Courrier for pick up to AHJ @ 11:40am BAS///4/24/06 @ 8:50AM Per John M plans should have been sent to Stapley so I called Action ans asked them to pick up from AHJ & take to Stapley///BAS - Received comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  5/3/2006 DONE
E-mailed the architect with a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PLANNING  5/3/2006 FAIL
DRH05-00270 Sarah S-Issues with ACHD ROW, etc. Called architect at 2:00 p.m. to discuss.
Routing - PLUMBING4/28/2006 5/3/2006 PASS
Routing - Erosion and Sediment4/27/2006 4/28/2006 PASS
ESC plan approved with attached conditions.4/28/06 refer to ESC06-00612 as master ESC plan for entire project.adh.
Routing - PUBLIC WORKS4/24/2006 4/27/2006 PASS
Routing - PLANNING Land Div4/21/2006 4/24/2006 PASS
Plans ACCEPTED BY PLAN TECH  4/21/2006  
Plan routing begun/NEW & ADDTN  4/21/2006  
Application received  4/20/2006