Second Notice BLD | 5/25/2007 | 5/25/2007 | 5/25/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/4/2007 | 5/25/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/4/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11574 issued 5-4-07 to Republic Storage at Joplin.
|
BLD-Final | 5/1/2007 | 5/2/2007 | 5/2/2007 | A | NR |
Jim Sly
|
|
|
Phone #: ###-#### Internet Inspection Request from: Staci Smith OK for Perm...........When Code Enforce Perms
|
Permanent Occupancy | | 5/2/2007 | 5/2/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/30/2007 | 5/1/2007 | 5/1/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. See project history for agreements with the Boise Fire Dept. on knox box, gate width and missing fire hydrant.
|
FIRE-Final Inspection | 4/26/2007 | 4/26/2007 | 4/26/2007 | P | PART |
Forrest France
|
|
|
Okay for temp occ. per agreement with the fire dept.
|
FIRE-Conference | 4/24/2007 | 4/23/2007 | 4/23/2007 | A | DONE |
|
|
|
An onsite meeting was held today between Jacob Smith, of Willowbrook Construction and the Assistant Fire Marshal, Captain Mark Senteno of Boise Fire. This meeting regarded the installation of the electronic access gate and the 3rd fire hydrant that was shown on plans, but not installed. Captain Senteno has approved the 16'-10" wide electronic gate with the understanding that the installed gate will have an Opticom system installed ASAP per Boise City Fire department requirements. The remote area where the 3rd hydrant was shown on plans was not part of the permitted scope of work for this project. Captain Senteno has approved the current project as is; with the understanding that the 3rd fire hydrant will be installed under a separate building permit as construction occurs in the remote area where the 3rd hydrant is shown on current plans.
|
BLD-Final | 4/13/2007 | 4/16/2007 | 4/16/2007 | A | NR |
Jim Sly
|
|
|
Phone #: ###-####
|
FIRE-Final Inspection | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | FAIL |
Troy Cobbley
|
|
|
Plan SP-1 whows three fire hydrants installed along Joplin Road. Only two are installed. Provide the third hydrant. The two fire hydrants installed along Joplin Road are mounted too low. See NFPA 24 - 7.3.3. The access gate into the property does not meet the minumum 20' width requirement. Also this gate needs to be provided with an approved entry system such as the Opticon System.
|
BLD-Framing/Rough-in | 4/2/2007 | 4/3/2007 | 4/3/2007 | A | PASS |
Jim Sly
|
|
|
amish; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Framing/Rough-in | 1/4/2007 | 1/5/2007 | 1/5/2007 | A | NR |
Jim Sly
|
|
|
hayden; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Talked to Hayden.......Need UL listing for (4) hr walls, appr plan, and post addresses.
|
BLD-Other | 1/4/2007 | 1/5/2007 | 1/4/2007 | A | CANC |
Jim Sly
|
|
|
hayden - firewall ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Inspection cancelled from web by: Cathy Chiles
|
BLD-Framing/Rough-in | 1/4/2007 | 1/4/2007 | 1/4/2007 | P | NR |
Jim Sly
|
|
|
hayden ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Footing | 9/29/2006 | 10/2/2006 | 10/2/2006 | A | PASS |
Jim Sly
|
|
|
robert; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley Called Eng (Keith Jones) 2500 psi design no special insp req.
|
(F) Reprint permit | | | 9/11/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/8/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/22/2006 | | DONE |
|
|
|
|
Telephone call | | | 6/22/2006 | | DONE |
|
|
|
tlk to cornel larson ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 6/22/2006 | | |
|
|
|
|
Routing - FIRE | 6/20/2006 | | 6/21/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 6/21/2006 | | 6/21/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2006 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 4/21/2006 | | 6/21/2006 | | PASS |
|
|
|
6/21/2006 13:38:24 JCM - activity updated through activity BLDA022 from case BLD06-01139.
|
1st review completed | | | 6/21/2006 | | FAIL |
John Menard
|
|
|
|
Routing - PLAN CHECK | 6/14/2006 | | 6/20/2006 | | |
|
|
|
|
Routing - PLANNING | 6/14/2006 | | 6/14/2006 | | PASS |
|
|
|
Plans have been redlined to show that Joplin Road is ROW as opposed to an easement.
|
Routing - PLANNING | 6/8/2006 | | 6/8/2006 | | FAIL |
Andrea Tuning
|
|
|
Applicant has not dedicated right-of-way to ACHD on Joplin Road (a requirement of the DR).
|
Plan Reviewer's activity | | | 6/1/2006 | | PASS |
|
|
|
Reviewed and approved resubmitted structural and nonstructural revisions. JCM
|
Plan resubmittals received | | | 5/22/2006 | | |
|
|
|
1 copy of cover transmittal letter, 1 copy of structural responses to plan review, 3 copies of supplemental structural calculations, 3 copies of S-7 and taken to John Menard
|
Plan resubmittals received | | | 5/17/2006 | | DONE |
|
|
|
Received 1 review report,1 assumed property line,1,letter & fax to Cornel Larson & 3 copys of sheets 0,SP-1,SP-2.1,A-2,A-3,A-5,A-6,S-6 S-5,M-1 taken to John .
|
Plan resubmittals requested | | | 5/8/2006 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 5/3/2006 | | 5/8/2006 | | FAIL |
|
|
|
|
Routing - PLANNING | 5/3/2006 | | 5/3/2006 | | FAIL |
|
|
|
DRH05-00270 Sarah S-Issues with ACHD ROW, etc. Called architect at 2:00 p.m. to discuss.
|
Routing - PLUMBING | 4/28/2006 | | 5/3/2006 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 4/21/2006 | | 5/3/2006 | | FAIL |
|
|
|
Called Action Courrier for pick up to AHJ @ 11:40am BAS///4/24/06 @ 8:50AM Per John M plans should have been sent to Stapley so I called Action ans asked them to pick up from AHJ & take to Stapley///BAS
|
Routing - Erosion and Sediment | 4/27/2006 | | 4/28/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.4/28/06 refer to ESC06-00612 as master ESC plan for entire project.adh.
|
Routing - PUBLIC WORKS | 4/24/2006 | | 4/27/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 4/21/2006 | | 4/24/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/21/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 4/21/2006 | | |
|
|
|
|
Application received | | | 4/20/2006 | | |
|
|
|
|